Loading...
2003, 05-01 Permit App: BD-03-220 MH,p&anNowt c 11707 E. SPRAGUE, STE 106.0004 y SPOKANE VALLEY, WA 99206 (509)688-0036 FAX (509)688-0037 S1Th INFORMATION PROJECT TRANSMITTAL: TRANSMITTAL DATE: 5--/.-0--s PERMIT INFORMATION Site Address: 30- E -<- Parcel Number: 55) 9 .2. /&07 Subdivision: a pelt Va. (Ley Es+ #2. Block: Lot: 7 Zoning: Re. 7 Water Dist: Marl MaSsin 2•n309 6—‘11 Owner: Address: Building Inspector: ,e Ut h BUILDINGS: Permit Number: B003-2:20 Issue Date: s/r/03 Permit Use: p(ctGe -1 of sI /e14..) 2 bed'vonn Applicant: Dwn tr . Phone: Contact: Mar kt- ac ,s/n3al -e Phone: 9x %CJ Contractor: Setbacks -Fronts - Left:gsRight:lp Rear: 3S APPROVALS 14 k n PLANNING: 0 X tyrely l pit„ . ?moi /d5 ENGINEERS: HEALTH: /a yOfe au SEWER - FIRE DI$T= APPROVALS d egress. UNTY ROADS. Work on street right-of-way may not be performed until staked by County Road Department and -work must be rformed ig accordance with stakes. Points of ingress and egress must be approved by the County Engineer. 1VIf1G OF BUILDINGS. A permit is required to move an eaisting►huilding. When a building is moved on a County or State ghway, clearance must be obtained from the County Engineer and/or State Highway Department. 'CESSORY BUILDINGS. Accessory buildings (garages, sheds, etc.) require a separate permit. STRICTIVE COVENANTS. Builders should check provisions of covenants or dedications and easements running rich are enforceable through civil action. County Officials can not bring action to enforce covenants or APPLICANT FILL IN BELOW THIS LINE Address _ Phone l 7 6:'' Address Phone Address Phone , Address x l •e4Q 2'14)/t Phone C ��'`/i `TO with the land dedications. ame of Owner rchitect iginee ontractor 1 11 egal Des r ption of Property (Give complete description from deed, tax receipt, e ) c. — / � t_Pe_ 1'2 # f (2,2 ti PeeALJ) A4. /9,51;-2 — 160'7 )ESCRIPTION OF WORK: New A Addition Remodel Moving Bldg. Zone / Fire Zone ,p '7/' �/ / 5 ' Sewage System S �te % s oust. FJ•c.` `. ' .:-:::.-Ra ^ r ` ;ize of Lotf� (Fr., Conc., Br., etc.) sd' Total Sq. Ft 5' valuation % �j 6��� ;tories _I—Dimensions %� X ' .1-...t.,5411../A4-.211 — ioorns Baths Basement a " Foundation Const Chimney _del:--- Fireplace(Number �/%�� (Full, part, none) } seat. System (-3,.. may+ Type of Roofing YY1.('tr17,) Ext. Finish �3'}"/.+'41," Int. Wall Finish _ ,%-Ed id/,41_1 1 No. of Units _ Bedrooms / Jse of Bldg. rY��%--t��" !�`�'�'�-� �{`/� PLOT PLAN property lines; (2) street or road locations; (3) location of existing and lines aid streets; (5) dimensions of buildings; (6) location of sewage sys- Draw sketch with dimensions showing: (1) proposed buildings; (4) distance to property tem and water supply lines. NORTH as show SOUTH RESIDENTIAL — COMMERCIAL arehy certify information submitted 's Owner or Agent Data / A LAND USE OR STRUCTURE PERMIT MUST BE ON THE PREMISES BEFORE CONSTRUCTION COMMENCES. THIS IS NOT A PERMIT. DO NOT WRITE BELOW THIS LINE /i State License No. Ind. Ins. Acct. No. APPROVED B Plumbing Permit Heating Permit Sewage Permit Plans Received Plans Checked P1 <1411. correct and there are no other structures located on this property except Your street address will be Sewage Permit Number Remarks Issued 1 Building Permit The zone is / l 2c1v Receipt Issued 0u.. r...4.. City of SPOKANE VALLEY fleAA& cufrxR)14 14)0L -0) -- PERMIT # BUILDING PERMIT APPLICATION Box 1 OWNER 7/247,/,4,-XM/44,JOB LOCATION i��� ;��z OWNER'S AE5DRESSI� CITY PHONE gg8 787, DESCRIBE JOB 9'9O1>° THIS PROPERTY IS OWNED BY: SINGLE/MARRIED PARTNERSHIP CORP. BOX 2 CONTRACTOR'S NAME CONTRACTOR'S ADDRESS CONTRACTOR'S REG.# PHONE CITY EXPIRATION DATE (CARD MUST BE PRESENTED AND COPIED OR VERIFIED) BOX 3 CONTACT PERSON OF PROJECT PHONE ADDRESS CITY ZIP BOX 4 SEWER AVAILABILITY WATER AVAILABILITY BOX 5 ESTIMATED PROJECT COST $ EXISTING BLDG. VALUATION $ BOX 6 PROPERTY TAX ACCOUNT NUMBER LEGAL DESCRIPTION (IF NECESSARY, PLEASE SUBMIT A SEPARATE PAGE WITH THE LEGAL DESCRIPTION) CENSUS NUMBER LOT NUMBER BOX 7 BUILDING SQUARE FOOTAGE (Existing / proposed) 3RD FLOOR / OTHER BASEMENT UNFINISHED / CARPORT / TOTAL 1ST FLOOR / 2ND FLOOR / / BASEMENT FINISHED DECK / GARAGE HEIGHT TO PEAK OF BUILDING FT. BOX 8 ( ) SINGLE FAMILY ( ) MULTIFAMILY (NO. OF UNITS ( ) COMMERCIAL / INDUSTRIAL ( ) TENANT IMPROVEMENT ( ) NEW CONSTRUCTION ( ) EXISTING STRUCTURE TOTAL AREA OF PROPERTY SQ. FT. IMPERVIOUS SURFACE SQ. FT. BOX 9 PLUMBING FIXTURES (Including rough -ins) MECHANICAL APPLIANCES PLEASE USE THE ATTACHED PLUMBING / MECHANICAL FORM FOR THE LISTING OF ALL APPLIANCES, SYSTEMS, HEATING AND AIR UNITS, FIREPLACE INSERTS, WATER HEATERS, CONVERSION BURNERS, LAWN SPRINKLER SYSTEMS, BACK FLOW PREVENTERS, ET AL. BOX 10 Water Service meter size (if known) Also s BOX 11 Septic Tank — Not generally allowed in the City of Sp Your sewer purveyor and the Health District (See BOX 12 Street use may require a " Street Use Permit" for s:wer, water, sidewalks, curb cuts. on the Public Works Department. I VERIFY UNDER THE PENALTY OF PERJURY THAT THE INFORMA CORRECT TO THE BEST OF MY KNOWLEDGE AND FURTHER THAT I AM A . - ABOVE PREMISES TO PERFORM THE WORK FOR WHICH THE APPLICATION IS MADE. ane V Ile . For special circumstanc contact X 4)x .+.. FURNISHED BY ME IS TRUE AND OWNER / AGENT DATE (OVER) v. D ' I hereby authorize the City of Spokane Valley to charge the fee for this permit to my credit card: Visa Mastercard Expiration Date Print the name of the Holder Signature OFFICE USE ONLY - PLEASE DO NOT WRITE BELOW THIS LINE ZONE 'SETBACKS: FRONT SIDE REAR HEIGHT LIMIT PLANNING DEPARTMENT APPROVAL DISAPPROVAL DATE REMARKS SEPA: EXEMPT NOT EXEMPT FIRE DEPARTMENT REMARKS PPROVAL DISAPPROVAL DATE PUBLIC WORKS DEIARTMENT APPROVAL DISAPPROVAL DATE 41- TYPE L TYPE OF JOB: NEW RESIDENCE RES. ADD/ALT NEW INDUSTRIAL IND. ADD/ALT NEW COMMERCIAL _ COMM. ALT/ADD NEW MULTIFAMILY NO. UNITS 4 N MULTIFAMILY ADD/ALT TENANT IMP. ROOF OTHER OCCUPANCY < TYPE OF CONSTRUCTION STORIES .1 BUILDING SQ. FT. @ = BUILDING SQ. FT. @ = BUILDING SQ. FT. @ = BUILDING SQ. FT. @ = TOTAL SQ. FT. TOTAL VALUATION BUILDING PERMIT NO. PLAN CHECK FEE REC'D RECEIPT NUMBER .I PERMIT FEE PLAN CHECK FEE PLUMBING FEE MECH. FEE TOTAL FEES WSBCC SURCHARGE ENERGY SURCHARGE OTHER CHARGES a AMOUNT DUE BUILDING DEPARTMENT APPROVAL BY DATE ASSIGNED ADDRESS