2010, 10-19 Permit App: 10003426 Pole Bldg Project Number: 10003426 Inv: / Application Date: 10/19/2010 Page 1 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information:
Permit Use: 24 X 24 POLE BLDG Contact: YEOMAN,GARY&LAURA
Address: 6909 E 6TH AVE
C-S-Z: SPOKANE VALLEY,WA 99212
Setbacks:Front Left: Right: Rear: Phone: (214)203-1263
Group Name:
Site Information: Project Name:
Plat Key: 000735 Name: EMPIRE HEIGHTS ADD District: Sout
Parcel Number: 35241.2811 Block: Lot:
SiteAddress: 6909 E 6TH AVE Owner:Name: YEOMAN,GARY&LAURA
Address: 6909 E 6TH AVE
Location::CSV SPOKANE VALLEY,WA 99212
Zoning: MF-1 MF MDR District
Water District: 020 EAST SPOKANE Hold: ❑
Area: 7,620 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: ��
Review
Building Plan Review Released By:
Originally Released: 10/18/2010 By: tmelbourn
Landuse/Zoning/HE Conditions Released By:
Originally Released: 10/19/2010 By: tschmidt
Driveway/Approach Released By:
Originally Released: 10/19/2010 By: WMCGAV
Permits:
Operator: JD Printed By: jmm Print Date: 10/19/2010
Project Number: 10003426 Inv: 1Application Date: 10/19/2010 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Approach
Contractor: FOOTE CONCRETE CO Firm: FOOTE CONCRETE CO
Address: 18417 E ALKI Phone: (509)924-6622
SPOKANE VALLEY WA 99016
Item Description Units Unit Desc Fee Amount
APPROACH-CONST IN ROW 1 NUMBER OF $52.00
Permit Total Fees: $52.00
Building Permit
Contractor: OWNER Firm: OWNER
Phone: (000)000-0000
This Application: Total Project:
Description Grp Type Notes Sq Ft Valuation So Ft Valuation
GAR WOOD U-1 VB 576 $10,944.00 576 $10,944.00
Totals: 576 $10,944.00 576 $10,944.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE 1 SELECT $195.25
ACCESSORY PLANS REVIEW 1 SELECT $48.81
WSBCC SURCHARGE 1 SELECT $4.50
Permit Total Fees: $248.56
Notes = F
Payment Summary: ,. _
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Approach $52.00 $52.00 $0.00 $52.00
Building Permit $248.56 $248.56 $48.81 $199.75
$300.56 $300.56 $48.81 $251.75
Disclaimer:
Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm Print Date: 10/19/2010
Permit Center
SCITY OF ----.,. 11703 E Sprague Ave,Suite B-3 - PERMIT NUMBER: 1 —9_43
pokane Spokane Valley,WA 99206 PERMIT FEE:
, OValley. (509)688-0036 FAX: (509)688-0037
www.spokanevalley.org
Community Development
Residential Construction New Construction X, Accessory Bldg
Permit Application nAddition/Remodel Deck
n Other:
SITE ADDRESS: 69 D 9 E , 6
71+
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: LtV 0 (7.0w/6Al2,7 -100,010 Contract i •
.,//
Name: &-A1)4 \iW� N Name:
Address: 2,96,ci E` 6-Ef Address:
City: C Pn vI Lill State: IN t I� Zip:02 !i City: - ate: Zip:
Phone: (,I ti 106 , ,� Fax: L.1 Phone: Fax:
Contractor 'c No: Exp Date:
Contact Person I City Business Lic.No:
\
1
Name: P„\-1 7 i 6� KI
Phone: 9.-414 in, 12,03
C
Describe the scope of work in detail: Cost of Project: $ L1000
if x - M --�;�; L Poi 1= 1Jr(-p/t:6-
Proposed Use: GA {-E1 5 i7 R/-A I
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: / #OF STORIES: TOTAL HABITABLE SPACE:
b4 f---f-c 1 a't'>( z I N o�i-E-
MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: j I J'A-\ f'S l"A / AREA: 76
FINISHED BAS ENT GARAGE SQp FTG: DECK/COy P TIO SQ. FTG: 30% SLOPES ON Alk
Iv -
SQ. FTG: 571� 0 td--- PROPERTY:
#OF,:riEDDROOMS: NSTRUCTION TYPE: HEAT SOUR E: SEWER OR SEPTIC?
NN p6LE DApp N - 5 Ew R
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before
this application can be processed.
SIGNATURE: j i1 \j"Cf" —' DATE:
Method of Payment: ECENP
0 Cash 0 Check 0 Mastercard ❑ VI• •
Bankcard#: Expires: VIN#: ,' CSV PERMIT CENTER ER i
Authorized Signature: OCT I 5201e
REVISED 2/15/07 l..
Nva- - - 1
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
❑ SITE PLAN
o Property lines and dimensions o Setbacks to property lines
o Direction arrow pointing North and orientation to streets o Distance between buildings
o Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes
o Utilities, septic tank/drain field locations and distances ❑ Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement:
❑ Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations ❑ Supporting wood cripple walls or beams
o Perimeter concrete foundation wall sizes ❑ Thickened concrete pads supporting
o Crawlspace ventilation beams or girder trusses
❑ Floor Plan of each level (finished or unfinished)with dimensions:
o Floor Joist direction, size and spacing o Window and door location and sizes
o Header, beam or concrete lintel sizes o Window well locations if applicable
o Brace wall panel locations o Room usage labels
❑ Water heater and furnace locations o Smoke detector locations
o Exhaust fan locations ❑Attic and crawl space access locations
o Deck or concrete patio sizes and locations o Fire Wall construction
❑ Roof Plan:
o Engineered truss direction and spacing o Ridge, eave and valley lines
o Rafter and over frame direction, size and spacing o Beam and girder size and location
❑ Wall Section Detail including:
Roof
o Slope/roofing material/underlayment/ice dam protection o Truss or rafter size, spacing &connection
❑ Sheathing size and type o Attic insulation/air space baffle/ventilation
Ceiling
❑ Joist size and spacing o Size of ceiling gypsum wall board
Wall
❑ Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts
o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board
Floor
❑ Joist size and spacing o Sheathing or concrete floor size/insulation
Foundation Wall
o Concrete or Masonry unit width o Footing bottom to finished ground level depth
o Earth to wood separation distance o Horizontal &vertical reinforcement if any
Footing
o Size o Reinforcement if any
Radon
o Passive system with 6mil vapor barrier ❑Active system with 6 mil vapor barrier
Miscellaneous Construction Details
❑ Deck:
o Floor plan/side view/dimensions o Footings/post/and beam size and locations
o Floor Joist/decking direction, size and spacing
O Stairway tread rise& run and nosing 0 Handrail/Guard height&spacing
Heather Morris
From: Wayne McGavran
Sent: Tuesday, October 19, 2010 9:47 AM
To: Permit Center
Cc: Scott Wallace
Subject: RE: 10003426-approach
1 approved this approach,today.
Wayne
From: Jenna Davis On Behalf Of Permit Center
Sent: Tuesday, October 19, 2010 9:30 AM
To: Wayne McGavran
Cc: Scott Wallace
Subject: 10003426 - approach
Thanks
Jenna Davis, CUT
Uermit Specialist
City of Spokane Valley
11703 It Sprague Ave ST [3-3
Spokane Valley, Wa 11200
(504)720-5301
fclavis@spokanevalley.org
Permit Center
SCYOF1;cI �. PERMIT NUMBER:
11703 E Sprague Ave,Suite B-3pone Spokane Valley,WA 99206 PERMIT FEE:
Valley. ,40 . (509)688-0036FAX: (509)688-0037
vw.spokanevalley.org
Community Development
Approach Permit Application
ifamiallielasso, 6q0"1 E 6,4-6-
it - 2i - 20/ 0 amirimmtwook044,4444404iiih E--
Building Owner: LmiRA. n. 7,l 67 y .♦X.r , Contractor: f-D~rF / �,NjoRt-TE
Name: Z Name: 5d ZZ � (--`,�(.��
Address: 6Q c £ Address: I ch LI 7`G I A- AUL,
City: Co 5✓ State: W,4 Zip /1_ City: State: Zi
l,1?���>=5 v�q p:Cf)OC(0'
Phone: z( / Zpg 12103' Fax: Phone: "Q Fax:
Contact Person Contractor Lic No: T ECC 935 Date: b 20 Ci
Z�
Name:
City Business Lic.No: (70 2-1 17 laic
Phone:
PROJECT DESCRIPTION (Provide site sketch)
Residential Driveway Commercial/Industrial Driveway
Existing Curb&Gutter Rural Road Section
Culvert Installation Sidewalk Repair/Construction
v A Other Conditions T\Cp P RD n 4 /1'k i U L1/444/7
Bond/Insurance certification must be on file with the city.
DISCLAIMER
The permittee verifies,acknowledges and agrees by their signatures that: 1)If this permit is for construction of or on a dwelling,the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner.3)The
signatory is the property owner or has permission to represent the property owner in this transaction.4) All construction is to be done in
full compliance with the City of Spokane Valley Development Code.Referenced codes are available for review at the City of Spokane
Valley Permit Center.5)This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,
codes or ordinances. 6)Plans or additional information may be required to be submitted,and subsequently approved before this
application can be processed.
Signature b illt Date /0 i -o l r
Method of Payment:
❑ Cash 0 Check 0 Mastercard 0 VISA
Bankcard#: Expires: VIN#:
Authorized Signature:
REVISED 319106
APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and include street name.
Check all existing conditions that apply:
❑ Sidewalk ❑ Drainage Ditch
ft wide ❑ Drywell (show location on sketch)
ft from back of curb ❑ Other (please describe below)
O Streetside Swale
w l DISTANCE FROM
zNEAREST PROPERTY LINE
•
MAY BE LEFT OR RIGHT SIDE)
Li FT(SEE TABLE)
w
a,
CC
0-1 CONCRETE
APPROACH CURB
RETURN
CURB NG' THROA EEITABLE)TVVDTH�FT NG \IF CORNER LOT,
DISTANCE FROM
STREET NAME CURB RETURN
n FT(SEE TABLE)
STREET WITH CURB
w i DISTANCE FROM
NEAREST PROPERTY LINE
MAY BE LEFT OR RIGHT SIDE)
FT(SEE TABLE)
c8115'RADIUS RADIUS
ASPHALT
APPROACH RETURN
EDGE OF �THRO(EE TB�IDnFT--I NIF CORNER LOT,
ASPHALT
DISTANCE FROM
STREET NAME RADIUS RETURN
Q FT(SEE TABLE)
STREET WITH ASPHALT EDGE
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50% of frontage width.
Residential Approaches Commercial Approaches
Distance from Curb/Radius Return
15'minimum 75'minimum
Separation between Approaches (measured See Page 7-27
from centerline to centerline of each None specified in City Street Standards
approach)
Throat Width (flat portion) 16'min., 30'max. 30'min., 40'max.
Wing Width (at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line
(@ r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' 5'
SpoIiie RECEIVED
De elopment Engineering
OCT 19 2010
4•••00\'álley Spokane Valley Permit Center
11 I pra•i- ••- .• '= ♦ Spokane Valley WA 99206
509.921.1000 ♦ Fax: 509.921.1008 ♦ cityhall®spokanevalley.org
Approach Permit Application Review
TO: Building Department
Site Address: 6909 E. 6th Ave.
Project No: 10-3426
Accepted Not Accepted
Approach *X
Building Location
Paved Access
Notes: Saw cutting of existing curb is not allowed within the City's
jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior
to concrete placement.
*Approach to be constructed per City's Standard Plan R-114 (Driveway
Approach Asphalt)
Reviewed By: "I £2 i d Date: /o—!r/D
New project
Project Previous pre-app meeting Q
spokaCITY Mk {� {�^� 0
ne Transmittal T_.. Plan revisions
City of Spokane Valley Transmittal Date:
Community Development Monday, October 18,2010
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,\VA 99206
Phone:509.688.0036
Site Address: 6909 E 6TH AVE Project Number: 10003426
Parcel Number: 35241.2811
Zoning: MF-1 Water District: EAST SPOKANE
Fire District: FD 01
Applicant: YEOMAN, GARY& LAURA Owner: YEOMAN, GARY& LAURA
6909 E 6TH AVE 6909 E 6TH AVE
SPOKANE VALLEY, WA 99212 SPOKANE VALLEY, WA 99212
(214) 203-1263
e-mail: e-mail:
Contact: YEOMAN, GARY& LAURA Occupant:
6909 E 6TH AVE e-mail:
SPOKANE VALLEY,WA 99212
(214) 203-1263 •
e-mail:
Contractor: OWNER Arch/Engineer:
( ) - 0
e-mail:
Project 24 X 24 POLE BLDG
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION
SITE PIAN
PLANS ,
Please send all plan review and project comments via e-mail to the
highlighted individuals.
•
• APPROACH PERMIT APPLICATION
REQUIRED SKETCH INFORMATION (Revised 1/25/10)
Provide required measurements (in sketch boxes), and Include street name.
Check all existing conditions that apply:
❑ Sidewalk 0 Drainage Ditch
ft wide 0 Drywel! (show location on sketch)
ft from back of curb 0 Other (please describe below)
❑ Streetside Swale
DISTANCE FROM
NEAREST PROPERTY LINE •
• AY BE LEFT OR RIGHT SIDE)
FT(SEE TABLE)
0
n l CONCRETE
APPROACH !RN
CURB" I•-•4'-----THROATWIDTH OFT— --�-4'-•i
WING (SEE TABLE) WINO �1F CORNER LOT,
DISTANCE FROM
STREET NAME WM RETURN
I FT(SEE TABLE)
STREET WITH CURB
w DISTANCE FROM
z • - NEAREST PROPERTY UNE
AY BE LEFT OR RIGHT BIDE)
FT(SEE TABLE)
to
15'RADIUS
ASPHALT RADIUS
APPROACH RETURN
•
EDGE OF --THROATWIDTH -"i
FT1
ASPHALT (SEE TABLE) IF CORNER LOT,
DISTANCE FROM
STREET NAME RADIUS RETURN
=FT(SEE TABLE)
STREET WITH ASPHALT EDGE
•
Approach Requirements:
• Maximum 2 approaches per property frontage; one on arterials.
• Total width of approaches not to exceed 50%of frontage width.
Residential Approaches Commercial Approaches
Distance from Curb/Radius Return
15'minimum 75'minimum
Separation between Approaches(measured See Page 7-27
from centerline to centerline of each None specified • In City Street Standards '
approach)
Throat Width (flat portion) 16'min.,30'max. 30'min.,40'max.
Wing Width (at curb line) 4 feet typical 4 feet typical
Minimum Distance from Side Property Line •
(@ r/w) 5.0' 5.0'
Minimum Distance from Crosswalk 5' 5' •
NM i\ planners
. .Isii I ——..--
PACIFIC engtneers
6,1 AS C G COPAnnY,
01\I landscape architects
0
C-Z)
• .1, r.:1
DJ
127'
. / c3
LOT ice x iti* LI::
7 2,13 .55 . 4% 1
1
LU
LI - --
-4
S34 •
wE-2(6TILI, :z
cz . . F-
11046E Cl.. a-.) ci
r /
14-A72—
i• i 1
t Uo '
Ni 5Q.FT. 1
‘110 21/-2, 2.11-
,
6 v)
-0
.
m
,
---
, 's
• RECEIVPD I +\7,1 / i ,
\
'\.1
CSV PERMIT CENTER 1 /
cp -oct7c2c
\OCT TII I cO4 g cua °I 1 3 2iiii3
i L 6
Project tc _AS _ _ —4 cu cci o)
Name_ _4 :zt. ' \,. ..,, \' n\II___..%-
-
Zt &A 'A (-- 0-1)
w 71 0)t 0
/ '''. • al CD (7 a.c 25 -C-43
4--)
qii 4/
. i
0
. E . (0909 16 lai-- A vc.,
' .7,'-14.4itAmilirkijUrmor---11...-+-. JUU
'. FARcEL 4-- 35291 . 2811
FLL .;iieet iio. ui
Job No. Prepared by Date Checked by Date
°'' For City Use Only
CITYSpokane
PLUS Project Number Project Address '
1 .. . , . , . .. . . . . .
. .„:„:;.::,, al a 11703 E Sprague Ave Suite:1371 3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax; 504.688.0037 :permitcenter@spokanevalley.org..
As part of our on-going commitment to .customer service during the review process;of your project'
application, we are providing you with a TARGET DATE for the initial technical application-review:'If for
any reason we cannot meet this date,we:will contact you with a revised,target,date
Your application review TARGET DATE is - ( > / \. . :• .
The TARGET DATE is the date"we estimate your project application will have .had its initial•technical •
review. It is not the date for approval or permit issuance. '
• Tips for a Smoother Project Application Review
. > Submit complete,.accurate plans,and documents. ' • .
Lxb•a tithe may be required for're-submittals..as project`application reviewers work an rirriltiple'applrcations and it
may be several days before they.cari look at your new orlrevised ink rniatiorr:, •, .
> Designate a specific contact person to communicatewith the City.' • '
While the person designated as the applicant's contact`per sb�r with the City can,be.changed,:one individual with the
expertise for dealing with r•evielVer comments would be the best choice,for the entire review process. :
> Call staff regarding the status of your project only after the target date shown at the top of the page
Although you should be contacted on or bythe target date,please feel free to contact usifyou haven't heardfr•om irs
by your target date. Stall map contact you before'the target date if the,initral'review is complete By following this
procedure,you Will save time and allow the reviewer's to complete the work more e peditioirslY.. ;
. • Steps in the.Permit Process .
I. Counter Complete.. Your application, has been accepted:•as counter :complete. This means:all.of•the required
documents, as indicated on your Pre-Application:Check'list have"been submitted" of have been appoved`` for:•defer ed . .
submittal:Thisdoes not prevent technical staff from requesting additional.information:as•a result of their technical review.
2. Quality Check. The next step in the process is.a quality check to"make sure'that the application is reviewable and free
from substantive flaws that:would prevent technical staff from completing the technical review once it is started.. :When
this step is complete, your application will be routedto the appropriate "staff and remain in their review queue until it
conies up for review. '
3. Technical Compliance, Once an application is.administratively complete, it is routed'to technical staff for compliance
review. Depending on the type of project, technical staff may.include,'multiple revieweis:.You should.be contacted by.
phone,fax,email,or mail by your TARGET DATE once the.initial technical compliance"review is complete
4. Permit Issuance. When the technical compliance review of the application pis complete,including subsequent re-,
submittals, each reviewer will approve their section of the application and route it to the Peinirt Center When all sections
of the application are received, a Permit Specialist will process the application and contact the person:specified on.your
application for permit pick-up. Information regarding fees and pre-construction Meetings(if required) will be provided by
the Permit Specialist at that time. •
WHITE-APPLICANT PINK-BUILDING FILE REV 9/07