Loading...
2007, 04-03 Permit App: 07001090 Addition Project Number: 07001090 Inv: 1 Application Date: 4/3/2007 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project In formation: Permit Use: CORRECTIONS TO ADDITION AND Contact: MYERS CONSTRUCTION CO CARPORT/EXPIRED PERMIT RENEWAL Address: 1603 S ROCKY RIDGE DR C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-5434 Group Name: Site Information: Project Name: Plat Key: 000735 Name: EMPIRE HEIGHTS ADD L_ ` District: Sout Parcel Number: 35241.3522 Block: Lot: SiteAddress: 7123 E 6TH AVE Owner:Name: BRANCH,DOUG Address: 5244 45TH AVE Location::CSV SEATTLE,WA 98136 Zoning: UR-7 Urban Residential-7 Water District: 020 EAST SPOKANE Hold: ❑ Area: .00 Acres Width: 60 Depth: 127 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Building Plan Review Released B , Originally Released: 4/3/2007 By: TMELB I U r Landuse/Zoning/HE Conditions [Released B1 k 0-1 v. Building Permit Contractor: MYERS CONSTRUCTION Firm: WAYNE MYERS CONSTRUCTION Address: 1603 S ROCKY RIDGE DR Phone: (509)535-5434 SPOKANE,WA 99212 Operator: JD Printed By: JD Print Date: 4/3/2007 Project Number: 07001090 Inv: 1 Application Date: 4/3/2007 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: CORRECTIONS TO ADDITION AND Contact: MYERS CONSTRUCTION CO CARPORT/EXPIRED PERMIT RENEWAL Address: 1603 S ROCKY RIDGE DR C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-5434 Group Name: Site Information Project Name: Plat Key: 000735 Name: EMPIRE HEIGHTS ADD District: Sout Parcel Number: 35241.3522 Block: Lot: SiteAddress: 7123 E 6TH AVE Owner:Name: BRANCH,DOUG Address: 5244 45TH AVE Location::CSV SEATTLE,WA 98136 Zoning: UR-7 Urban Residential-7 Water District: 020 EAST SPOKANE Hold: ❑ Area: .00 Acres Width: 60 Depth: 127 Right Of Way(ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review In formation: mp.e z. „ .... Review Building Plan Review Released By Originally Released: 4/3/2007 By: TMELBOU Landuse/Zoning/HE Conditions Released By — Building Permit Contractor: MYERS CONSTRUCTION Firm: WAYNE MYERS CONSTRUCTION Address: 1603 S ROCKY RIDGE DR Phone: (509)535-5434 SPOKANE,WA 99212 Operator: JD Printed By: .JD Print Date: 4/3/2007 Permit Center Spa - cm oe 11707 E Sprague Ave, Suite 106 PERMIT NUMBER: cme Spokane Valley,WA 99206 CFI C) PERMIT FEE: jValley. (509)688-0036 FAX: (509)688-0037 www.spokauevallev.org Community Development Residential Cot stru n 0 7 n New Construction n Accessory Bldg Permit Application ❑ Addition/Remodel [1] Deck �� ❑ Other: 74 SITE ADDRESS: 7/2 3 E 6 4✓C ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: nn Contractor: ,, Name: Uotllots IJYa�rt. Name: ,4ly ers densem{. (a. Address: Address: City: Se m f/+la State: 31 City: S n� vii ,vcalc7 State:wet. Phone:;206 _137 / ,iteZ Fax: Phone: 3 Sy3 Fax: Contractor Lic No: Exp Date: // 8 Al/l c—Rscc /£/41_2 �a Contact Person City,Business Lic.No:4.076,6 73 Name: A`/A t /97�I-er...r Phone: ? 9 - 99 g V / Q/z S�3 5 s y v Describe the scope of work in detail: Cost of P i jest: $ 000 - 11ovo 41da oic,/i f7l7h a. .5-Shpt r 73 a/1 el !D1 /n e'x/s f-ir,7 S - er r 77st. a 6Ao CBI/,�1 it Proposed Use: oiZ **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE • FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DECK/COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT SOURCE: SEWER OR SEPTIC? The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be pr essed. SIGNATURE: DATE: -3 j 30 /07 Method of Payment: ❑ Cash WI Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 Scm' po ne Valley 11707 E Sprague Ave Suite 106 0 Spokane Valley WA 99206 509.921.1000 0 Fax: 509.921.1003 ♦ cityhall@spokanevaltey.org Residential Plan Submittal Minimums O Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. ❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor. Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and d details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22" X 30" attic access location ❑ 18" X 24" crawl space access: • ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. . ❑ All header locations: type, size, and connections • • ❑ Foundation plan O Insulation information Marr / 07 05: 08p D B 2 p. t PFAFF ENGINEERS PFAFF ENGINEERS,INC. 12128 N.DIVISION STREET,#200 9 March 2007 SPOKANE,WA 99218 TEL 509 467-8554 FAX 509 465-4711 Douglas Branch 5244 45th Ave. SW Seattle, WA 98136 dougbranch@likeonatree.net Re: Structural Inspection: 7123 E. 6th, Spokane,WA Dear Mr.Branch: At your request, a limited inspection of the above property was performed on o March 2007. The purpose was to evaluate the structural condition of the carport and bedroom addition. Kenneth Pfaff, P.E.,performed this inspection. This inspection did not include an overall evaluation of the home. We did not enter all portions of the home. This inspection report is limited to observations made from visual evidence. No destructive testing was performed. The report is not to be considered a guarantee of condition and no warranty is implied. This inspection and report have been conducted in compliance with the standards of practice of the National Academy of Building Inspection Engineers. As Professional Engineer, it is our responsibility to evaluate available evidence relevant to the purpose of this inspection. We are not responsible for conditions that could not be seen or were not within the scope of our service. Our evaluation of this structure is based on many indirect observations. As with any limited inspection,it is possible that there are some deficiencies that cannot be known. DESCRIPTION This home is a one story"single-wide"manufactured home with an attached carport and bedroom addition. The home has metal and T1-11 type.siding and an asphalt composition roof surfacing. There is a crawl space under the building which was partially accessible for inspection. • The basic construction of the carport consists of precast concrete pedestal footings resting on the ground,supporting 4 x 4 wood columns near the outer edge of the carport. The columns support a 4 x 8 inch beam which supports the outer roof rafters. The inner rafters are supported on a ledger board attached to the manufactured home. The bedroom addition is supported at the outer edge on a -:. poured concrete footing with a short stem wall supporting the outer end of the floor joists. The inner end of the floor joists are supported by a ledger plate attached to the home. LICENSED PROFESSIONAL ENGINEERS COMMERCIAL/RESIDENTIAL , I BUILDING EVALUATIONS INSPECTIONS ANALYSIS Visit our website: RESERVE STUDIES www.criterium-ptaft.com _-- �J ® Matte at 07 05: 09p D B 2 P• 2 As we understand, the carport and addition were not permitted when constructed. There is some concern about the adequacy of their construction. OBSERVATIONS The 2 x 6 roof rafters are set 24 inches on center and span approximately 12 feet-4 inches which is excessive. The inner end of the roof rafters are supported on the home which is generally not recommended. Further,the rafters do not appear to be secured to the outer beam or wall plate. The outer wall of the addition provides support for the outer end of the rafters. The wall construction was not visible,but is assumed to be a framed 2 x 4 wall. The carport's construction is light,but typical of many we see. The 4 x 8 beam supporting the outer end of the rafters has a maximum unsupported span of 12 feet-9 inches between the 4 x 4 support columns. The addition floor joists are 2 x 8's 16 inches on center. The unsupported span is approximately 10 feet-7 inches to the support at the manufactured home wall. Support of the addition's outer wall and the floor joists is by a full length stem wall and concrete footing in the crawl space underneath. The stem wall is of 2 x 4 construction, 16 inches on center. The footing is 12 inches wide and 8 inches thick and constructed on grade. The stern wall and footing are inset about 1 foot inside the wall which means the wall is supported on the cantilevered floor joists. Inside the crawl space,we found several items needing correction. The insulation on the underside of the floor is installed upside-down with the vapor barrier on the bottom. This can trap moisure against the flooring and lead to rot or mold. Also,no vapor barrier is provided over the bare soil in the crawl space to help prevent water vapor from entering the living space. No ventilation is provided for the crawl space which can lead to moisture problems. The T1-11 skirting is not well supported and is not an appropriate material for a skirting wall. The roofing is standard quality 3 tab asphalt composition shingle which is not recommended for a low slope roof. Another non-stuctural item we observed,but of concern was the pceecnce of m.id on the walls in the addition. It is likely that there is mold in the wall cavities as well. CONCLUSION and RECOMMENDATIONS In order to achieve proper roof rafter design,we believe the easiest solution is to install another 2 x 6 rafter between each of the existing rafters,essentially making them 12 inches on center. This would require removal of the addition ceiling to accomplish this. The inner side of the carport and addition roof should not be supported by the home. Manufactured homes are not designed to support any additional loads. At the carport,we recommend that a f properly sized beam be installed under the rafters to take their loading and supported by treated i , Marr. 21 07 05: 09p D B 2 p. 3 wood columns on precast concrete footings,similar to the outer end. In order to help prevent roof leakage,we would not detach the carport from the home. The rafters must be properly secured to the beams and wall plate with properly sized rafter clips. Additional support of the 4 x 8 rafter support beam is needed in order to reduce its unsupported spans. Either re-spacing the 4 x 4 columns and pedestal footings to achieve a maximum eight foot span,or installing additional 4 x 4 columns on pedestal footings between the existing columns is recommended. The columns should be treated wood and should be secured top and bottom. The floor joist span is within acceptable standards. The footing and stem wall appear to adequately support the outer portion of the addition. The footing is inset about 2 feet from the edge of the home,so is considered to be frost protected. As with the rafters,the floor joists should not be supported by the home. We recommend installing a proper girder in the crawl space under the floor joists adjacent to the manufactured home to support the joist loads. The girder should be supported at a proper spacing by either concrete block or treated wood piers secured to and resting on properly sized pre-cast concrete footings at grade. The footings should be inset at least 2 feet away from the perimeter of the home so that they will be protected from frost. In the crawl space we recommend installing a plastic vapor barrier over the bare soil, installing properly supported skirting material such as treated plywood,vinyl,or cement fiber boards, providing adequate ventilation(1 sq. ft.for each 150 sq ft of crawl space area),and either removing the vapor barrier from the insulation or replacing the insulation with unfaced insulation. The roofing should be replaced with a system appropriate for a low slope roof such as properly installed rolled granular asphaltic sheet over good quality underlayment. With attention to these items,we believe the carport and addition's structure will serve you well for quite some time. A hard copy of this report will follow our email. If you have any questions about this report,we encourage you to call us. Thank you for the opportunity to be of assistance. Sincerely, • Ken Pfaff,. Criterium-Pfaff Engineers j /•. 'Al • / j?• ,i l rr KJ / I.) C/u -- sworT zm6/ ad her, 1 Joist hey m4'fl uChiveef tic .2) s // aei01 nodi a ( v2x 4 i t�� Crew� az7 0./, Cir C 3) LvtSu cc C c'i l 1 "f / 5.-Xe frac (� 7l Ad d ad di 11alai l c;/ A9 eaAr SeyiWi a'rl Mahu;`zt-cTre GZc^s'iC. 64C s) Add 4, c I X (o rac ',- • cdr/oori l z`' DCG 6) (r/0,s a" / ract/7 7 di? /7e aAd net fi y /9:;_s/- 7) ,5 if as / if rcIk4' roo�r%� ever add, o.1 a#1/4.0f cc,rr 4 IV -70,3 6 v,, T , , 7q, _ . (-----\ .... _ _ _ _ _ _ -23i ay, 16. cidr OY\ I 1 I L-- 7' j y f 4 � E 1 ° ; CitQPcjr i P 1 __I 1 1 1 Y ` c r lZ 4 t IC PLAN NG D-,•T. APPROVED I , P 3.3' DATE: k/4fDi E r f i i I 5-s, >I 64- Ave. . . . 7/ 3 & ‘,„ ri., 4/co CAR lacsiCr— .., t..._ . _ . 'm I:J . 4.4%-tc),\!(...! -i- „. ., . ,.. .. .,..m..... ..„. ..... .,,,,,, •„, .. ,1: fl''',' P I ;.M`i V .L.-----, --- /7 7 for f 0 0 4e te A PCS+ h 6e6A, /Ix 27 e 8 0 ,, eilLci.(_, . 34 1 e e IV.- '110 ) .1 i t _ I ... .. •-1 li 4 I • '''' i i-; 5r --..- — s 11 X V --a-- -rt a N S To 4UkiCya AJ ct-- PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOR CODE ••MP NCE SPOKANE VALLEY B ILD G DI SION 3