Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 08-06 Permit App: 08002872 MH
Project Number: 08002872 Inv: I Application Date: 8/6/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 17 X 37 1976 CHAMPION Contact: WATSON,E MAE Address: 6909 E 6TH AVE C-S-Z: SPOKANE,WA 99212-0512 Setbacks:Front Left: Right: Rear: Phone: (509)928-0372 Group Name: Site Information: Project Name: Plat Key: 000735 Name: EMPIRE HEIGHTS ADD District: Sout Parcel Number: 35241.2811 Block: Lot: SiteAddress: 6909 E 6TH AVE Owner:Name: WATSON,E MAE Address: 6909 E 6TH AVE Location::CSV SPOKANE VALLEY,WA 99212-051 Zoning: MF-1 MF MDR District Water District: 020 EAST SPOKANE Hold: ❑ Area: 7,620 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: Review Landuse/Zoning/HE Conditions Released By: Existing Mobile Home is considered legal non-conforming. Assume was allowed use when established in 1976; no permits in file.Permit issued to allow owner to proceed with safety inspection and title elimination. As per K.McClung Originally Released: 8/6/2008 By: tschmidt ermits Manufactured Home Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount INSPECTION FEE 1 #SECTIONS $50.00 Permit Total Fees: $50.00 Operator: JD Printed By: jmm Print Date: 8/6/2008 Project Number: 08002872 Inv: 1 Application Date: 8/6/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Notes: Existing Mobile Home is considered legal non-conforming. Assume was allowed use when established in 1976;no permits in file.Permit issued to allow owner to proceed with safety inspection and title elimination.As per K.McClung Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Manufactured Home $50.00 $50.00 $0.00 $50.00 $50.00 $50.00 $0.00 $50.00 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/6/2008 4 � (Staff Use Only) Siokane PERMIT NUMBER: Valle PERMIT FEE: Y CITY OF SPOKANE VALLEY Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter@spokanevalley.orq MANUFACTURED HOME PERMIT APPLICATION ❑ OTHER / -Q / SITE ADDRESS:+ (..P 909 E (QL A € . $�QQW LQ� �n 99aDa ASSESSORS PARCEL NO.:,2,5a4.11_ ?g f l LE ,GAL DESCRIPTION: toys aLi O5 �n )Q ae ii€ ht5 M�i+i©�,acco CK' hij tv JId BUILDING OWNER NAME: .c g.e.G0fael i n 110/WYO. "f '-f 10/4,6. e 33. NAME: EMae- 1.00`+SOn / ADDRESS: LOCI 0 9 E (Q, R' . CITY: S1�(QJ1�Q STATE: GOR ZIP: l.X�/a \ PHONE: Y FAX: CELL: ONTACT NAME: She1 2( ty PHONE:509 9s' - as© l FAX: CELL: CONTRACTOR NAME: MAILING ADDRESS: CITY: STATE: ZIP: PHONE: FAX: CELL: CONTRACTOR LICENSE No.: EXPIRES: CITY BUSINESS LICENSE NO.: DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE: frldd. l e +o rY\e__ edLctorN w- rr uuri e Ferem--)a-ylo,elk pRofeelj a.r.o'(/© z a-F4 u ma..k-e i1.e4t 1rac )e-ie . ©MANUFACTURED HOME WIDTH: a MANUFACTURED HOME LENGTH: 3.7 YEAR OF MANUFACTURED HOME: ICI (e PIT SET: SEPTIC/SEWER: 3exoQXZ Effective October 28, 2007 Page 1 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Manufactured Home Permit App.l.doc • n MANUFACTURER: Ck0.-m p 7 ©r PREVIOUS ADDRESS: W V.c PROPOSED USE: (nbb; Q. 1ciOrr-Q. f R2 Si S evf idL J DISCLAIMER The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional information may be required to be submittedand approved before this application can be processed. Signature X4,' ZWd._ Date: 7' Method of payment: ❑ Cash ❑ Check ❑ Visa ❑ Mastercard Bankcard #: EXP: VIN#: Authorized Signature: Effective October 28, 2007 Page 2 of 2 http://www.spokanevalley.org/uploads/Community_Development/Documents/Forms/Building/Manufactured Home Permit App.1.doc c • Newproject ' oita#0,4***,.., Project Previous pre-app meeting El Suno ne Transmittal Plan revisions 0 City of Spokane Valley Transmittal Date: .00017alley Commuiuty Development Thursday,July 24,2008 Department 11703 E. Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 6909 E 6TH AVE Project Number: 08002872 Parcel Number: 35241.2811 Zoning: MF-1 Water District: EAST SPOKANE Fire District: FD 01 Applicant: WATSON, E MAE Owner: WATSON, E MAE 6909 E 6TH AVE 6909 E 6TH AVE SPOKANE, WA 99212-0512 SPOKANE, WA 99212-0512 (509) 928-0372 _r e-mail: 1--(A,4( e-mail: Contact: WATSON, E MAE Occupant: 6909 E 6TH AVE SPOKANE, WA 99212-0512 e-mail: (509) 928-0372 e-mail: Contractor: OWNER Arch/Engineer: ( ) - 0 e-mail: Project 17 X 37 1976 CHAMPION Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN Please send all plan review and project comments via e-mail to the highlighted individuals. iN _ . , 1 0 T I i ^ e--- , i "1\ \—1 Z \,-- 1-4.,.„..---.= IN..,0. i '' I \ ...- --,.... .....) _.....--. 7 i ......) 1 t'Nfl. I I —r- )s, c.4- \.)-- \f,-... [ € • c.„, . 7,. i , 2 ,c-,k i 's• ---- e , i'-- '-C-a‘ ) 1 t fil A ? ! --,-, : •,.. \ t 2 - -.-. L... v., .." (Dci 0 9 E (D '. 1-\\-1-C PLANNING DEPT. APPROVED 1 F-7--: .,,,r., DATE: '6/6/(e% i 3 , _ ___.___ _____ 3 _—. i sV --...- 60 ''3 ..,:- / ""-' Project#Search GroupName Search: Project NIsms e Search: CSV 08002872 1 "''14,,i,..„'''''-',4'' ! fin4y '4''''''''71627,15;',7t"=1 �.4 e�4M�x '""k A ,yj sP. ', , b.n., a„ ° \ '` ,“',,,,,,%.',�wzJ�P, �' '°ia; i �t"aU s C�t�SP�1�,�. Y` s 71627 ,,mawe a;Ret eR`i -; ��` a,C Sys +s,:y Y,n,zna u` is a a:, mss .E ;,,,,, yea17X 37 196 CHAMPIONx S1 d:14;_ .i,.. ,>,sro s c,�R �s ..�, a. ' et '�d � . a ., �,. . �.,,:.: ,w;re,z ;a.. � - -cso�w :,,,,,,, ` '�.`k'�?-� �i z Ifbotti s� .r �slitting' Irina op Off N 4000 CONDITIONS 8/6/2008 tschmidt ❑ Existing Mobile Home is considered legal non-conforming. Assume was allowed use when established in 1976. no permits in file.Permit issued to allow owner to proceed with safety inspection and title elimination.As per K McClung } owth ��i SOUTH II Plat trte DoCUmene For City Use Only SCITY OFr PLUS Project Number pokane Project Address ValleY° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is `""1 13 \ n t' The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. > Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07