2001, 09-18 Permit: 01008006 SewerSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT'
1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050
(509) 477-3675
(
SITE INFORMATION
PROJECT INFORMATION
Site Address: 14606 E 5TH AVE
SPOKANE, WA 99216
Parcel Number: 45232.0722
Subdivision: ST.MARY ADD.
Block: 3 Lot: 3
Zoning: UR -3 Urban Residential 3.5
Owner: CROSS, TRAVIS & SHERI
Address: 3522 E HARTSON
SPOKANE, WA 99202
Building Inspector DAN HOWARD
Water Dist:
Project Number: 01008006 Inv: 1 Issue Date:
Permit Use: DRYLINE SEWER CONNECTION
Applicant: CROSS, TRAVIS & SHERI
3522 E HARTSON
SPOKANE, WA 99202
Contact: CROSS, TRAVIS & SHERI
3522 E HARTSON
SPOKANE, WA 99202
9/18/2001
Phone: (509) 534-0385
Phone: (509) 534-0385
Setbacks - Front: Left: Right: Rear.
Group Name:
Project Name:
PERMIT(S)
Saver Connection Permit
Contractor: OWNER
License #: OWNER
SEWER CONNECTION
1 $85.00 PROCESSING FEE
Total Permit Fee:
FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:30-5:00 PM
MONDAY THRU FRIDAY
Call for inspection prior to cover. ONE WORKING DAY NOTICE REQUIRED.
Contractor or applicant is to field locate and confim► the elevation and position of sewer
stub prior to any other excavation.
Sewer stubs are to be checked prior to connection to ensure that they have acceptable
grade and are clear and unobstructed to the main sewer.
Whenever possible, sewer lines should be constructed to allow for gravity flow from the
lowest level of the structure.
This permit must be presented to the job site inspector for verification. To locate buried
cables, gas piping, water lines, etc. CALL BEFORE YOU DIG, (509)456-8000.
STATE LAW RCW 19.122 REQUIRES THAT PRIOR TO ANY EXCAVATION THE
"CALL BEFORE YOU DIG" CENTER BE NO 1IFIED. CALL BEFORE YOU DIG AT
LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000.
$15.00
$100.00
C PAYMENT SUMMARY Page 1 of 1 NOTES _
PERMIT Processed By: FRAZIER, CAROL
Printed By: SCHNEIDER, PENNY
Tran Date Receipt # Payment Amt
9/18/2001 7261 $100.00
Total Fees AmountPaid AmountOwing
$100.00 $100.00 $0.00
NOTICE
It is the responsibility of the applicant/permittee, not Spokane County, to see to it that the use described on the front of this permit complies with
applicable codes and requirements and that required inspections -are requested. Failure to request required inspections and obtain the necessary
approvals prior to progressing beyond the point where Inspections are required may necessitate removal of certain parts of the construction at the
applicant's/permittee's or property owner's expense. At a minimum, the following Inspections ARE REQUIRED by County Code:
1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes.
NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning
regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from
the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of-
way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of
right-of-way between your property and the actual Improved street/curb. The responsibility to comply with applicable setback provisions lies solely
with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your
property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the
owner's/permittee's expense.
2. FOUNDATION - when forms and reinforcement are In place and prior to placement of concrete.
3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing.
4. INSULATION - prior to the installation of drywall.
5. PLUMBING - after rough -in, before covering, and final.
6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final.
7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan)
required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site
drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com-
pleted prior to final approval of a building or issuance of a Certificate of Occupancy.
8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed
inspection record card must be available on site.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be
Inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects.
CALL 477-3675 FOR INSPECTIONS.
TO INSURE PROMPT SERVICE, PLEASE GIVE 24 HOUR NOTICE.
YOUR INSPECTOR IS
UNDER CERTAIN CIRCUMSTANCES, PARTS OF YOUR PROJECT
• Road cuts for utilities or driveways, Division of Engineering & Roads •
477-3600
or State Department of Transportation
456-3000
• On-site waste disposal system, Spokane Regional Health District
324-1560
• Construction in a flood plain, Division of Engineering & Roads
477-3600
MAY REQUIRE INSPECTIONS FROM OTHER AGENCIES:
Sewer connection, Division of Utilities
477-3604
or City Public Works Department
625-6300
• Electrical wiring, State Department of Labor and Industries
324-2640
PERMIT EXPIRATION AND REFUNDS
Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped
for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At
a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one
year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions.
All refund requests must be made in writing by the applicanUpermittee (shown on the reverse) no later than 180 days after the date of fee payment.
Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized
more than 180 days after fee payment.
MISTAKE?
If you think we've made an error in processing this permit or in conducting Inspections pertaining to It, or find erroneous information in the permit,
please bring it to our attention Immediately by filing a written request for correction within 10 working days of discovery. All such requests should be
directed to the Division of Building and Code Enforcement at the address found on the face of this permit.
I certify that 1 am the owner or am authorized by the owner to make this application and that I have examined this permit/application, state that the
information contained in it and submitted by me or my agent to compile said permit/application is true and correct, and authorize Spokane County
to proceed with processing. In addition, I have read and understand the INSPECTION REQUIREMENTS/NOTICE provisions included herein and
agree to comply with same. All provisions of laws and ordinances governing this type of work will be complied with whether specified herein or not.
I understand that the issuance of this permit/application and any subsequent inspection approvals or Certificates of Occupancy shall not be
construed to give authority to violate or cancel the provisions of any state or local law regulating construction or agreement concerning this
property, or as a warranty of conforma a ith the provisions of any state or local laws regulating construction.
SIGNATURE OF
APPLICANT/PERMITTEE (�✓vy� APPLICATION ci_ j G
OR AUTHORIZED AGENT DATE -Z a -0 /