2012, 05-09 Permit: SW-12001298 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERM.$T
Application Number: SW -12001298
Permit Issued Date:
05/09/2012
Expiration Date:
Project Description: SEWER CONNECTION
Project Name: MANOS VALLEY ESTATES
Permit Type: SEWER
Primary Contact: BOB LONG EXCAVATING
Applicant: BOB LONG EXCAVATING
Address: PO BOX 305
VALLEYFORD, WA 99036
Phone: 509-924-4782
Email:
SITE INFORMATION:
Site Address: 14318 E 5TH LN Owner: STRAHL CONSTRUCTION INC
Parcel Number: 45232.1708 Address: 3611 N CALISPEL ST
SPOKANE, WA 99205
Subdivision: Manos Valley Estates Phone: 509-328-7919
Assessor's Description: MANOS VALLEY ESTATES PUD LT 8 BLK 1 Email:
(AFN# 5613158)
Inspection Area:
Water District: Vera Fire District: Fire District 1
Irrigation District #15
Zoning: Land Area: 0.1184 acres / 5158 sqft
CONTRACTOR INFORMATION:
General Contractor
LONG'RA246R0
LONG, ROBERT A
PO BOX 305
VALLEYFORD, WA 99036
509-924-4782
DETAILS:
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL:
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS:
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
Date Printed: 05/09/2012 11:09:32
Printed by: 118 APPPOOL\ASP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMJT
Permit Issued Date:
Application Number: SW -12001298 05/09/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 05/09/2012 11:09:32
Printed by: 118 APPPOOL\ASP.NET v4.0