Loading...
2002, 08-06 Permit: 02005693 Residencea Site Information Project Information Site Address: 15903 E 5TH LN VERADALE, WA 99037 Parcel Number: 45242.1610 Subdivision: SHELLEY LAKE Block: 6 Lot: 10 Zoning: UR -3 Urban Residential 3.5 Owner: DOUGLASS, LANZCE Address: 815 E ROSEWOOD AVE SPOKANE, WA 99208-5507 Building Inspector: DAN ROWAN_ pt, l•` ,> '- Water prig: VERA 6r"ct l Project Number: 02005693 Inv: 1 Issue Date: Permit Use: RESIDENCE W/GARAGE - NATURAL GAS Applicant: DOUGLASS, LANZCE 815 E ROSEWOOD AVE SPOKANE, WA 99208-5507 Contact: DOUGLASS, LANZCE 815 E ROSEWOOD AVE SPOKANE, WA 99208-5507 8/6/02 Phohe: (509) 483-6532 Phone: (509) 483-6532 Setbacks -Front: 20 Left: 6., Right: 6 Rear: 40 T I t; j3';3 fl'' i Group Name: t 4 ;Peoject,Naing:;1. ;tile_ ` t' 260-00S(1 z_ I Permits Building Permit New Building Dim: 56 X 24 1 Story Sq Ft: 1,872' Grp: R-3 Type: VN Contractor: LANZCE G DOUGLASS, me:': License #: LANZCGD072P5 BASEMENT U R-3 VN DECK R-3 VN GARAGE U-1 VN RESIDENCE R-3 ;.)IN Total Value: FOR BUILDING INSPECTIONS CALL (509) 477-3675. 936 120 792 936 la 732.40 RESIDENTIAL VALUATION STATE SURCHARGE RESIDENTIAL SURCHARGE Total Permit Fee: $792.50 $4.50 $174.35 $971.35 Mechanical Permit Contractor DANCAR MECHANICALINC.„,,.`' License #: DANCAMI022C7 VENTILATING FANS RANGE }Jeep TYPE II GAS APPLIANC $40.00 CLOTHES DRYER $10.00 GAS LOG OR GAS INSERT $10:00, `GAS WATER.HEATER $12.00 GAS PIPING FOR.',IECILh.NICAL INSPECpRIS G L (150,9 4' - S Plu»tbing Permit Contractor: GOLD SEALMECHANICAVINC Total Permit Fee: License #: GOLDSM*290C4 TOILETSBIDETS ; a `•'. SHOWERS DISH WASHERS CLOTHES WASHER CROSS CONNECTION DEVICE FOR PLUMBING INSPECTIONS CALL (509) 477-3675. %$18.x0 SINKS $6:00 .TUBS $6.00 GARBAGE DISPOSAL $6.00 FLOOR DRAINS $6.00 WATER USING DEVICES Total Permit Fee: 1 $10.00 1 $10.00 1 $10.00 3 $3.00 4 2 3 $105.00 $24.00 $12.00 $6.00 $6.00 $18.00 $108.00 Processed By: FRAZTFR, CAROL Printed By: WENDEL, GLORIA 4 'Page' 1 of 2 PERMIT NOTICE It is the responsibility of the applicant/perriittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant'srpermittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway tight -of - way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to property locate the structure may require its relocation at the owner•s/pernittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. Ali permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road Improvements, parking, and landscaping are common requirements of a permit/site plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special Inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire inspections, Division of Building and Code Enforcement 477-3675 • Construction in a flood plain, Division of Engineering & Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering & Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations --please call us if you have any questions. All refund requests must be made in writing by the applicantipernittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1116 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 FORM 30-050202 BLDG PERMIT v Site Information Site Address: 15903 E 5TH LN VERADALE, WA 99037 Parcel Number: 45242.1610 Project Information Project Number: 02005693 Inv: 1 Issue Date: Permit Use: RESIDENCE W/GARAGE - NATURAL GAS 8/6/02 Permits Payment Summary Total Fees AmountPaid AmountOwing $1,184.35 $1,184.35 $0.00 Tran Date Receipt # Payment Amt 8/6/02 5977 $1,184.35 4NVotes t,Condit;ions,of Apprjonal g,,1: \ s; f2Yry ^1. t_r"� �i�f RECD PLAN$'PRIOR TO 7/1/02 WSEC CHANGE. If `;r it.• t "#fl\, 4 . AI f °S rr�.p V. S A492 f70.4?4j.,0 Processed By: FRAZIER, CAROL Printed By: WENDEL, GLORIA 'Page 2 of 2 PERMIT 1 NOTICE It is the responsibility of the applicant/permittee to see to it that the use described on the front of this permit complies with applicable codes and requirements and that required inspections are requested. Failure to request Inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by County Code: 1. FOOTING - when forms and reinforcement are in place and prior to placement of concrete—all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Typically, side and rear yard setbacks are measured from property lines, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of property lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permittee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION - prior to the installation of drywall. 5. PLUMBING - after rough -in, before covering, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prior to occupancy and/or use. Please provide 24 hours notice. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permit/site plan which must be com- pleted prior to final approval of a building or issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAY/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be inspected prior to cover. Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire Inspections, Division of Building and Code Enforcement 477-3675 • Construction in a flood plain, Division of Engineering Si Roads 477-3600 • Electrical wiring, State Department of Labor and Industries 324-2640 • On-site waste disposal system, Spokane Regional Health District 324-1560 • Road cuts for utilities or driveways, Division of Engineering 8 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or State Department of Transportation 456-3000 • Sewer connection, Division of Utilities 477-3604 or City Public Works Department 625-6300 PERMIT EXPIRATION AND REFUNDS Unless otherwise noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or is stopped for a period of 180 days, unless a written request for an extension of the permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original fee, subject to certain limitations—please call us if you have any questions. All refund requests must be made in writing by the applicant/permittee (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit. No refunds may be authorized more than 180 days after fee payment. MISTAKE? If you think we've made an error in processing this permit or in conducting inspections pertaining to it, or find erroneous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discovery. All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division of Building & Code Enforcement 1116 West Broadway Avenue Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477-4703 TDD: (509) 477-7133 FORM 30-050202 BLDG PERMIT