2013, 10-28 Permit App: BLD-2013-2224 Pole Bldg s - 201 - /2_,2.
.rout Center
of ` 11703 E Sp -Ave, PERMIT NUMBER:
Suite B-3
Spokane Spokane Va`h ,WA 99206 PERMIT FEE:
jValley (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction New Construction [WI Accessory Bldg
Permit Application nAddition/Remodel Deck
n Other:
SITE ADDRESS: ( !I C, 6-02-_ 4 . 5P,Vi�ct & 61-w—
Pro elc
ASSESSORS PARCEL N#35-2-13---- !a4 7- LEGAL DESCRIPTIl'N: RElsCEidd
V
Building Owner: Contractor OCT 2 8 2013
Name: _QtLAName:
,p ,
Address: —,` i , /s ", Address: , Let- .0
EAW_
111
City: kArtirt, 4 0 (O4 State: Zip:Cs` City:s f s_S U B # State: # Zi 2-It.
Phone: _ ,.L 1 Fax: ` Phone: 1 2_4 _ 6 s_ Fax:2.2 zt...<—I 4(
vc,
Cgnctioc Lid clot 9)vv‘Q)Exp Date:
Contact Person C6-Business Lic.No:
Name: 1.'e_ 60-al—
Phone: cri.,6 -- Q ei
Describe the scope of work in detail: Cost of Project: $ 11o O o
t
1 — @TizA_A-r__ 3LVA.Z.0 46
Proposed Use: 2A-� 3,k3.4.1.1,..:�.- _z ._ Stipp
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: f DIMENSIONS: 1 #OF STORIES: co TOTAL HABITABLE SPACE:
MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: 4-iih '. AREA: g_
FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON
SQ. FTG: .0— 58-( 41 •-4-
#OF BEDROOMS:� Cs.ONSTRU TYPE: HEAT SOURCE: EWER 0 SEPTIC?
p - c
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be ssed.
SIGNATURE: ) •C. W" DATE:
Aim
Method of Payment:
0 Cash Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 2/15/07
residential Driveway
Spokane PAVING WAIVER
Valle k
Community Development— Planning Division
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720.5026 ♦ Fax: 509.688.0037♦plannir ®sookanevattev.org
Spokane Valley Municipal Code(SVMC)Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with
asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if
the structure you are proposing is not going to require a driveway for daily use.
PART I —OWNER INFORMATION
OWNER NAME: iL4 CZ\J PARCEL#: #35-2(--t L. g ,
ADDRESS: I9t"- (7.., 51171 4 t,_ ll*.e.t. l `),sR 212--
CITY:
t2-.CITY: _5P0l/A4/40,bl STATE: V,y ZIP: 10112._
PHONE: FAX: CELL: EMAIL:
PART Il —DETAILS OF PAVING WAIVER
1. Do you have an existing garage for parking daily use vehicles? ❑ YES NO
2. Is the proposed detached structure used for storage only? EIYES ❑ NO
3. Do you plan on using the detached structure to park vehicles? []YES ❑ NO If yes, then
what type of vehicles?
4. Do you plan to conduct a business from proposed d tached structure? ❑ YES Er(0 If so, what
is the nature of your business?
PART III —AUTHORIZATION
I,(PRINT NAME) ?°6' owner, hereby confirm that the information provided on this
form is true and correct. I acknowledge that any change in the foregoing conditions, could require
the City to impose paving requirements. I further agree to report any change in these conditions to
the Spokane Valley Community Development Department, Planning Division, within 30 days.
(u � �3 �13
Owner Vgbature t Date
PART IV — DECISION
STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT
DIRECTOR AND FIND THE REQUEST IS GRANTED AT
SAID ADDRESS FOR PERMIT#:
Planning Division Staff Signature Date
Created 6/27/11 Page 1 of 1
SPOKANE POST FRAY-7- , INC. JOB NAME 06-i P e L 4-
Engineered Pole Buildin PI-IONE : '1Z 4 g
71,6 `
shops ROLFE WILL ADDRESS 11 4 t - C� )11‘)`1.
garages Owner J C Pb144's 4„11�, ` ??2-0—
storage buildings 'L
cabins 509-926-0865 • Fax 509-924-5161 LEGAL DESCRI PT ION
kits-cost plus or 1-866-926-0865 ��
e "E7- 5 7 25—V2--- o 6 2-
7001 E.2nd Ave Visit us at .
Spokane,WA 99212 www.spokanepostframe.com
Eq'' A-c- - .
A •
•
•
Site Plan .
6:5- 11 7.---)
. 't/ ��,L
A 2 -6;- \2i5.131
• .7515 45
,_,how ( .)
North \ %'
' '44r— /00-t- ' 1,
(r\
:3-
•
Show streets/alley I f
Show septic/sewer/dralnfleld ' �F``�
Show existing buildings
Show proposed building
Show setbacks- front, rear, sides. Project #- 2
Show lot size 1 --JL�S �0 J_ 22.2 �
v
RECEIVED
OCT 2 8 2013 40,
3 CSV PERMIT CENTER - - -
ZONING CRITERIA - SPOKANE= vJ r I
SUB # I J REV. # L�� i '
If closer than 5' to property line-need firewall and parapet
Out of rear 30' and closer than 5' -need waiver from neighbor
Can't cover more than 50%of rear 25' ( Z
Corner lot-building must be 20'from property line t�
50'minimum setback from front property line
Less than 8' from residence-need firewall Cril_L%
AQtl
i-laxlmum square footage- 10%of lot area(Must be less than 3,000 sq ft.)
Hay not subdivide lot so that building is more than 10%of residual lot area
SQunty
If closer than 5' to property I Ine -need f Irewal I
10' from septic/dralnfleld
Less than 6' from residence -need firewall
atIEBAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK
AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE
ALSO CHANGES WITH DIFFERENT ZONING. -
5'minimum side yard setback
•
5'minimum rear yard setback
Minimum front and side street setback -25' from property line or 55'from
center of road-whichever Is greater
ANN
4ID Target Date sheet
For City Use Only
S1, , \ PLUS Project i)L-i)-- .f/ f ' —
p . Project Address
Valley
v 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.720-5240 ♦ Fax: 509.688.0037♦ permitcenter®spokanevaliey.org
As part of our on-going commitment to customer service during the review process of your project application,we are
providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet
this date,we will contact you with a revised target date.
Your application review TARGET DATE is /Q O
The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is
not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
D Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be
several days before they can look at your new or revised information.
D Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise
for dealing with reviewer comments would be the best choice for the entire review process.
D Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your
target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will
save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as
indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does
not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from
substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is
complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review.
3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review.
Depending on the type of project,technical staff may include multiple reviewers. You should be contacted by phone, fax,email,
or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical_compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center.When all sections of the
application are received,a Permit Specialist will process the application and contact the person specified on your application for
permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at
that time.
CD-003 V-7/06-21-11 Page 1 of 1