2013, 01-04 Permit App: BLD-2013-1027 ResidenceSpokane
F--` Valley
•
A
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenteftalsookanevdiiev.orq
(Staff Use Only)
PERMIT NUMBER:
PERMIT FEE:
nl ip ,u r i pr,/
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
[X NEW CONSTRUCTION ❑ ADDITION/REMODEL
❑ DECK ❑ OTHER
SITE ADDRESS: I'1322- E S L►��
❑ ACCESSORY BUILDING
ASSESSORS PARCEL NO.: 45232. 11.09 LEGAL DESCRIPTION: LOT C( -‘3LDC-t - I
BUILDING OWNER NAME:
NAME: c-st-kf"t Co(\L ,T U Cfl O , 1 M i.
ADDRESS: 3(.011 r• C A t-1 S 1? E L S"\--
CITY: S?uK U E STATE: AJA ZZIP: �I 1QrL�Z�
PHONE: 1 S I 19 t FAX: 32P` ' I CELL: 1 S I ( 1 O J
CONTACT NAME: �ASp,j `S -T PrWL
PHONE: 951---19D72)
FAX: 32-'6-1-9 19
CELL: "J�J I - 19
CONTRACTOR NAME: b,A)
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE NO.: 57 I-j-CZ47) (c t 6 EXPIRES: 5131 I Y CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
l oAISTgive_T1 f= bt, 1\1C ( F ��/ L C H
****YOU MUST COMPLETE THE FOLLOWING****
ARK N/A IF NOT APPLICABLE
Height to Peak: 1
Dimensions:
�� X � 1
No. of Stories:
Total Habitable
Space: ,, -1 2_
Main Floor SQ FT:
1 Sf-I 2
Upper Floor SQ FT:1
NIA
Unfinished Basement SQ
FT: N, \
Finished Base ent SQ
FT: N �'�
Garage SQ FT:
le \ L
Deck/Covered Patio SQ
FT: i' (cc )
Impervious Surface
Area: /\I I A
30% Slopes on
Property: Al /A
No. of Bedrooms: 3
Construction Type: L_, . -.
Heat Source: 6AS ctL
Sewer or Septic: Scewf-�'
TOTAL COST OF PROJECT: $
(l,s, Dba
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property owner. 3) The signatory is the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
information may be required to be submitted and subsequently approved before this application can be processed.
Effective October 28, 2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
•fr.
r •
Signature I4MMA ! � 1i Q I g.,2.Pa4 tai Date: Ce I Ll / Zo (
Method of payment: 0 Cash ❑ Check 0 Visa 0 Mastercard
Bankcard #: EXP: VIN#:
Authorized Signature:
Effective October 28, 2007 Page 2 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Application Number: SW -13000897
• •
SPOKANE COUNTY UTILITIES
PERMIT
Permit Issued Date: 06/04/2013
Expiration Date: 06/04/2014
Project Description:
Project Name:
Primary Contact:
Phone:
SEWER CONNECTION
MANOS VALLEY ESTATES
STRAHL CONSTRUCTION INC
509-328-7919
Applicant: STRAHL CONSTRUCTION INC
Address:
Phone:
Email:
3611 N CALISPEL ST
SPOKANE, WA 99205
509-328-7919
SITE INFORMATION.
Site Address:
Parcel Number:
Assessor's Description
Inspection Area:
Zoning:
14322 E 5TH LN
45232.1709
MANOS VALLEY ESTATES PUD LT 9 BLK 1
(AFN# 5613158)
:(509)-477-3675
Owner:
Address:
Phone:
Email:
Water District: Vera Irrigation District #15
STRAHL CONSTRUCTION INC
3611 N CALISPEL ST
SPOKANE, WA 99205
509-328-7919
Fire District: Spokane Valley Fire
Land Area: 4935 Square Feet
CONTRACTOR INFORMATION•
LONGRA•246R0, Exp. 03/31/2014
BOB LONG
PO BOX 305 VALLEYFORD, WA 99036
509-951-1903
DETAILS:
1
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL..
Processing - Utilities
Utilities Permit
Total Fee:
$26.32
$125.00
$151.32
1 $125.00 $125.00
$125.00
CONDITIONS.
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FORA 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
Date Printed: 06/04/2013 11:43:36 Project Coordinator Kathy Cummings
SPOKANE COUNTY UTILITIES •
PERMIT
Application Number: SW -13000897 Permit Issued Date: 06/04/2013
Expiration Date: 06/04/2014
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 06/04/2013 11:43:36 Project Coordinator: Kathy Cummings
•
T
•
n� p
41-'
PLANNING DEPT. APPROVED
1-4
6/4/(
14322 S L,\1
-PA CEL*F y5zg2, t X09
Lor q 3L�c�c
MAK �200� I 12
Lo-
NV
51'
DR02w Pn(
PP -'P -e- Llf,v E
cJ�N LAnLE