Loading...
2010, 06-24 Permit: 10001861 Water HeaterPERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 11003 E 5TH CT Parcel Number: 45212.2205 Subdivision: Block: Lot: Zoning: MF -1 MF MDR District Owner: BRANZ, CLINTON P AND CHERYL L Address: 11003 E 5TH CRT SPOKANE, WA 99206-2850 Building Inspector: SOUTH Water Dist: MODERN Project Number: 10001861 Inv: 1 Issue Date: 06/24/2010 Permit Use: 1 FUEL BRNG WTR HTR Applicant: KTU PLUMBING 3703 E BROAD SPOKANE, WA 99217 Contact: KTU PLUMBING 3703 E BROAD SPOKANE, WA 99217 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 489-3766 Phone: (509) 489-3766 Rear: Permits Mechanical Permit Contractor: KTU PLUMBING License #: KTUPLP*945Q0 GAS WATER HEATER FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. 1 $11.00 PROCESSING FEE Total Permit Fee: $37.00 $48.00 Payment Summary Total Fees AmountPaid AmountOwing $48.00 $48.00 $0.00 Tran Date Receipt # Payment Amt 06/24/2010 23242 $48.00 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT 6 ay7� aer NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING — when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/pernittee's expense. FOUNDATION — when forms and reinforcement are in place and prior to placement of concrete. PLUMBING — after rough -in, before covering, and final. MECHANICAL — rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING — after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL — when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special inspections' in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pemits and Inspections for electrical wiring, Slate Department of Labor Permits and inspections for Sewer Connection. Spokane County Utilities Division Md industries 324-2640 477-3604 Pemits and Inspections for on-site septic systems, Spokane Regional Fire sprinkler and alarm systems and private access road Inspections, Spokane Valley Health District 324-1560 Fire Department 892-4122 Stale law RCW 19.122 requires Nat prior to any excavation the -CALL BEFORE YOU DIG- center must be flogged. Call before you dig al least 2 working days In advance. 456.8000. PERMIT EXPIRATION AND REFUNDS All permits sballexptre by iimitatign and-be1edared void if a) work is not started within 180 days of obtaining a permit, or b) work is abandonedrfor180 days or more After beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. lea Intim expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date City of Spokane Valley Building Dept Receipt Receipt Number: 23242 Customer Number Projects Project Nbr Inv Nbr i Fee Amb 10001861 1 0 $4$.OQ' Miscellaneous Items Tender Notes: Tran Date / Time: By: Logon User: Station: Override By: Check Acct f�r_.a bxer:J Inv Ami sajaa Full Owinj4 PAID Pmt $4R 110 j $48.00 Total: _ S48.QOJ S4&QQ j Balance CC Nbr 06/24/2010 1:15:26 PM HMORRIS BldgCounter CX_SV00014A $48 00m $48.00 Total PAID: $48.00 Exp Datei TENDERED xxxxxxxxx6068 02/20131 48.00 Total TENDERED: Over / (Short) Change 48.00 $0.00 $0.00 Printed: 06/24/2010 1:15:27 PM Page I of 1