1996, 10-11 Permit App: 96008926 Reroof PROJECT NUMBER= 96008926 APPLICATION DATE= 10/11/96 PAGE= 01
****** THIS IS NOT A PERMIT ******
PENALTIES WILL BE ASSESSED FOR COMMENCING WORK WITHOUT A PERMIT
SITE STREET= 13306 E 6TH AVE PARCEL#= 45221. 0808
ADDRESS= SPOKANE WA 99216
PERMIT USE= REROOF (EXISTING WOOD SHINGLE & COMP/OVERLAY NEW COMP)
PLAT#= 001050 PLAT NAME= GRAY 1ST ADD REPLAT
BLOCK= 1 LOT= 8 ZONE= AGSUB DIST#= F
AREA= 00000000 F/A= F WIDTH= DEPTH= R/W=
# OF BLDGS= 1 # DWELLINGS= 1 WATER DIST =
OWNER= BAILEY, JAMES PHONE= 509 928 2950
STREET= 13306 E 6TH AVE
ADDRESS= SPOKANE WA 99216
CONTACT NAME= JIM BAILEY PHONE NUMBER= 509 928 2950
BUILDING SETBACKS: FRONT= NA LEFT= NA RIGHT= NA REAR= NA
******************************* BUILDING PERMIT *******************************
CONTRACTOR= OWNER PHONE=
NEW= REMODEL= X ADDITION= CHANGE OF USE=
DWELL UNITS= 1 OCCUP. LD= BLDG HGT= STORIES=
BLDG W X D = X SQ FT= SPRINKLER= N
REQ PARKING= #HANDICAP= CRITICAL MAT= N
DESCRIPTION GROUP TYPE SQ FT VALUATION
REROOF R-3 VN 800. 00
ITEM DESCRIPTION QUANTITY FEE AMOUNT
RESIDENTIAL VALUATION Y 35.00
STATE SURCHARGE Y 4.50
RESIDENTIAL SURCHARGE Y 7 .70
PERMIT TYPE FEE AMOUNT AMOUNT PAID AMOUNT OWING
BUILDING PERMIT 47 .20 .00 47 .20
47 .20 . 00 47 .20
PROCESSED BY: JULIE SHATTO
PRINTED BY: JULIE SHATTO
******************************** THANK YOU ************************************
•
CITY/COUNTY JOINT POLICY
S
REROOFING
The City and County of Spokane have adopted the Uniform Building Code Appendix
Chapter 32 as the standard for reroofing. The following is intended to reflect the
requirements of this chapter, and in addition address inspection requirements.
1. For Shingle & Shake Roof Coverings:
The maximum number of roofing overlays are as follows: For asphalt
shingles as base layer -- two (2) asphalt overlays, or one (1) wood
shake overlay. For wood shingles as base layer -- one (1) wood
shingle overlay, or two (2) asphalt overlays, or one (1) wood shake
overlay. For wood shakes as base layer, no overlays are allowed.
Sufficient roof coverings must be removed prior to the installation of
a new roof covering to reduce the number of layers to conform with
the total number allowed.
2. Inspections Required:
Visible portions of the exposed substrate or deck must be inspected by
the building inspector. The building inspector will either accept the
existing deck or substrate, or will require replacement of all or
portions of it with approved materials.
The permit holder is responsible for notifying the inspector on the day that the work
commences for the tear-off or reroof. Such communication will minimize interruption of
work schedules.
This policy will help to ensure that:
(a) Existing roof structures do not become overloaded; and
(b) New roof coverings are securely attached to sound material.
CITY OF SPOKANE COUNTY OF SPOKANE
;�• , 1, v
Bob Eugene, B ' ding Official J. es Manson, Buildings Director
•
Effective Date: August 16, 1994
b\Re-roo f.Pol