Loading...
2014, 08-12 Permit: SW-14001177 Sewer SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001177 Permit Issued Date: 08/12/2014 Expiration Date: 08/12/2015 Project Description: SEWER CONNECTION Project Name: MICA VIEW PH 1 Primary Contact: NORM'S EXCAVATING INC Applicant: NORM'S EXCAVATING INC Phone: 509-928-0580 Address: PO BOX 30873 SPOKANE,WA 99223 Phone: 509-928-0580 Email: tina@normsexcavating.com SITE INFORMATION: Site Address: 19205 E 4TH AVE Owner: EDWARDS,JAMES M& Parcel Number: 55202.0131 Address: 19205 E 4TH AVE GREENACRES,WA 99016-8737 Phone: Assessor's Description: 20-25-45: SPOKANE VALLEY SP-SHP-2013-0001 Email: (AFN#6285310)L1, SAID L1 BEING A PTN OF L14 B21 OF CORBINS ADDITION TO GREENACRES (AFN#3100770) Inspection Area: :(509)-477-3675 Water District:Consolidated Irrigation Fire District: Spokane Valley Fire District#19 Zoning: Land Area: CONTRACTOR INFORMATION: NORMSEI972BM, Exp.02/06/2015 NORM'S EXCAVATING INC PO BOX 30873 SPOKANE,WA 99223 509-928-0580 tina@normsexcavating.com DETAILS: Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 $125.00 FEE DETAIL: Processing-Utilities $26.64 Utilities Permit $125.00 Total Fee: $151.64 CONDITIONS: Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG--AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR&INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE(1)YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT(509)477-3604 FROM 8:30-5:00 MONDAY-FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30-MINUTE INSPECTION.ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. Date Printed:08/12/2014 07:44:13 Project Coordinator:Kathy Cummings SPOKANE COUNTY UTILITIES PERMIT Application Number: SW-14001177 Permit Issued Date: 08/12/2014 Expiration Date: 08/12/2015 SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed:08/12/2014 07:44:13 Project Coordinator:Kathy Cummings