1988, 07-01 On-Site Sewage Disposal SystemSpokane County
Department of Building & Safety
JAMES L. MANSON, DIRECTOR
ON-SITE SEWAGE DISPOSAL SYSTEM INFORMATIONAL REVIEW FORM
For Single Family Residences
TO Spokane County Environmental Health Division
FROM: Spokane County Department of Building and Safety
DATE: 7- 1 - , 198
RE On Site Sewage Disposal System
REF : Describe Proposal : D oL.)3i...E- wtD� Mc' 1'-E_
Property Owner _ ilawA,2 c.. a YO e.14.
Road Name 5 -1-14
Parcel Number 2o.41l - l2lS
Street Address E. 1 p4t7 7 S v2-4
Legal Description:
SIGNED:
kt V4 S - z -t' $ -T-ZS , z-L4`E
Pro .osed Owner Aut'orized Representative
r
1. An initial review of the above -referenced property has been
conducted by the Spokane County Planning Department and the
following items are noted. An in-depth review of the property will
again be made at the time a building permit is applied for.
Requirements reviewed for property as of the date set forth
hereinabove.
Date: 2—/ ms`s
Yes/No/N.A
Dedicatory Language within Plat
1.65- Subject Property is Legally Divided
Certificate of Exemption Required
Use Authorized Under Zoning Ordinance
Setbacks Met in Zoning Ordinance
Shorelines Permit Required
y e5 Variance Required for Following Purposes:
V -7 S —7,, .
Other:
Planning Department:
Date •"7/A7
77
As.
NORTH 811 JEFFERSON
•
SPOKANE, WASHINGTON 99250.0050 TF1.F.PHONF (5fl9)45fi-9675
On -Site Sewage System Review Form
Page 2 of 2
2. An initial review of the subject property has been conducted by
the Spokane County Engineer's Office and the following items are
noted. An in-depth final review of the property will again be made
at the time the building permit is applied for.
SPECIAL REQUIREMENTS:
Maintained County Road Frontage'i�"'�
Approach Permit Required _V -VC/-o �HYJ� �
Flood Zone
�a/
Variance Requireme�
.44
rOther;.j 0_7
Engineer's Office:
/11/
l
3. The Spokane County Jpartment of Building and Safety has a vised
the property owner/rep esentative that at such time a structure or
building is to be placed/constructed on the property, a building
permit will be required.
Date:' ./
alr
Building and Safety Department: Date:
NOTE: The review by the various departments as provided for herein
is solely for the purpose of advising the Spokane County Health
District of the subject property's compliance with various codes and
regulations. The issuance of a permit by the Spokane County Health
District for the installation of an on-site sewage disposal system is
not to be considered as a vesting of a right by the owner/rep-
resentative to obtain a building permit for the property. At the
time that a building permit is applied for, the subject property must
comply with all applicable federal, state or local laws, ordinances
or regulations with the exception of those relating to the issuance
of a permit for the septic tank/drain field on-site sewage disposal
system by the Spokane County Health District, pursuant to this form.
Accordingly, although as of the date of this document the subject
property may meet certain federal, state or local laws, ordinances or
regulations, in the event such items change between the date of this
document and the application for a building permit, the ow-
ner/representative will be responsible for meeting such regulations
on the date of the application for the building permit.