Loading...
2012, 10-22 Permit App: BLD-2012-1877 Pole Bldg . �" rerm;t k,erii i SpokaS ne 11707 E Sprar-Ave,Suite 106 PERMl1 Numtsix: �� v 5Valley Spokane09)688-003Vall, WA 99206(509)688-00037 __RMIT FEE: 11977 FAX: Community Development www.spokanevallev.ore Residential Construction H New Construction Accessory Bldg Permit Application H Addition/Remodel n Deck I Other: SITE ADDRESS 12- 2-5- f . s-w.2c� •,v $fo kR y 4044-4A w4 `t`��.1b ASSESSORS PARCEL NO: ' 15 2-1-2_ 1 a-53 LEGAL DESCRIPTION: Bnildfng owioer ; .--;_ pilitia#61 _ - _ Name:-jr411--`t'Q4- k\. wQt[ Name: lJ� �S� ?'lYc�h f `'�! t' Address: V2-9,2-5- .s _`M./ZO s_- Address: q_oQC i 2 L 4vc City: k tz 1 State: [Art G Zip:G7h4, City3ak L ME/ State: Zip:��2 Phone: Fax: "" Phone: Fax: � j7.6- vg6� Q - d( Contractor Li /Noo: R GC{4`A Exp Date: { +:2 .3! -Y.:176 -'T s —,:_ S i/C�rc\� ` (V VA-0 ContaCtperson t,.E"- „? ,pr, uilft - _ ,. ... City Business Lic.No: • Name: ' /10 t LAJ Phone: zrZ.A - 086 S-- Describe the scope of work in detail: Cost of Project: $ 2'� d O oc., **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK; DIMENSIONS, #OF STORIES: TOTAL HABITABLE SPACE: MAIN FLOOR TO S 2 "FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE FTG: t AREA: FINISHED BASEMEN GARAG SQ. FTG: DECK/COV. PATIO SQ. FTG: 30%SLOPES ON _ SQ. FTG: 1\5 2- - PROPETY: #OF BEDROOMS: CONSTRUCT ON TYPE: HEAT SOURCE: CSEWER R SEPTIC? l The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted,and subsequently approved before this application can be processed. Signature ! '20t/(e---1/\)---- N Date I3bia Ji 2__ Method of Payment: 0 Cash Check ❑ Mastercard ___ 0`VISA Bankcard#: Expires:•}j C t 131 a/�/I�N#. Authorized Signature: `�r' ,.-N, , REVISED 8.25,2005 I L. "ti V.E OCT 2 2 2012 1 CSv PErr RM1 T .ti ,�-r- I SPOKANE POST FRAME,.C. JOB NAME �,1y2 LL 9P41- 14-kit 6 Y Engineered Pole Buildings PHONE It 1. l-k - 0-'11--19----2- - (s t shops ROLFE WILL ADDRESS 1 Zc(25— Z 3 L 'V12O k'J`.- garages Owner p l q �j storage buildings • ` Q��� V 4\A.' u - f 2 "" cabins 509-926-0865 • Fax 509-924-5161 LEGAL DESCRI PT ION �' kits-cost plus or 1-866-926-0865 _ ekr`C�L *" LI 5 ��2 — 1 S3 7001 E.2nd Ave Visit us at Spokane,WA 99212 www.spokanepostframe.com R-i4it__ p 1,L7ti ) . • Site Plan 5# 7//// / / A Pgoc ED rif • .. / / / 3Y r:;: 0: North \ l (100. ,,� !. a-- 1 • Show streets/alley - r' 4 Show septic/sewer/dralnfleid Show existing buildings Show proposed building • FX lSY/A/ Show setbacks- front, rear, sides. p,,JcC Show lot size V XlS1 vii s Pe1, INS 6'i4Ot 1 ZONING CRITERIA - SPOKANE Alva + (74 _ . C If closer than 5'to property line -need firewall and parapet Out of rear 30'and closer than 5' need waiver from neighbor /,,.s 5 Cari t cover more than 50%of rear 25' C , Corner lot -building must be 20'from property line . 50'minimum setback from front property line GS el-VVIA) 11 t \ Less than 8' from residence-need firewall 1 V'�-V \l Maximum square footage- 10%of lot area(Must be less than 3,000 sa ft.) Play not subdivide lot so that building Is more than 10%of residual lot area al """ "r' rEPT. APPROVED If closer than 5'to property line -need firewall 10' from septic/drainfield Less than 6' from residence -need firewall / Ullf,RAL SETBACKS ARE SHOWN BELOW. WILL NEED TO CHECK CODE BOOK AND KNOW WHAT ZONING YOU'RE IN TO BE SURE. MAXIMUM BUILDING SIZE ALSO CHANGES WITH DIFFERENT ZONING. /Q/2 2// ' __-- 5'minimum side yard setback 5 minimum rear yard setback Minimum front and side street setback -25'from property line or 55'from center of road-whichever Is greater I Project #_ :/ 1 • • OL AFD Residential Driveway ���, OCT 2 2 2Si2 PAVING WAIVER Spokane Valley k CSV PERr:1 i T CE Community Development— Planning Division 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 u3 'Y r j _ , F", 'I 509.720.5026 ♦ Fax: 509.688.0037• ptanning®spokanevaltev.org Spokane Valley Municipal Code(SVMC)Section 19.40.020.B; "All residential driveway and off-street parking areas shall be paved with asphalt,Portland cement,grasscrete,paver blocks or other equivalent hard surface material". A paving waiver can only be granted if the structure you are proposing is not going to require a driveway for daily use. PART I— OWNER INFORMATION OWNER NAME: DA-P-12--'i—LL "\' �t eac_ PARCEL#: Lt`J 9.-1-2 [,5 3-3 ADDRESS: ‘7_91,14--l,14' c. ,S(-A.421, A-Q.&L` CrrY: 1VArt L \j'Pc STATE: WI---- ZIP: ii 2_th PHONE: FAX: CELL: EMAIL: PART II —DETAILS OF PAVING WAIVER 1. Do you have an existing garage for parking daily use vehicles? YES C NO 2. Is the proposed detached structure used for storage only? YES ❑ NO 3. Do you plan on using the detached structure to park vehicles? ❑ YES Q110 If yes, then what type of vehicles? 4. Do you plan to conduct a business from proposed detached structure? ❑ YES NO If so, what is the nature of your business? PART III —AUTHORIZATION I,(PRINT NAME) owner, hereby confirm that the information provided on this form is true and correct. I acknowledge that any change in the foregoing conditions, could require the City to impose paving requirements. I further agree to report any change in these conditions to the Sp9ane Valle <Community Development Department, Planning Division, within 30 days. D/12_ VZ-- Owner ZOwner Signature Date PART IV — DECISION STAFF HAS REVIEWED THE PROPOSED PAVING WAIVER ON BEHALF OF THE COMMUNITY DEVELOPMENT DIRECTOR AND FIND THE REQUEST IS GRANTED AT k SW /, y- E hlrl9 7 1/`e. , SAID ADDRESS FOR PERMIT#: ) /I/ C 4 i61 L.moo /O/z z// Plannir g Division Staff Signature Date Created 6/27/11 Page 1 of 1 • I Target Date sheet For City Use Only Siökane Valley11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.720-5240 • Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application,we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date,we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete,accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date.Staff may contact you before the target date if the initial review is complete.By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete,your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3.Technical Compliance.Once an application is administratively complete,it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals,each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up.Information regarding fees and pre-construction meetings(if required)will be provided by the Permit Specialist at that time. CD-003 V-7/06-21-11 Page 1 of 1