2014, 02-27 Permit: SW-14000093 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -14000093
Permit Issued Date:
02/27/2014
Expiration Date: 02/27/2015
Project Description: SEWER CONNECTION
Project Name: MANOS VALLEY ESTATES
Permit Type: SEWER
Primary Contact: STRAHL CONSTRUCTION INC
Applicant: STRAHL CONSTRUCTION INC
Address: 3611 N CALISPEL ST
SPOKANE, WA 99205
Phone: 509-328-7919
Email:
SITE INFORMATION•
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
14326 E 5TH LN
45232.1710
Manos Valley Estates
MANOS VALLEY ESTATES PUD LT 10 BLK 1
(AFN# 5613158)
Owner:
Address:
Phone:
Email:
STRAHL CONSTRUCTION INC
3611 N CALISPEL ST
SPOKANE, WA 99205
509-328-7919
Water District: Vera Fire District: Spokane Valley Fire
Irrigation District #15
Land Area: 4968 Square Feet
CONTRACTOR INFORMATION:
General Contractor
LONGRA'246R0
BOB LONG
PO BOX 305
VALLEYFORD, WA 99036
509-951-1903
DETAILS.
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION 1 $125.00 $125.00
FEE DETAIL'
Processing - Utilities
Utilities Permit
Total Fee:
$125.00
$26.64
$125.00
$151.64
CONDITIONS:
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 02/27/2014 10:25:58
Printed by: IIS APPPOOL\SmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -14000093 02/27/2014
Expiration Date: 02/27/2015
SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES
DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT
ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 02/27/2014 10:25:56 Printed by: IIS APPPOOL1SmartGovProdApp