2015, 05-20 Permit App: ROW-2015-0275 ROW 05-20-15; 10:02AM; # 3/ 4
Community Development Department
Permit Center (Staff Use Only)
11703 East Sprague Avenue, Suite B-3
Spokane Spokane Valley, 99206 PERMIT NUMBER:
�J Tel: (509) 688-00303 6
Valley Fax:Dermitcen 688-0037 PERMIT FEE:
41001.
RIGHT OF WAY (ROW1fERMIT APPLICATION
❑ APPROACH Erb PAVEMENT CUT (SEE BELOW) 0 SIDEWALK
❑ CURB & GUTTER ❑ WORK THROUGH MANHOLE ❑ OTHER
ROAD OBSTRUCTION 2 NO ❑ YES (if yes, complete the following)
• % of street or # lanes that will be obstructed:
• Length of time street will be obstructed:
c If work closes more than 50% of a local access street, or closes any portion of an arterial street,
then a TRAFFIC PLAN IS REQUIRED ❑ Pre-Approved TCP Proposed:
PRO3ECTADDRESS: /4/6O7 E (off` PARCEL NUMBER:
APPLICANT'S JOB #: LOCATE TICKET#
START DATE: ,54y14 j4 ANTICIPATED COMPLETION DATE: (Q,� //5
PROJECT DESCRXPTI DEPA/2 CA�/7-bre. ���VIC. LIN£ /
PROPERTY OR BUILDING OWNER INFORMATION (IF APPLICABLE)
NAME:
MAILING ADDRESS: CITY: STATE: YIP:
PHONE; FAX: CELL;
CONTRACTOR INFORMATION
NAME:VERA WATER&POWER
MAILING ADDRESS: PO Box 630 CITY: SPOKANE VALL STATE!WA XIP:99037
PHONE:(509)924-3800 FAX: (509)922-3929 CELL:
CONTRACTOR LICENSE NO.: EXPIRES: CITY BUSINESS LICENSE NO.:
BOND/INSURANCE CERTIFICATE# (per SVMC Title 10, Article 2):
CONTACT NAME:TODD HARMON PHONE: (509)924-3800
&Dirt-2O/,,'-_azr
Modified April 14, 2014 Page 1 of 2
C:\Users\tharmon.VERAWP\Documeat,5\Sookane Valley$QWPA.doc
Received Time May. 20. 2015 9: 59AM No. 1895
05-20-15; 10:02AM; ; # 4/ 4
•
**** /IF PAVEMENT CUT, COMPLETE THE FOLLOWING ****
NATURE OF WORK: Gas Electric Water CATV Communication Sewer Other
(circle one)
TYPE OF CUT/REPAIR:
(circle one) ' - Gravel Concrete Other
SIZE OF CUT /
(width) xjlength) (Q )( I L
STAFF TO COMPLETE:
ROAD TIER: _ PAVEMENT CUT POLICY APPLIES?
DISCLAIMER
The permitted verifies,acknowledges and agrees by their signature that: 1) If this permit Is for construction or on a dwelling,the dwelling Is/will
be served by potable water. 2)Ownership of this City of Spokane Valley permit Inures to the property owner. 3) The signatory Is the property
owner or has permission to represent the property owner In this transaction. 4) All construction Is to be done In full compliance with the City of
Spokane Valley Development code. Referenced codes are available for review at the City of Spokane Valley Permit Center, 5) The City of
Spokane Valley permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional
Information may be required to be submitted and subsequently approved before this application can be processed.
EXPIRATION
Right-of-way permits Issued between April 1°t and September 30th are valid for 30 days after the date of issuance, with a one-time 30-day
extension available. Right-of-way permits Issued between October 1st and March 31e are valid until the following April 30th.
Applicant Signature; - �, Date: -5A0:5
Method of payment: ❑ Cash 0 Check 0 Visa** ❑ Mastercard"
** If paying with credit card, the City will call for credit card Information when the permit is ready to be issued.
PLEASE FAX TO CITY OF SPOKANE VALLEY (509) 688-0037 UPON COMPLETION
Modified April 14,2014 Page 2 of 2
C:\Users\tharg.uds_ic
Valley ROWPA.doc
Received Time May. 20. 2015 9: 59AM No. 1895