Loading...
1980, 02-11 Permit: 80-1036 Heat Pump, Furnace PLAN NUMBER APPLICATION/PERMIT PERMIT NUMBER SPOKANE COUNTY — BUILDING CODES DEPARTMENTMD - 1D3f0 NORTH 811 JEFFERSON / SPOKANE,WASHINGTON 99260 / (509) 456-3675 DATE / ,S'/ c?lJ APPLICANT: COMPLETE NUMBERED SPACES — PRESS HARD TO MAKE 4 COPIES JOB ADDRESS ..........41......" 0 4 * * 9.0 0 1. /�j `; a� 4, LEGAL DESCRIPTION — SEE ATTACHED * 9.0 0 07 LOT L CK SUBDIVISION PARCEL NUMBER/S * 9.0 0 C.3 2. OWNER PHONE E * 0,0 0 8 3. p . (�vt e },<_,,J_.0--„_--- y a L --a Z Is' 1 0 3.5 2 ADDRESS ZIP Required Set Backs in Feet fY ---7-9-1—.2--- North 'South East (West 0 2- 1 1 -8 0 CONTRACTOR PHONE Size of Parcel Zone Classification 4. 9/ 6-r"`� , ? :i-7 ' � d .6- °y-yyT,s 2 6 4 7 9. ADDRESS ZIP Type Const. Occupancy Sprinklered rc (? .,1-/ , `�-. , � 9 . e 6- Oyes ❑No CI Req'd. DESIGNER 1�Y[/� H PHONE Valuation Building Area in Sq. Ft. 5' ADDRESS ZIP DWL Area I Basement Area Garage Area I Storage CHANGE OF USE FROM TO Split Entry Split Level Rancher 6. TYPE No.Baths No. Floors No. Rooms Rec. Room ❑ NEW ❑ ALT. gAD'N. ❑ RPL. ❑ MVE. 7, OF ❑ OTHER - CERTIFICATE Req'd. Recd. Not Req'd. WORK ❑ BLD. CI PLMB. ❑ MECH: ❑ M.H. ❑ POOL of EXEMPTION DESCRIBE WORK 8. 1---i p ? - as to / - /,G>,et-/ ���� ti-J.L. - tip- . ',� , ..-"...,-�.t.e. FEES COLLECTED VALUATION Source GAS EL CTRIC ATER 1 I SEWER of 9. Utilities Single $ I hereby certify that I have read and examined this application and have read the "NOTICE" provisions included on reverse side, and know the same to be true and correct. All provisions of laws and ordinances governing this Building type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. Plumbing DATE SIGNATURE_ Mech. —= SPECIAL APPROVALS SPECIAL CONDITIONS: DEPT. REQ'D. REC'D. Plan Check Env.Health SEPA o v Planning — w Mobile Home Fire Marshall Z Co. Engineer Other (Specify) Utilities TOTAL $ Zone Clearance WHEN MACHINE VALIDATED IN THIS SPACE, SEPA Checklist THIS BECOMES A PERMIT. DATE2'11e) ` OFFICIAL ') 1,1 — Q O. i (�J‘3, 6 * 9.0 Li :'1 APPROVED FOR ISSUANCE