2010, 01-11 Permit App: 09004080 GarageProject Number: 09004080 Inv: I
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/11/2010 Page 1 of 2
Project Information:
Permit Use: REBUILD 36 X 26 GARAGE w/13126 COV. PATIO Contact: CHAMBERLAIN, ROBERT & TAMARA
Address: 13412 E 5TH AVE
C - S - Z: SPOKANE VALLEY, WA 99216
Setbacks: Front Left: Right: Rear: Phone: (509) 892-0428
Group Name:
Site Information: Project Name:
Plat Key: CONV Name: CONVERTED CNTY DATA District: Sout
Parcel Number: 45221.0502 Block:
SiteAddress: 13412 E 5TH AVE
Location:: CSV
Lot:
Owner: Name: CHAMBERLAIN, ROBERT & TAM
Address: 13412 E 5TH AVE
SPOKANE VALLEY, WA 99216
Zoning: R-3 SF Res District
Water District: 011 MODERN Hold: ❑
Area: 12,799 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 1 Nbr of Dwellings: 1
Review Information•
Review
Building Plan Review
Released By:
Originally Released: 1/11/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Legal non -conforming use - setbacks
Originally Released: 12/23/2009 By: mbasinger
Permits:
Operator: jmm Printed By: jmm Print Date: 1/11/2010
Project Number: 09004080 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 1/11/2010
Contractor: OWNER
Description Grp flps
COV DECK R-3 VB
GARAGE U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBCC SURCHARGE
Building Permit
Page 2 of 2
Firm: OWNER
Phone: (000)
This Application:
Notes Sq Ft Valuation
468 $7,020.00
GARAGE 936 $17,784.00
000-0000
Total Project:
Sq Ft Valuation
468 $7,020.00
936 $17,784.00
Totals: 1,404 $24,804.00 1,404 $24,804.00
Units Unit Desc
1 SELECT
1 SELECT
1 SELECT
Permit Total Fees:
Fee Amount
$391.25
$97.81
$4.50
$493.56
Notes:
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $493.56 $493.56 $73.31 $420.25
$493.56 $493.56 $73.31 $420.25
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: jmm Printed By: jmm
Print Date: 1/11/2010
Spokane
. Va11ey
Community Developmenit
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 9920_6 ___ _
(503 .:-003.6..FAX 559Q)688 -003P
www. hlyor
CSV PF RMlT CENTER
PERMIT NUMBERa
PERMIT FEE:
Residential Construct' New Construction
Permit ApplicaQ>pt # Addition/Remodel
game Other:
SITE ADDRESS: 1 3 LI f t 5 CnJ iA 4 '5/60 (4i i YYPriiid '1 WA
Accessory Bldg
Deck
952/6
ASSESSORS PARCEL NO: U/ SZZ I. O SDZ LEGAL DESCRIPTION:
Building Owner:
Name: SZo$6(4 4 Tr3mr ela-Ay,1, 136k 0) IJ
Address: i3gIZ 6 SrH ItiC
City: `IPO ✓ Ai\16 V AtA/el State: W Zip: g 52) (o
Phone: mel _ 99Z _ 047.43Fax:
Contact Person
Name: Rb° c -i C1-1-A-ruI i1.'
Phone: 'am -0,4243
Describe the scope of work in detail:
Contractor:
DIMENSIONS: rs $e-'3 N
3L,xlb
# OF STORIES: A
Name:
MAIN FLOOR TO SQ.
FTG: iki I N
2NU FLOOR
10
Address:
UNFIN BASEMENT SQ. FTG:
X
IMPERVIOUS SURFACE
AREA: /jiA
City:
State:
Zip:
Phone:
Fax:
CONSTRUCTION TYPE:
Contractor Lic No:
Exp Date:
City Business Lic. No:
Cost of Project: $
Proposed Use: Win werz i►(4 ? I (19 G6
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS: rs $e-'3 N
3L,xlb
# OF STORIES: A
TOTAL HABIT#BLE SPACE:
q
MAIN FLOOR TO SQ.
FTG: iki I N
2NU FLOOR
10
SQ. FTG:
j k
UNFIN BASEMENT SQ. FTG:
X
IMPERVIOUS SURFACE
AREA: /jiA
FINISHED BASEMENT
SQ. FTG: 111\
GARAGE SQ. FT
°t t
DEC,. OV. PATI• SQ. FTG:
zi-W _ ---
30% SLOPES ON ii
PROPERTY:
# OF BEDROOMS: 1
1' I k
CONSTRUCTION TYPE:
HEA ' - : E:
To U veTeii..m),JG)
SEWER OR SEPTIC?
406,2
The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: DATE: / z - 2 3 - a
Method of Payment:
❑ Cash
Bankcard #:
Authorized Signature:
REVISED 2/15/07
❑ Check
❑ Mastercard ❑ VISA
Expires: VIN#:
RESIDENTIAL CHECK LIST DIRECTIONS:
Place a check mark in box next to each document required for complete submittal.
o SITE PLAN
o Property lines and dimensions
o Direction arrow pointing North and orientation to streets
o Proposed/existing buildings (footprint and dimensions)
o Utilities, septic tank/drain field locations and distances
o Setbacks to property lines
o Distance between buildings
o Right of way/easement location & sizes
o Driveway approach size and location
BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned)
O Elevations (Front/Rear/Sides) with roof peak and wall height including basement:
O Foundation Plan (crawlspace, basement or slab on grade):
o Footing sizes and locations
o Perimeter concrete foundation wall sizes
o Craw!space ventilation
o Supporting wood cripple walls or beams
o Thickened concrete pads supporting
beams or girder trusses
O Floor Plan of each level (finished or unfinished) with dimensions:
o Floor Joist directiori, size and spacing
o Header, beam or concrete lintel sizes
o Brace wall panel locations
o Water heater and furnace locations
o Exhaust fan locations
o Deck or concrete patio sizes and locations
O Roof Plan:
o Engineered truss direction and spacing
o Rafter and over frame direction, size and spacing
O Wall Section Detail including:
Roof
o Slope/ roofing material/ underlayment/ ice dam protection
o Sheathing size and type
Ceiling
o Joist size and spacing
Wall
o Height/ top plate/ stud size and spacing/ sole plate
o Exterior sheathing size and type
Floor
o Joist size and spacing
Foundation Wall
o Concrete or Masonry unit width
o Earth to wood separation distance
Footing
o Size
Radon
o Passive system with 6mil vapor barrier
Miscellaneous Construction Details
O Deck:
o Floor plan/ side view/ dimensions
o Floor Joist/ decking direction, size and spacing
O Stairway tread rise & run and nosing
o Window and door location and sizes
o Window well locations if applicable
o Room usage labels
o Smoke detector locations
o Attic and crawl space access locations
o Fire Wall construction
o Ridge, eave and valley lines
o Beam and girder size and location
o Truss or rafter size, spacing & connection
o Attic insulation/ air space baffle/ ventilation
o Size of ceiling gypsum wall board
o Siding/ exterior house wrap/ anchor bolts
o Insulation, vapor barrier, gypsum wall board
o Sheathing or concrete floor size/ insulation
o Footing bottom to finished ground level depth
o Horizontal & vertical reinforcement if any
o Reinforcement if any
o Active system with 6 mil vapor barrier
o Footings/ post/ and beam size and locations
o Handrail / Guard height & spacing
Spokane
jUalley,
For City Use
PLUS Project Number
Project Address 5
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688.0036 • Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By. following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
RECEIVED 01/11/2010 08:34 5096880037 SV PERMIT CENTERFR
.Jath 11 10 09:38a port of Hope 00000
PORT OF HOPE
218 N. 23id Street * Coeur d'Alene, ID 83814*Phone (208) 6643300 * Fax (208) 667-3154*(800) 245-6132
FACSIMILE COVER SHEET
Date: ®r.. IN l0 Time: Cover, plus 3 pages
To: .To &tB'tuP 6 Fax #: - 688-003
At: Cm of SPot/IA mei pawl- c.& rER
From: $06 C ctrA lsiJ
Comments:
p.1
at Port of Hope
D Peu rr MAP "NRA
The Information contained in this facsimile Is oanfldentlal and Intended only for the use of the individual or entity named above.
If the reader of this message Is not the intended redpient, you are hereby notified that any disseminatlon, distribution, or
copying of thls communication Is strictly prohibited. If you have received this communication In error, please notify us
immediately by telephone, collect if necessary, and return the original message to us at the above address.
PLEASE NOTIFY RECIPIENT IMMEDIATELY!
THANK YOU!
111
1/761'
A
51fl uf PDA ti• 1-PrrActikt‘ e)100vt(Z4-A I I _
1 1340, 51" PA I, i0oAallitkii 1 _I
`16 "(70M oo,)-
6 j to
PLANNINGDEPT. APPROVED__
BY. filvAAAA
3'
D
vi-Rao
(6p6T)
rALOCKIDM> (W&>°f)
i
\-7-11,1&
1
1.4
i
-11
60
2,
(-flmittis
R6tb
t
9
I
ellTs4t4
twat
64 (if
r
hob•ms
1
1
)014—
t 7 —,
PLANNINGDEPT. APPROVED__
BY. filvAAAA
3'
D
vi-Rao
(6p6T)
rALOCKIDM> (W&>°f)