Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 07-16 Permit App: 08002063 Addition
Project Number: 08002063 Inv: 1 Application Date: 7/16/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 176 SQ FT ADDITION OF PATIO/GREENHOUSE Contact: LE,UT VAN/HUYNH,ANI KIM TO EXISTING RESIDENCE Address: 11403 E 6TH AVE C-S-Z: SPOKANE VALLEY,WA 99206-2803 Setbacks:Front Left: Right: Rear: Phone: (509)926-0629 Group Name: Site Information: Project Name: Plat Key: 004047 Name: SP-0335-84 District: Sout Parcel Number: 45212.0922 Block: Lot: SiteAddress: 11403 E 6TH AVE Owner:Name: LE,UT VAN/HUYNH,ANH KIM Address: 11403 E 6TH AVE Location::CSV SPOKANE VALLEY,WA 99206-280 Zoning: MF-1 MF MDR District Water District: 011 MODERN Hold: ❑ Area: 9,345 Sq Ft Width: 89 Depth: 105 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: _, Review Building Plan Review • B . Originally Released: 7/16/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 6/4/2008 By: LBARLOW Operator: jmm Printed By: jmm Print Date: 7/16/2008 , Project Number: 08002063 Inv: 1 Application Date: 7/16/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation RES ADD R-3 VB 176 SQ FT 0 $850.00 0 $850.00 ADDITION Totals: 0 $850.00 0 $850.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $69.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $27.70 Permit Total Fees: $101.45 Payment Summary• , ... . . ., : . Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $101.45 $101.45 $0.00 $101.45 $101.45 $101.45 $0.00 $101.45 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: jmm Printed By: jmm Print Date: 7/16/2008 Permit Center2 cm of 11703 E Sprague Ave,Suite'B-3 PERMIT NUMBER: Spokane Spokane Valley,WA 99206 PERMIT FEE: ,,, Valley- (509)688-0036 FAX:(509)688-0037 w ww.spokanev al l ev.org Community Development Residential Construction New Construction n Accessory Bldg Permit Application ❑ Addition/Remodel ❑ Deck ry I Other: 74'e-? z,u -/- 4:--c-e(2/2, rfozis L SITE ADDRESS: / ( y ©2 _ �1 /�7/Zv . Sto/c '>,'-q 9 66 ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: ` Contractor: Name: t(/ 1 f/-71/ L-& Name: Address: // p 3 . E .%f# Address: City: (----j,-o/ fi State: 1;i/,4 Zip:l/�22 City: State: Zip: Phone i7)�)1 2_6_ 116"21Fax: / Phone: Fax: UZ - ( 1 \ si — 34 '4 Contractor Lic No: Exp Date: Contact Person ) City Business Lic.No: Name: Phone: Describe the scope of work in detail: Cost of Project: $ 6. Proposed Use: ,1 -tiy-U 4.. err- i CU -- **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: ? (o't DIMENSIONS: }�'x 2 : #OF STORIES: /V(.9iff.- TOTAL HABITABLE SPACE: A / MAIN rOOR TO SQ 2"D FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE ..,6/i; AREA: ,'/! FINISHED BASEMENT GARAGE SQ. F G: DECK/p6V. PATI Q. FTG: 30% SLOPES ON �; SQ. FTG: /t//H' Ai/A- PROPERTY: #OF BEDROOMS: CONSTRUCTION,TYPE: HEAT SOURCE: /V / SEWER OR SEPTIC? /V/A- 1/✓a o r c; /.-A- The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Z-K SIGNATURE: ,' 4,71 "-Pt- DATE: (!• T ---‘77 r 4 Method of Payment: �,. V'�iLLEY 0 Cash 0 Check ❑ Mastercard ❑ VISA I-Iv � Bankcard#: Expires: VIN#: JUN 0 2008 Authorized Signature: i i REVISED 2/15/07 r c 4 0111.11#\1 S JOl� alle 11703 E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 ♦509.688.0036 ♦ Fax: 509.688.0037• Valley ❑X Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. © Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. © Floor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. © Egress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. ❑X Floor framing details: Joist type, size, spacing and installation details. ❑X Roof framing plan and details MX Furnace and hot water heater location MX All header locations: type, size and connections ❑X Foundation plan MX Insulation information ❑X Decks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage /� / / w..- --�. / iritaillwr w W T. A . y AP�. r tas� p I • ' O rfi`.wnklt'' :'A1-;�%sz11E•Fat";n@a. 1 f! 0 0 0 s 4 4 6TH AVE. STREET is -0ii/t } I I t I E 1 E � I 1 I c73 1 I iI i I 1 1 1 1 1 I ii I 1 f I1 EXISTING I EXISTING BUILDING GARAGE RESIDENCE m I 11403E.6TH AVE. SPOKANE VALLEY,WA o I! / 06 — I ADDITION-PATIO 63 I I I it I Sr I I I iI - .m11•11.• •OM•••.•• • M•11..... i • gt• IMM.• •11111. a M=MMO #0••• T 87' 1 PLANNING DEPT. APPROVED 0 SITE PLAN BY: L, 1 DATE: Jj H ` 1 U� v�.e. • PALRUF PVC Corrugated Profiles -• Theoretical Madmum Support5pacingI.gn Standard Available Profiles with Configuration and Support Distances'for Selected Thickness'and 1Mdths6 d d welotpel 01151 n m Se Slope wall Thickness Pitch Depth No° wiidth'd NetCoverage width` Wave % unitareae Desd�l Slope >20%Units Profile - Overlap Overlap kg/m' kg/m° mm mm mm mm mm mm Waves mm mm 550 500 550 as Name • 1 4.6 _ 5 300 413 450 �� 1040 0.8 32 8 32 1040 992 .56 900. 350 550 Mini 32 00 w 950 p0 1210 1 6.7 1.26 10 15.21 so i+50 r-9- 0.8 76 17 12 900 836 - Io ou 1150 050 SG Iron 76 ."--?�'%� - 50 mw 1150 15 1150 1074 1 13.3 2.24 11 250 900. 1440 15 76 17 no 130 500 1050 Iron 76 .- ‘71 1130 SG 400 950 lab 1140 I 4.2 1.37 iso 500 . 08 76 17 16 t 190 00 050 130 Elk Greca 76 - 119U _ w 1000 105 1350 17 14 1060 988 1 7.1 2.20 so 750 5021 MOO -'-1 :50-• I3 76 I e 95 11210 0013 Greca 76 k06o .o Ilnb 1050 1050 1 7.5 1.36 e0 no 13550 •os 0.8 75 20 a 72 50 50s Greca 75 ^' 15 1135 1135 Sc Ion las' T. 20 15 1135 1050 1 7.5 . '1 _nso _am Ica 1 75 164 I 940 Greca 75 ^' 1175 s0G 35 009 1000 4050 I. i gry 1090 980 a 10.1 33 5 Rso 50 nal ��+.�.���� 08 70 18b so 1350 511 Greca 7D m --`--' taw w 1100 IAO MO T 1 8.5 2.41 s0 1050 1100 MO m 15 70 18 11 765 700 110 sib Inco 1350 Greca TO ,. sc Isso IAV 00 1/2 35 1.56 x Loo 1140 1900 1 177 51 6'r: 1100 1062 r.0 1150 1400 1250 Asbest 177 ��� 1100 5 1400 1450 IMO I"o 195 3.21 w 1100 1451 1000 177 51 6'h 1100 885I;0 .1100 350 Imo Asbest 177 '^ �� 1140 2 w 155 loco lu , e '� 'L'�>)-"llin"S ` n 3 177 51 5'12 920 885 1/2 3.8 4.74 0 1550 Issc 050 // ,MO 550 1550 .}-- Asbest 177 T� 9'11 5 nso WO 1150 L,A 1 I Li•G�({I'�1 --, .. } tf 46 1.22 w; 1,40 150 1340 �# r f N s�r l 0.8 72 19 10'h 755 720nn 500 nso •no 3"Std. '^ 755 sc x0 low 115 __.._ I'S 14.2 1.53 do nso 950. OA: ,.�_.- _ 1.3 72 19 10'2, 755 6481`' 10 135 lase 3"Std. 1300 145 5 1 10.0 2.50 00 la 1150 1400 18 107 27 10 1070. 963 110 000 50 1350 American 4.2" 11130m 14550 1900 1550 10.0 3.10 11 1900 5 F -® 1070 2 107 27 10 1070 963r0 :050 121.21+50 American 4.2" w '+5 1500500 . I KIP 3 107 27 10 1070 963 1 10.0 456 n1150 1300O u 150 1350 155W0 American 4.2" F1130 110 166 white Ina500 - I 1100040 1 678 22.2 15 1020 949.2 1 6.9 155 aper I10 750 140 ar. _�7 tg2p w 1250 IAO 1400 American 2.6" 7 9.z6 while 1020 949.2 1 6.9 3.10 cher so 100". 1050 1150 American 2.6" wzo 2 67.8 222 15 IID 1350 1040 1. FI} - 1350 I. Imo 1022 1/7 5 9 1.93 00 1505 1.020 1350 1.2 146 48 T50 1086 00 1100 1150 I. Big 6 �� tk 5 Ism sa sw _ 71,2 1086 876 II', 193 3.34 w 400 1400 1500 Big 6 ami 10506 2 146 48 0 1550 IoW 1650 50 1140 IYIa 165' 4 1015 915 1 9.9 3.64 ss 500 ISM 1050 2.2 305 38 1421 15000 1450 Iso Astoria �• IDIS 5 1350 MO 1550 40 • 5 1063 1000 1 59 298 00 u. uw 4013 uu0 1150 1390 0450 Industrla10100 8r /2` I@i7 1.6 250 w Ism mo 14013 40 5 1063 1000 1 5 9 3.30 sc 1350 I. um tr� 250 110 1300 135 MO industrial 0100 8 r-'Z Z� 1067 2.0 5 1450 Isco Iso 40 5 s0 1450 1. I. 4� 22 250 1063 1000 1 5.9 3.65 m 1230 1400 . I. Industria10700 g Z� �` 1509 s Imo 1900 212 135 t4s 12 145 35 7'h 1100 1015 3/4 7.7 ac I 1200 ; 1250 IP-Sinus 14505 1150 1 8.1 3.60 5 1500 155 1550 �r� 2 183 38 7 1217 1118en 1400 1550 Ism 7.2" ASP 1.217 m Imo 135 I. 38 7 1217 1118 1 8.1 5.40 30 sw If. 12,5,0 990 A� 3 183 ° 7.2" 1217 neaecter a,max.!lad den dl N rvV On kb p w 020150 F ruled 0,1:135 srwr 2 same 2,0112 a 500000 d .sch 11p tons 0 t 350 above are [most 010 Is Gel related Male 404,01/21021W011, a 0,2weight es rip t1 yketlelok0 the via brl U22020 ith thanes, 1 h 1 00010 Peu,..9. i Re alblrhIPUetweelwl,d 40 ry d tl d m_ 1v uawntl Ind 141 y/e.1303,W0 k d d121n0n on pnsN on,ell, edah,weam 011400111 inm1, r ac. a/0111 to lowed ep+Mkr01n PO ac4m2 a00150 0014' 63 100.0/2 115 W Ir OlS hee are 0000 0 b o, Mlo 't t k52pss nl les 00010124 arc merrhtd n 1 I 22,11014129 h,5511130011.0000,01,142,4002 U 44d n profile } b'Inludmy dn0e - help NPN Rt. MaUNNf Including h. I NSh ch Ih hhgl los Inng N bpi r9 950 Pere, qu.5l 001Ing '4U b he s0 "'2lo hes will be a pbdlpon rcg on the achol Ospe ol00el du Me reduced 0,555,/3ofsen.Jeadr5 and hwel,a,eela0avater evacoaten. O l '1 1 W naUl I am h.l k' - '0d-Nq bnurc l•vkaervknt W,3nelen. "supspool's,40 hoed C-1N load W b eek aW N plea e'Rren'e re,essnaing muchcmdne,denec'n. gained P d M. M x141 r ed d apnbP- and rale b mode lsrrcardn9 11 n47ual1nInformation ;bb all lit r 9 prone. 1051342,0r wralel 04141240520ml ualus ayh pdeedbe doe (Gabe m 9 M W 11 The vanes she00140e So the 0,1301306313 depicted.4240 potation 015005 pJeenrom the a01p0444r00n '21.50ngeste050.012m Span down 504 Me Asbestos plafiles 101140024141110 dg3esl,ate realtv 0,2001c41.hese 211.11Uf ard SIMLA PrnOles Catalogue.400241.,.Owbth•^H Co+emleWndlnl 4150161 0135+0 arc 4,401 as a replacement brlhe obsolete aevo,n 0,hmo0 panels wh0S ale row panee4 00413 tse and i� 1"0 nxrtklnaMr'0'se the"1p Structure H Ing broiler/P.42 dkrauNly 1011 WV,.41.120pen P n Eclipse Engineering, Inc. p g structural solutions KA 4,--kfv illk 1A49), ti ' June 27, 2008 «r 0 - Y. Tai Le1,41tiss‘d\ ki ii 1Ec ;.e 11403 East 6th Avenue ,r Spokane Valley,WA 99206 .. �.-. 01StalgOr, age S Zo Re: Greenhouse (patio)Addition Spokane Valley,Washington Tai, As requested we have reviewed the framing for the above noted project. We have based our review on the preliminary framing plan (see attached framing plan) prepare by you. The proposed addition is a one story wood framed exterior greenhouse/patio structure. The roofing will be a clear plastic material (by others) applied directly on top of the wood rafters. Reference the framing plan, sheet 1 of 2 for rafter, girder, ledger, post, knee brace, and footing sizes. Reference attached detail A, sheet 2 of 2,for the knee brace to column and beam connection. Eclipse Engineering has designed the framing shown on the attached plan only and do not take responsibility for the integrity of the existing building, the infill for the greenhouse, or the roofing material. It is our assumption that the infill and roofing materials will be designed for all vertical and lateral loading, (30 psf snow, 85mph Wind, Seismic Design Category C) of the Spokane Valley area. Sincerely, Brian Hanson . Eclipse Engineering, Inc. ` ! E , JUN 27 2000 Attachments: Framing plan, sheet 1 of 2, and Detail A, sheet 2 of 2. ; y h 12704 East Nora, Suite H, Spokane Valley, WA 99216 a Phone: (509)921-7731 Fax: (509)921-5704 a, www.eclipse-engineeririg.com ,,YEARS OQ�,SHE0 `N Si 114061.31 L e,r,� aic, A4kttliiiO4'#)14"- 2 6 @ 16"MAX.WITH JOIST HANGER® Licicod .5crt'.)s e !�c t.°. L. rot, ci?f' fr44�P `ate I �'11 (� -4311x" 1.ecaa,J �•$t,..?, R` Rq 1 mega ®A. B1.it-6- 6,f. 53'x`° AS. ��,7-v ( ) 57‘41)).5().-•1 cam- T 1 P t3) P.-1"es 447 a-X 11- AL1t...1 .• . .11 ' 44.1%.# .--,, 4.‘„,,,,, 5+3'..4 UP OIL 4,1,4" '0' 1,% 1"," am-,1-11-43 * , , _ ;or L,,,,,,..., , ........ 1.4 ,....xtsr%N4R. 500, ` * ' -....., --„, ,1‘2nII1 4,1..;/.'rh4Vi1.4,i4.4b„...,..1.,..-..40- 0,,S0, 44444,6.. .f, 11 v:aJ.4r:s).eXr" ":v''i'p,s',{,J'4'4'), :a::' :,., 0 ' .-1 i �', =, EACH 2i1 ` \ ,,' -- C' ,- Q1> rte,, ` #.. 1 tS .', 1 ` "moi I', le Q 4 S �gy �� � 1 1 n �� Z,bD i9 � ben !_��� „`+.,! % e ' r .. 8 A 4 °"�r 'eN, 1I ALL ROOFING AND SIDING ARE CLEAR PLASTIC PANEL -'\ A4;00011f1I wiPaP 3 °rs' 2'x2'x3'FOOTING r� t° ��1 - l+ol 1- e -EBAR 2x6 @ 16" MAX. WITH JOIST HANGER 2x12 ALL ROOFING AND SIDING ARE CLEAR PLASTIC PANELS 2'x2'x3' FOOTING #8 REBAR 4 Eclipse Engineering, inc. . structural eol ytA92 s _X � / C tfa )3_, 12704 E.Nora Spokane Valley,WA 88216 1!, /� os e Suite H Ph: (509)921-7731 www.edipse-englneering.com 8�� _ se wt e Z flG t 5.71L4 p - ______t t t, __ _ „ .f . _. ... ....fix mem. .... , \ 1 otos ., :.. 1 I a3b 8,71 5)&3 ae� yam..:- '� i ,� P ` - s be;,,,, 5 4411 t otr) A Ka L it N , Ci, )1,d NolLs. To 10°0' �11,"Lorie `�. 4 5 / a � P 4t lip _, k°/ i 1 1&A 4f., 14 10—z pas is,io 0 14).-aceaiL4(..e e• f)fflv \ 4- co L- m 1:5 : • Minimum depth for frost protection in the City of Spokane Valley is 24 inches measured from the bottom of the footing to finish grade. Grade slope away from building a minimum 6 inches in first 10 feet. PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FI ()OR SYSTEMS PRIOR TO FRAMING IN, PEC rIONS THESE PLANS MUST BE KEPT ON THE JOB SITE THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS .....05 REVIEWED FOR DrCO LIANCE SPOKANE VALLEYIN DIVISION M / ,,P- 6TH AVE. STREET I t �1 1 i , s 1 I TI / t i l I 1 EXIT 7lNG EXISTING BUILDING GARAGE • RESIDENCEi I 11403E. 6TH AVE. ���� ro I SPOKANE VALLEY,WA /// 199206 ADDITION PATIO, cot I 1 1A , 14' 37' 22° '" 14 I v1 I • 1 I ir T Iiii°'. 87' a 4) PLANNING DEPT. APPROVED SITE PLAN BY: E-- fru-4i' DATE: `- ./ti tet; C? Spokane �SValley Community Development Building Division 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 Inspection Request Line: 509-688-0054 All inspections are scheduled through this line THIS CARD MUST BE POSTED ON THE JOB SITE AT THE TIME OF INSPECTION ***Inspection requests must be scheduled before 7:00 am the morning of the desired date of inspection*** To call in an inspection request: 1. Call the Inspection Request line: 509-688-0054 2. When prompted, indicate your inspection area as checked below: EAST AREA Press "1" �. SOUTH AREA Press "2" NORTH AREA Press "3" 3. Leave the following information: Project number: v- ZO Project Address: //c/0 3 1-'4-- Type of Inspection Your phone number Your preference for AM or PM inspection time *** Special arrangements for access *** The inspector will make every effort to accommodate your preference. Depending on workload, the inspector cannot guarantee AM or PM inspection. 4. To speak directly with the inspector, please call their direct line between 7:00 am-7:30 am. ..u,,,„_s..-,, Spokane �•�Valley Community Development Building Division 11703 E Sprague Ave Suite B3 Spokane Valley WA 99206 PROJECT INSPECTION RECORD Inspection Request Line: 509-688-0054 All inspections are scheduled through this line THIS CARD MUST BE POSTED ON THE JOB SITE AT THE TIME OF INSPECTION PROJECT NO: 2, ZO(D3 PROJECT ADDRESS: ll yo 3 E. 641.— Inspection Date Notes Corrections Approved Inspector Left? SETBACKS FOOTINGS REINFORCEMENT UNDERGROUND RADON SHEAR/BRACE WALL SHEATHING HOLDDOWNS FRAMING GAS PIPING DUCT WORK WATER PIPING DRAIN/WASTE/VENT INSULATION CEILING GRID FIREWALL/GWB FIRE PROTECTION HVAC HOOD/DUCT OTHER REQ: FINAL: FIRE FINAL: PLANNING FINAL: ENGINEERING FINAL: BUILDING -- H., For City Use Only PLUS Project Number CITY OF Project Address pokIfle Val y° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is L The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is aquality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist willprocess the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07