Loading...
2008, 04-21 Permit App: 08001287 Deck Cover Project Number: 08001287 Inv: 1 Application Date: 4/21/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: DECK COVER Contact: NOBLE,ANTHONY D&STEPHANIE C Address: 13202 E 6TH AVE C-S-Z: SPOKANE,WA 99216-0672 Setbacks:Front Left: Right: Rear: Phone: (509)926-5277 Group Name: Site Information: Project Name: Plat Key: 000279 Name: BURCHELL ADD District: Sout Parcel Number: 45221.0915 Block: Lot: SiteAddress: 13202 E 6TH AVE Owner:Name: NOBLE,ANTHONY D&STEPHAN Address: 13202 E 6TH AVE Location::CSV SPOKANE,WA 99216-0672 Zoning: UR-3.5 Urban Residential 3.5 Water District: Hold: ❑ Area: 12,924 Sq Ft Width: 75 Depth: 141 Right Of Way(ft): 0 Nbr of Bldgs: 2 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 4/9/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Originally Released: 4/17/2008 By: tschmidt Permits: Operator: JD Printed By: JD Print Date: 4/21/2008 Project Number: 08001287 Inv: 1 Application Date: 4/21/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation COV DECK R-3 VB 350 $5,250.00 350 $5,250.00 Totals: 350 $5,250.00 350 $5,250.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $125.25 WSBC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $50.10 Permit Total Fees: $179.85 Notes: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $179.85 $179.85 $0.00 $179.85 $179.85 $179.85 $0.00 $179.85 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 4/21/2008 Permit Center Scrrr of 11703 E Sprague Ave,Suite B-3 PERMIT NUMBER: -�l pokane Spokane Valley,WA 99206 PERMIT FEE: jValley� (509)688-0036 FAX: (509)688-0037 www.spokanevalley.org Community Development Residential Construction New Construction Accessory Bldg Permit Application n Addition/Remodel Deck n Other: SITE ADDRESS: 13 ZO Z E, k/--L 5/6 l}A // / ASSESSORS PARCEL NO: LEGAL DESCRIPTION: Building Owner: Contractor: Name: ./o r- /1 o G�G� Name. I ro c ,2 Address: 3 Z` 6¢-Z, Address: City: ��� J4/ State: w Zip: City: State: Zip: ii- Phone. 419 _ S.5. ax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: Phone: 9 5 1 — 1 7 / Describe the scoye of work in detail:� Cost ofEroject: $ �� -PC Proposed Use: �� 77-1/4_ �! , — Cmc) **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HABITABLE SPACE: Z MAIN FLOOR TO SQ. 2ND FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: AREA: FINISHED BASEMENT GARAGE SQ. FTG: DEC COV. PATIO SQ. FTG: 30% SLOPES ON SQ. FTG: 3 5-O PROPERTY: #OF BEDROOMS: CONSTRUCTION TYPE: HEAT U SEWER OR SEPTIC? The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws, codes or ordinan .6) Plan r additional information may be required to be submitted, and subsequently approved before this application can be pr sed. SIGNATURE: DATE: Method of Payment: ❑ Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 SCITY U11 11703E Sprague Ave Suite B-3♦ Spokane Valley WA 99206 pane ♦509.688.0036 ♦ Fax: 509.688.0037 • 40Valley® EX Completed Building and Mechanical Application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature and date. ❑x Three (3) sets of plans including Site Plan, elevations, floor plans, foundation plans with details, roof plan, framing plans and details. ❑X Show the height of any proposed buildings or accessory structures. ElFloor plan for each floor: Dimension to scale(minimum 1/8") and label each room (including sq footage of house and garage on plans) show each level of existing house and square footage of any additions. ElEgress windows: Provide at least one window or exterior door approved for emergency escape or rescue from basement and in every room for sleeping. 0 Floor framing details: Joist type, size, spacing and installation details. 0 Roof framing plan and details © Furnace and hot water heater location ❑X All header locations: type, size and connections MFoundation plan MInsulation information EDDecks and Stairway details All braced wall panel types: show locations and details of installation, including engineered design Smoke detector locations 22" x 30" attic access location 18" x 24" crawl space access One-hour separation detail: between house and garage CITY011.°11..\1New project Project Previous pre-app meeting Spo poiane Transmittal Plan revisions ❑ City of Spokane Valley Transmittal Date: .00001,7alley Community Development Tuesday,April 08,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone:509.688.0036 Site Address: 13202 E 6TH AVE Project Number: 08001287 Parcel Number: 45221.0915 Zoning: UR-3.5 Water District: Fire District: FD 01 Applicant: NOBLE, ANTHONY D & STEPHANIE Owner: NOBLE, ANTHONY D & STEPHANI 13202 E 6TH AVE 13202 E 6TH AVE SPOKANE, WA 99216-0672 SPOKANE, WA 99216-0672 (509) 926-5277 e-mail: e-mail: Contact: NOBLE, ANTHONY D & STEPHANIE Occupant: 13202 E 6TH AVE SPOKANE, WA 99216-0672 e-mail: (509) 926-5277 e-mail: EF, (I W1 [" n' Contractor: OWNER Arch/Engineer: L ( ) - 0 e-mail: DL _ Project DECK COVER Description: Building Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION ( j SITE PLAN PLANS Please send all plan review and project comments via e-mail to the highlighted individuals. . • ..„----- ________, 7Z-ficL17-' UP' c ‘I, , , , . t . , Q //. V(' / \ 0--/...- V 3 P,)2( 14 \& /' ---- 14 w (f) t k 1 .--/ .1 \ \. i I , 1 1 r ____• , , • , , /Z. ,•, , , PLANNING DEPT. PPROVED 'tg- oxsr e \ \ \ a i ‘154- BY:1,------‘ v AL i \ I\ \ i DATE: vl _,, .. . • 6?r-c-Ai` cil.,-.) p LI- .A.,),- r r -Ft car`' ` X / /\ ,�� \ 30 'I ////t+ k 3.....,- 7 ,, \it t.,\ . guu4 ()N uJA,L%-- 14 t tk-Ofes' 1 II }1 i t'-C;(‘) ,''''')'''')) Z,51D cy r,. .`k I i \ i � �� '7 Z i Roofing material 15, F` `T �` Sheathing 1�z` -' " • • / Rafter size 2--x 12 _ See / spacing 2_4-•r details r2x blocking 1 Beam size Zx I 0 House _,--4r9- 14ft maximum wall Post size G x G (4 x 4 minimum) spacing A4,0; 'o' 3-" (6 x 6 recommended) ♦ — Pre-engineered bracket ,k / DE5 IE,/JED Foe LPN,:F7 ':'`!! 2.11" minimum�e alp 6 p,r. ' ST P 18" minimum width I- ,_ Existing 1\X 1 .:4-,,,,..c._--- rafters Continuous 2x ledger Existing anchor bylagscrews wall 2x blocking ' A Approved hanger ' . s rild� \PP"• New rafter Ne rafter to Existing /f existing bearing A' wall --L;- Li LI-- ,L Approved metal bracing Bracing required te /v 8. 0,9fri;' .._,Z . • le-,>--1- ,,Q._ ill L , ,,AA.1 i:t-- 7 Z L(1.1 ,. '' ' - ...c.,- ,/ ‘; Czf /eL)c2 t 0 et, .7-- / 1 IS„ G,Pp .\ ' '�- Z c�Ct�3G ;-44 ci,Y• '2"" 0 , >c' r\ So (-4,'D a La)c-- ,o c : w`' `Timms V" -. (3 E c e(N AAFTV \____.--------- y ' r 0 O. ,-,; itA-Fri-- Fop. -wA6-c.-r ,, 06-ti-A.0.1 U o N NX vJA t.L— 6.Lo t e;(44/( /___, of' , -,<'-' )csiT C 4 (,,NK, M'cX S PikiJ t3 T ) 3 PoSrS 1S 1 F f DIk 1 // -F0 T .' 6©HG, of P 2 i . .......... ... z ' f PROVIDE DIAGRAMS AND ENGINEERING LAYOUTS FOR ROOF TRUSSES, BEAMS AND FLOOR SYSTEMS PRIOR TO FRAMING INSPECTIONS CITY COPY THIS BUILDING SUBJECT TO FIELD INSPECTION CORRECTIONS REVIEWED FOP CODE COMPIANCE SPOKANE VALLEY 3Ull )INCA VISION For City Use Only CITYokaPLUS Project Number (A '-7S1Project AddresspoIine ‘?„,/c),2 alle ° y 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is ( I IM The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review );=. Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07