2010, 09-17 Permit App: 10002925 Residence, Project Number: 10002925 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/17/2010 Page 1 of 3
Project Information:
Permit Use: SFR W/ATT GAR Contact: STRAHL CONSTRUCTION INC
Address: 3611 N CALISPEL ST
C - S - Z: SPOKANE, WA 99205
Setbacks: Front Left: Right: Rear: Phone: (000) 000-0000
Group Name:
Site Information: Project Name:
Plat Key: Name: Range
District: East
Parcel Number: 45232.1712
SiteAddress: 14410 E 5TH LN
Location:: CSV
Block: Lot:
Owner: Name: STRAHL CONSTRUCTION INC
Address: 3611 N CALISPEL ST
SPOKANE, WA 99205
Zoning: R-3 SF Res District
Water District: 010 VERA Hold: ❑
Area: 4,968 Sq Ft Width: 0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information•
Review
Building Plan Review
Released By:
Originally Released: 9/17/2010 By: tmelbourn
Landuse/Zoning/HE Conditions
Released By:
Sewer Review
Originally Released: 9/15/2010 By: kkendall
Released By:
Originally Released: 9/15/2010 By: jdavis
Permits •
Operator: JD Printed By: jam Print Date: 9/17/2010
Project Number: 10002925
Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/17/2010 Page 2 of 3
Building Permit
Contractor: STRAHL CONSTRUCTION, INC Firm: STRAHL CONSTRUCTION
Address: 3611 N CALISPEL ST Phone: (509) 328-7919
SPOKANE, WA 99205
Description Gro Type
1&2 FAMILY R-3 VB
BASEMENT U R-3 VB
COV DECK R-3 VB
GAR WOOD U-1 VB
Item Description
RESIDENTIAL PERMIT FEE
WSBCC SURCHARGE
SF PLNS RVW < 7999 SQ FT
Notes
Contractor: STRAHL CONSTRUCTION,
Address: 3611 N CALISPEL ST
SPOKANE, WA 99205
Item Description
GAS WATER HEATER
GAS APPLIANCE<=100,000BTU
GAS PIPING
HEAT PUMP OR AJC 0-3 TONS
VENTILATING FANS 1 DUCT
GAS LOG OR GAS INSERT
HOOD -TYPE II
This Application: Total Project:
Se Ft Valuation Su Ft Valuation
1,468 $145,258.60 1,468 $145,258.60
1,455 $21,825 00 1,455 $21,825.00
78 $1,170.00 78 $1,170.00
478 $9,082.00 478 $9,082.00
Totals: 3,479 $177,335.60 3,479 $177,335.60
Units Unit Desc Fee Amount
1 SELECT $1,430.55
1 SELECT $4.50
1 SELECT $572.22
Permit Total Fees:
Mechanical Permit
$2,007.27
INC Firm: STRAHL CONSTRUCTION
Phone: (509) 328-7919
Units Unit Desc
1 NUMBER OF
1 NUMBER OF
3 # OF UNITS
1 NUMBER OF
3 NUMBER OF
1 NUMBER OF
1 NUMBER OF
Operator: JD Printed By: jmm
Permit Total Fees:
Print Date:
Fee Amount
$11.00
$13.00
$3.00
$13.00
$33.00
$11.00
$11.00
$95.00
9/17/2010
Project Number: 10002925 Inv: 1
Application
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Date: 9/17/2010
Contractor: STRAHL CONSTRUCTION, INC
Address: 3611 N CALISPEL ST
SPOKANE, WA 99205
Item Description
TOILETSBIDETS
SINKS
SHOWERS
TUBS
DISH WASHERS
GARBAGE DISPOSAL
CLOTHES WASHER
MISCELLANEOUS FIXTURES
Plumbing Permit
Units
2
4
1
1
1
1
1
1
Page 3 of 3
Firm: STRAHL CONSTRUCTION
Phone: (509) 328-7919
Unit Desc
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
NUMBER OF
Permit Total Fees:
Fee Amount
$12.00
$24.00
$6.00
$6.00
$6.00
$6.00
$6.00
$6.00
$72.00
Notes •
Payment Summary:
Permit Type
Building Permit
Mechanical Permit
Plumbing Permit
Fee Amount Invoice Amount
$2,007.27
$95.00
$72.00
$2,007.27
$95.00
$72.00
Amount Paid
$572.22
$0.00
$0.00
Amount Owing
$1,435.05
$95.00
$72.00
$2,174.27 $2,174.27 $572.22 $1,602.05
Disclaimer:
Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: jmm
Print Date: 9/17/2010
Community Development Department
Permit Center
11703 East Sprague Avenue, Suite B-3
Spokane Valley, WA 99206
Tel: (509) 688-0036
Fax: (509) 688-0037
permitcenterPspokanevallev.Orq
(Staff Use Only)
/v.- 2 92,S.
PERMIT NUMBER:
PERMIT FEE:
RESIDENTIAL CONSTRUCTION PERMIT APPLICATION
NEW CONSTRUCTION ❑ ADDITION/REMODEL
❑ DECK ❑ OTHER
SITE ADDRESS: HA -A D Li.1
❑ ACCESSORY BUILDING
ASSESSORS PARCEL NO.: 1.152 2. 1112. LEGAL DESCRIPTION:
BUILDING OWNER NAME:
Lo v CL K l J C
NAME: STKp 141 U C.T't Q Ir i C
ADDRESS: , J 11 'V . CA'LIPO _ �T
CITY: Pi0 4Ar RF
PHONE: "151-19 b.7--)
CONTACT NAME: c:VAI"))Q,
PHONE:
STATE: JA,
FAX: .2525\
ZIP: 1r 1 ZOS
-- I QJ
CELL: Ci 31O 3
FAX: ' I I CELL: 6351---)9 (� 3
CONTRACTOR NAME:
MAILING ADDRESS:
CITY:
STATE: ZIP:
PHONE:
FAX: CELL:
CONTRACTOR LICENSE NO.: STRA41,0lgl,R Li EXPIRES: 111,2 CITY BUSINESS LICENSE NO.:
DESCRIBE THE SCOPE OF WORK IN DETAIL AND INDICATE USE & PROPOSED USE:
Le ki S> K 11 riv1 t AND,
I -
****YOU MUST COMPLETE THE FOLLOWING****
K NIA IF NOT APPLICABLE
Height to Peak: i
Dimensions:,No.
1 I'-- x `--' '
of Stories:
Total Habitable ,,, y,{�
Space: Z9 ? 3 (�"6`� T
Main Floor/� �FT:
C Lt l7 (
Upper Floor SQ FT: l
�I�
Unfinished Basement SQ,.—
FT: IJ ---t L /7J S
Finished Basement SQ
FT: MIA
Garage SQ FT: sl
-47g 5s 2_
Dec veered Patio SQ
FT. .._.7/
Impervious l'Surface
Area: NIA
30% Slopes on, n
Property: N tc
No. of Bedrooms: 3
Construction Type: 3.:0-11.4A
Got
S q
Heat Source: 6,
werorSeptic:
TOTAL COST OF PROJECT: $ I `r� "yl Oj
DISCLAIMER
The permitted verifies, acknowledges and agrees by their signature that: 1) if this permit is for constn.
be served by potable water. 2) Ownership of this City of Spokane Valley permit inure to the property
owner or has permission to represent the property owner in this transaction. 4) All construction is to
Spokane Valley Development code. Referenced codes are available for review at the City of Spoke
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, col
information may be required to be submitted and subsequently approved before this application can b
410 oft/(
ice .;i 7 r
Effective October 28, 2007 Page 1 of 2
P:\Community Development\02 Administration\03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
ER
Signature‘
kPA ck-Go ftQCRc{ kIAQA
Method of payment: ❑ Cash
Bankcard #:
Authorized Signature:
0 Check ❑ Visa
EXP:
Date: Jep f{i1Vx Ln /5, 2D f
❑ Mastercard
VIN#:
Effective October 28, 2007 Page 2 of 2
P:\Community Devebpment\02 Administration \03 Forms - Official Versions\Permit Center\Residential Construction Permit
App 10.28.07.doc
Waffle
Community Development
Mechanical Permit Application
Permit Center
11703 It Sprague Ave, Suite B-3
Spokand Valley, WA 99206
(509)6811-0036 FAX (509)688-0037
permitcenter(sookanevallev.ory
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial IT Residential
SITE ADDRESS: Id '1 I [) F . 9 L -1V
Building Owner
Name:CflAN1� 1CoalSrW1)(a10A1l /rJC
Address: 3(5(1 N' C,aurPr!1- S -r.
Contactor
Phone"951-19 0 S
Fax: `3291---1919
City: SP° KA -14E state: I,J A
Zip: 992. 5
Name:
Phone:
Fax:
Address:
City
State:
Zip:
License No: .M -F r91o9 Ij
Contact/Project Manager:
City Business Lic:
Name:
Phone: n c I
L )i -4,1\N
..— ' '
*)NITS
Up to & Inducing 100,000 BTU
1
FURNACES & SUSPENDE BEATERS -INSTALLATION OR RELOCATION
FURNACES & SUSPENDED I -EATERS -INSTALLATION OR RELOCATION
Over 100,000 BTU
DUCT WORK SYSTEM
HEAT PUhP/AIR CONDITIONER
0-3 TON
1
AIR CONDITIONER
Over 3-15 TON
AIR CONDITIONER
Over 15-30 TON
AIR CONDITIONER
Over 30-50 TON
AR CONDITIONER
Over 50 TON
GAS WATER HEATER
1
GAS PIPING SYSTEM (each outlet)
- 3
GAS LOG, FIREPLACE, & GAS INSERT
1
APPLIANCE VENTS INSTALLATION, RELOCATION, REPLACEMENT
REPAIRS OR ADDITIONS
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
0 to 3 hp -100,000 BTU or less
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 3-15 hp — 100,001 to 500,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 15— 30 hp - 500,001 to 1,000,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 30 hp — 1,000,001 to 1,750,000 BTU
BOILER, COMPRESSORS, ABSORPTIONS SYSTEM
Over 50 hp—over 1,750,000 BTU
AIR HANDLER (DOES NOT include ducting)
Each unit up to 10,000 dm, including ducts
AR HANDLER (DOES NOT Include ducting)
Each unit over 10,000 dm
EVAPORATIVE COOLERS(dherthan penabies)
VENTILATION AND DOiAUST
Each fan connected to a singe dud
2)
VENTILATION AND EXHAUST
Each ve01 adon system
VENTILATION AND EXHAUST
Each hood nerved by mediadcal ediaust
INCINERATORS
Instaiaton or relocation of residential
INCINERATORS
Instapatlon or relocation of cornmerdai
APPLIANCES
Range, Clothes Washer
UNLISTED APPLIANCES
Under 400,000 BTU
UNLISTED APPLIANCES
Over 400,000 BTU
HOOD
Typel
HOOD
Type II
1
L P STORAGE TANK
WOOD OR PELLET STOVE INSERT
WOOD STOVE SYSTEM — FREE STANDING
MASH 0 CHECK ❑ VISA 0 MC
CARD fY.
EXPIRES:
SIGNATURE
VIN:
P:\Community Development\02 Administration 103 Forms - Official Versions\Permit CenterUMeclauudcal Permit Application 04-03-09 dgdoc
Permit Center
11703 E Sprague Ave, Suite B-3
Spokane Valley, WA 99206
(509)688-0036 FAX: (509)688-0037
permitcenterT sookanevallev.orP
Community Development
Plumbing Permit Application
s1TEAnnness: 114\ 1)F ' L.
PERMIT NUMBER:
PERMIT FEE:
❑ Commercial CX1 Residential
Building Oweer
Name: STRA4'1 ea ,..1c-,—(19.„9 P X 111T1 I / \1. C • Phone: %I —1 Ip DS in: 324) --1 919
1
Address: ?bit Al. e us.oi occ' City: oKA-+,IF. State: vu pc Zip: 019 2.13s
—
Contractor
Name: Phone: Fax:
Address: City State: Zip:
License No: sTAA,44,mci 10 Q City Business Lic:
CoatacUPreject Manager:
Name: zvisDi Phone: 951-190
N OF UNITS
PLUMBING FIXTURE ON A TRAP
TOILETS
�%
2.
URINALS
TUBS
1
SHOWERS (per trap)
I
SINKS
Lav)Besins, Bar, Floor, Kitchen, Laundry, Utility, Janitor, Photo, X-ray, Food,
Prep/Cufoay Meat
- DISHWASHER
1
CLOTHES WASHER
1
GARBAGE DISPOSAL
1
WATER SOFTNER
FLOOR DRAIN
Area, Case Coil Trench, Condensate
ROOF DRAIN/OVERFLOW DRAINS
FOUNTAIN, DRINKING
WATER PFINGIDRAIN-IN WASTE
Installation, Alterations, Repair, Reversals
WATER USING DEVICE
Ice ad/or Coffee maker, hose bib, steamer maw, cebon®lor, swamp cooler
3
PRIVATE SEWAGE DISPOSAL STa 1 tM
WATER HEATER
If Gas, See Mechanical
INDUSTRIAL WASTE PRETREATEMENT
INCEPTORS
Including traps, vents except kitchen type grease intercepters functioning as fixture traps
REPAIR OR ALTERATION
Water piping, drainage or vent piping
ATMOSPHERIC TYPE VACUUM BREAKER
BACK FLOW PROTECTIVE DEVICE
Other than atmospheric type vacuum breakers
MEDICAL GAS
INCEPTORS
DCASH D CHECK D VISA DMC
Card#
SIGNATURE:
EXPIRES:
VIN:
P:\Community Development\02 Administration\03 Forms - Official Versions\Pemdt Center\Plumbing Permit Application 04-03-09 dg,doc
SpoKARE COUNJY
SPOKANE COUNTY
DEPARTMENT OF BUILDING & PLANNING
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
Site Information
Project Information
Site Address: 14410 E 5TH LN
Parcel Number: 45232.1712
Subdivision: CITY OF SPOKANE VALLEY
Block: 1 Lot: 12
Zoning: UNK Unknown
Owner: STRAHL CONSTRUCTION INC
Address: 3611 N CALISPEL ST
SPOKANE, WA 99205
Building Inspector:
Water Dist:
Project Number: 10004927 Inv: 1 Issue Date: 9/15/2010
Permit Use: SEWER CONNECTION
Applicant: STRAHL CONSTRUCTION INC
3611 N CALISPEL ST
SPOKANE, WA 99205 Phone: (509) 328-7919
Contact: STRAHL CONSTRUCTION INC
3611 N CALISPEL ST
SPOKANE, WA 99205 Phone: (509) 328-7919
Setbacks - Front: Left: . Right: Rear:
Group Name:
Project Name:
Permits
Sewer Connection Permit
Contractor: STRAHL CONSTUCTION LLC License #: STRAHCL927QG
PROCESSING FEE 1 $15.00 SI SEWER CONNECTION 1 $125.00
Total Permit Fee: $140.00
**FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO
COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL
INSPECTION FEES APPLY AFTER 30 MINUTES.
**CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE
REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES,
INCLUDING THOSE RELATED TO TRENCH SAFETY.
**INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY
BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE
ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
**SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY
HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO
ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
**THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME.
BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO
OWNERS OF UNDERGROUND FACILITIES.
Payment Summary
Total Fees AmountPaid AmountOwing
$140.00 $140.00 $0.00
Tran Date Receipt # Payment Amt
9/15/2010 4014 $140.00
Processed By: CUMMINGS, KATHY
Printed By: Force, Faith Page 1 of 1
PERMIT
NOTICE
It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and -
requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicants/permittee's
or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code:
1. FOOTING - all structures, including manufactured homes when forms and reinforcement are in place and prior to placement of concrete.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Front, flanking, side and rear yard setbacks are measured from property lines. Curb lines and fence lines are not necessarily indicative
of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved
street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized
representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your
structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, plumbing, mechanical rough -in inspections have been approved, and prior to
concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - all permits - when complete and prior to occupancy and/or use. Please provide 24 hours notice.
NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access,
on-site drainage (-208 swales•), road improvements, paridng, and landscaping are common requirements of a permit/site plan which
must be completed prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - foundation inspections prior to pouring pads, inspection of blocking/tie-downs, when completed per manufacturers
installation instructions. Final Inspection approval prior to occupancy: stairs, handrails, skirting, etc., installations completed WAINS Tag(s) must be
affixed to the home, completed inspection record card and manufacturer's installation instructions must be available on site.
9. SEWERS - prior to cover
10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected
prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
FOR INSPECTIONS:
TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE .
PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS
FROM MORE THAN ONE AGENCY.
• Building, plumbing, mechanical and fire inspections, Department
of Building & Planning 477-3675
• Construction in a flood plain, Division of Engineering & Roads 477-3600
• Electrical wiring, State Department of Labor and Industries 324-2640
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Road cuts for utilities or driveways, Division of Engineering &
Roads - 48-HOUR NOTICE REQUIRED 477-3600 or
State Department of Transportation 456-3000
• Sewer connection, Division of Utilities 477-3604 or City Public
Works Department 625-6300
PERMIT EXPIRATION
Unless otherwise noted, building, plumbing, fire and mechanical perms will be considered null and void by limitation if the work authorized by
the permit is not commenced within 180 days or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and
approved by the Building Department prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the
validity of the permit. Please call if you have any questions.
REFUNDS
All requests for building permit refunds must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the
date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No
refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect to their refund policy on all other permit
types.
MISTAKE?
If you think we've made an error in processing this permit or find erroneous information on the permit, please bring it to our attention immediately by filing
a written request for correction within 10 working days of discovery. All such requests should be directed to the Department of Building and Planning at:
Spokane County Department of Building & Planning
1026 West Broadway Avenue Spokane, WA 99260
Phone: (509) 477-3675 Far: (509) 477-4703 TDD: (509) 477-7133
REVISED 02/10 BLDG PERMIT
Spokane
jUalley
For City Use Only
PLUS Project Number I CZCl.Z-�
Project Address
•
11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206
509.688-0036 • Fax: 509.688.0037 • permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
➢ Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re
submittals, each reviewer will approve their section .of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK - BUILDING FILE
REV 9/07
41-
-2
614
li
C, , 12L\G.E
,l
- 7 7
124 410 E. r:STL.
DAT
E. ej-6-/a
54
N
TRotz_ry LJNt