Loading...
SP-1054-96 - 77 J. Paul Ramer & Associates, Inc. ~~~.T~~ ~-~~~~~~~~~;L Consul~ing ~Clvi! Engineers & Land Surii'eyors N. - 10115 Newport Highway, Mailing=Address: P.O. BOX 18779 DATE JOB.NO. Spohane.j Waahington 99208'0119 9lO Phone (509) 467-5261- o FAX 467-5262 AnEtvTfoN - _ ~AvE gE~e~r.o TO SPor4An1E Cov.'~tY ENC~~NEERS RE S/'p~-4 Pla4 sP.- 1054-- 9~ - W IOZ(o 89 0 A0IdAY SPv KA46 , WA S4: 9 q Zb o _ GENTLEMEN: WE ARE SENDING, YOU El Attached Cl :Stiop=drawings 0 Prints, XPlans ❑-Samples 0' Specifications 0 Copy of lette,c O .Change order 13 _ 1 COPIES'_ DATE ~ PAGES ~ DESCRIRTtON 1 YL;Ar- or :SP- .Io_S 4 - 940 fI tr •2 4- - : ~v.•3- SF0 i=.% i..`':.G U„T1 ,E,c;ultt EER THESE ARE..,TRANSMITfED-as , checked be.low: 'A For' approval; O For your,use , 0, As requested O For review-and comment ~ - REMARKS ~ COPY TO' SIGNED:: lf enclosures"are'rtot as`noted, klndly notfiy.us at orrce. (r REVIEW CONEMENT5 SPOKANE COUNTY DIVISION OF ENGiNEERING & ROADS 1026 W BROADWAY, SPOKANE WA 99260-0710 PAONE (509)451r3600 FAX (509)324-3478 SUBMITTAL 1 REVIEWER: Ed Parrv PROJECT SP1054 DATE: 11 Julv 96 PROJECT NAME: Herlin/Price Short Plat N.B.: Since this project is governed by the edition of the Spokane County Standards for Road and Sewer Construction (the "Standards", adopted 2 May 95 , with an effective date of 15 May 95), these comments are general in nature, and do not represent a listing of all items which may not be in compliance with the Standards. The responsibility for ensuring compliance with the Standards lies solely with the Sponsor's Design Engineer. ALL DISCREPtiNCIES MUST BE ADDRESSED AND RESOLVED PRIOR TO PLAN ACCEPTANCE PROJECT DESIGN ~ Driveway elevations should be provided ORI&1EPJ4,4 i5 MaT cor15TRvcTEO OR- DE3i~,r.lEO. SfE NoTE 01"J PcA13 (,51!. Drainage Report: n.b Ditch sizing calcs were not included in this submittal The Bowstring calcs indicate that drywells are needed; if a retention pond concept is intended, then the County Engineer's approval of a design deviation request is needed. RetentioA ponds are typically based on a 100-year storm event superimposed over an annual water cycle 'N'k Basin Map does not have elevations or contours to support basin limits indJcated AIQfA iS eECATdvE°Lf FtR? ~ 5 LoPI Ave, AIOR?eI, sfE nMR"E F0R- EXP[A~AT'~'► OF lgAS#~ LJMtTS ~.'he certi~cation statement required by the Standards was not provided on the plans or calcs (W Need to provide Fire District approval f2) Copy of ingress/egress easement is needed Other: ~a).The Statement of Agreement for Construction Services needs to be notarized, per the format provided at the pre-design conference MAILING ADDRESS: OFFtCE LOCATION. P.U. BOX 18779 N IOIIS NEW('ORT Hbti'1' 5('OKANE bVASHINGTON 99208 SPOKAiVE. tNASHINGTON 99218 I'HONE (5091 gb7•S26f FAX t5091467-5' " )b? . c~G~GGt~ U' , ~'LC. CONSl1LTWG CIVIL ENGINEEKS & LAND SURVEYORS Ih'ASHINGTON • IDAHO Project No. 96142 June 20, 1996 DRAINAGE STUDY for Short Plat N0. SP-1054-95 Portion of NE1/4 of Section 19, T25N, R45E, W.M. Spokane County, Washington ~~v~ ~Lr~ • 4 ~ ~~~oF W^SNitic cS'cC~ ~ °z c 0023636 ~n ~ ~s1s ~GfS?Ea0 NAL ~ G•~7• 9G EXPIRES 01/22197 ~ - Prepared f or : Jim Herlin and Dorothy Price E. 11920 Mansfield, No. 62 Spokane, WA 99206 (509) 924-6035 _ rui+t(;:AL PUBl.lC DO(:UMEMT $PO(ANE CiIJ;VTY ENGINEER'S 4FFICE I OR ~ r.. PRO~►'ECT ~c q /o 51~MiTTAL 0 Z~ . ~ r , • • _ ,ar ~ sF ! i~ ' 1 • ~ s! ':i b . a • ~ The design improvements shown in this set of plans and calculations conform to the applicable editions of the Spokane County Standards for Road and Sewer Construction and the Spokane County guidelines for Stormwater Managements. All design deviation have been approved by the Spoka.ne County Engineer. I approve these plans for construction. ~ - ~ _ S1 rE ~ o . - _ ~ ~ ~oou • ~ ~ . Q ~ w ~ ~ Q s • • - ~ • ` ~ - • • ~`i.~ i • • • - • t ~ ~ - , , ~ ! ~ . • r'' . . • 2045 • ~ ; ~ - /ic o n nSPRAGUE • ~ ~ ~ _ 1 ~0 a . . • . . . . , . • ~ ~ ` ~ . • ~ O Q ~ ~ n a 1 , i • - ~ Traler ~ ~ • ' . . ~ . 0 2051 . . ~ . . Park - . . • . . . . . ~ • ~ ' ~ ,;106e ~ . . ~ ~ ~ • . : ' 13 o . . J~1' ~ ' ~ \ • • . ' • ~°-G1 2081 5e~ D isposa G ravel - ~ , _ ~ r j VT/ ~ ' . : - - . _ . , . ~ ~ • ~ ~ . X Z ~ f~ • ~ \ ' B M ~300 208 ~ - ~ ` . r ' ~ i. o-~ ~ IICINIff Al" _ ~ _ ~ " , u`+ , ,:~1. i~,t 3•i~ ✓y, .1 'Y ~~j ~ ` ~ ` ~ . ~ ! ~ S ~N ~ ' ' • ~ 'i ' ~ ;Ytt ~ ~ • ~ ~1 . 0C ~ ~ ~ a' ' ~ . d ' • . ~ • . ~ ~ o m a IYZ t 'i!a i NOry ~~S 1~ ~ i~ 0 t ~'~t t ~ ~s1 t ~ " ~ t! ~ ~y ~o~ ~ ~ ~ ~ ~ ♦ i ' ~ ^ . Y'.~ ~ ~ ' 1 ~ ~ . F { + r~ r ~ , ~ . t 3' ~ • f~~ , ~ ~ ~ 1 V 7 ~ ~!o; r ~t • r + i p. ~ ~ ~ ~~,..~y ~ ~ ~ y • ~ ~ , ~ ,1 • • .1 ~ `4 ~ ~ r b.• , hb~'~ '~'a`l'~ 1 1 ~ • ~e r ,~y ~ ` ~ 1, ~ t ; o~~ ~ ~ ~ •1 ~ ~ . ~ . q"'' ~ ~ ~ ~y~, ~ ~ ° * a~• 1 ~ ~ • ~4` 14,14 . ~ • i , 6~,. '~i.., n~;- ' g . ~ i ~ ~ ~~•~i , ` , ~y 1~ u~ ` 'u ;y> ~ 1 ~ , .i : a ~y ~ ~ ~ f• • 19 ~7 ~'1~ t~ ~~~~Q 'a °.Y 1 fi j~ S~ j,` ~r ' 4° ~ y~ l~ d~ ~ ~ . I ~ • ~ , t f ~ 1 ~ ' ~ ~ + 'p- ~V ( ~ ~ e~~'f "~°h ' $'jf ~r~ 7 e~~\ " ,;,~a ~ 1. ' ~'i. _ 1 ~A,,~;,~ t0 ~ ~ ~ 1 Luq~,~i a S~e t ~1 , , y , ~i` t ~ r ~ r ~ ~ 1 ~ 'jfl ` ~ 'i ~ P~ , + . 'tt~ .n, . • 't r ~ ~ ~ ~ ~ a ~ 'a~,~,~~ ~ ~ ~ `i , a' f ~ ~ ~ ; x , ~ - +y ~ ~ ~ ~ Q ~ e•l ~i C', ' 4'~ I ~ F ~`~1 8~ 'k ~ + ~ i aS ~ ► ~ ~ 1 , ! ■ 1 PROJECT AND SITE DESCRIPTION Short Plat No. SP-1054-95 is a 3 lot residential short plat situated on approximately 1.00 acre in central Spokane County. The site is situated south of and adjacent to Sprague Road, and approximately 160 feet east of Moen Street in the Northeast quarter of Section 19, Township 25 North, Range 45 East, W.M., Spokane County, Washington. The property is surrounded by developed subdivisions. The proposed site is relatively flat, sloping slightly to the north. The slopes on the site run between 0% and 3$. The soil in this area is mainly comprised of Garrison gravelly loam (GgA). This soil is excessively well drained and has moderately rapid permeability. Surface run-off is slow and the hazard of erosion is slight. _ 1 - : . METHOD OF MANAGEMENT The stormwater analysis criteria used for this site considered the following factors: 1. The lots in this plat are served by a private driveway serving 3 lots or less. 2. The site for this project does lie within the Aquifer Sensitive Area, therefore stormwater treatment swales and drywells will be used. 3. The site for this project lies inside the PM-10 zone as established by the Spokane County Air Pollution Control, Authority (SCAPCA), therefore the private driveway will be paved with asphalt concrete. 4. The site is relatively flat with slopes between 0$ and 31 and have been field verified by site inspection by an engineer in our office. 5. Stormwater will consist of mainly on-site due to the topography and development of the area. The property is surrounded by developed subdivisions. Calculations were made to determine a relationship between existing conditions and the proposed developed conditions. All factors used in determining the numbers for the developed conditions are very conservative, allowing for the maximum developed condition to be calculated. A pre-developed "Q" was calculated to be 0.60 cfs, and the developed "Q" calculated to be 0.71, for an increase of 0.11 cfs, or 18%. By treating the run-off from the private road, 0.37 cfs of the overall basin will be contained and disposed of and the developed run-off will be less than the existing. ~ • i • ~ ~ ~ ; 0 0~ ~ O ' " • • --ZO3 ~ • o . • ' - ' . . _ ':~Q .~1 g j~ ~ ' ' Q ~O ,,p_-'~~~ • ~ ~y ~11 : . C w ~ ~ _ • ' • r • ~ ~ ~ ' • • • " ; : ,_yr`~ ~"'s---~~ s w~ ~ . ~ • • , s ~ y • O t~ ~ ~ • • O ~ O : ~ ~ 1 ~ , ~ ~ . ~ • ~ . O ~ • ~ ~ ~ • ' • ~ ~.•►s' a~ ~ ,s • • I s . . . ~ . • r . ~ _ • . .t~' ~ ~ i • ty ~ ~ fl • ~ ~ ~ # ~ ~ s ~ • ~ ~ ~ • ' - ~ ' ~ s s s ~ * , ~ s •~i ~ ' ~ * M ~ • ' • • ~ - - • ~s (I ~ ~i . ~ / C • • + . . Q ~ , 203? o 00 . ~ o ~ ~ a 0 , . ~ , Q _ • ~ C. ~ ' • • . ~ • . ~ ~ 0 . ~ s e ~ . ,f ~ • • ~ ~ ~Q M ~ s s ~ • • ~ P w ~ O M ♦ ~ ~ ~ s • ~ • r *~O,f~../"'~~' w r~+•'~ a~ t _ • n . ~ ~ . : ~ ~~~s ■ , ` ~ s • ~ • ~ ~ A i • ~ • M r,~~~i"• ~ o I ~ + . ' • ~ f • . • ~ •~s ~ -~1~ ' ♦ • • • ~ . - _ ~ • '~'f ~ - . ~`r=~ oo • , • s . s ~ a o ~ o ■ • •o • SC, . . . . - ~ ~ a + ~ ~1► a , a ~ ~ ~ • ~ ~ ~ ~ . . ~ ~ ~ f ~ • ~ . We 1 ~ 20,4 S ~ O ` , . ~ • • ~ . * ~ L.. . ~ro~ v~ ' • . S F' RA'~ . .,030 ; ~ . ° s• 1.. • i ~ ° ~~a . • ~ ss ~~i ~i i i w' 006 i • ~ , • ~ ~ n • ~ ~ ~ • ~ . ' ' ' J~,~ - , • • ` ~ c ~ • ~ r ri • o • , Q ~ ~ * ~ Q ~ 5 ~-rE t : . • a ~ 1f . ~ . . . ~ ~ 'A . J • . 2051 o _ o . . ~F a, s~ ' 1~ ► ~ o . : T -et t~ 6 za~ P ~ ~ • t ~ ' • ~ - . • ~ •j u p 5 ~ o ~ " ~ ~ ~ : ~o~ : ~ • ~ O ` _ _ ' `~..~'~.,~j • sl✓'~ • - r _ i n ~ ~ ~ ~ ~ ti j7 ~ ~ - . ~ ..,,p ~ 2081 f o- ~ i/ ^ ~ . O • / ~ t • ~ L lio /I it G ravel iSP°sa ID ~ ~-it~` ~ . - = : ~r `--4- ; j • • ~ ~ • s /f~ 1/ y \ ('wJ1 ' ; ~ ~ , i w . ~r ~ ~ • ~A~ ` I` ~ r~ - ~ \ x.2 .i~ ' , ~ 1~ ~ ~ _ ~ _ ► ~ w . , u ~ ~ ~ ' - ~ { ~ I f ~ w I"~ $ ~ A\~ Qa 3 p Il , ' _ - ~ . i, ' - . ? 3 00 Zo---. , r ' ~ / ~;~'I i / . ~ 4,~'~~ • "L APA-Y~ . ~ ~ / ~ ~{e~^ ~ ~ ~ ~ ~ ' ~ . ~ + ~ • yr~,,,.~J , !IV . , , ` ~ ♦ ' ,e` S 4 } 1 5~~2 ~ ,~.s _ , ' • ; , ~ • ~~r'' ~ ' - " 'Y ' , ~ ~ ~S ~ M ~ _ . ► r/ r ~i J . 4 ~ «i~.i'~i• ) ~ A• -.:.a . t"'i. _ . . - ."i+. ,Y+~;~ ; ° sr - ' .c - < 3i.~, j~ •J'~" ~ c~~.,..:'. 'j'~~~.~r~ ~~-r~ ~~'.SlS~ ` ...~f 3 ~ ~ _ - a ~,jt ~ e!ry' -h~~N•, "T '~t~~, fj~ ~ a• • ~ . • d• _ Y~9ti . ;,rr. - i,' w. • . .1 ' . . tia' - IJ' • si~ • • .r - MV`~~,,i~ f-, ....~~;i. r `t`'1w.d'~i!'"M~'r • ~ : v t . ~ / ~ ~ ~ • y. • '!~r.,~, `„r ; ; ~ . r ~ ' C, • ~ ~ • \ • fi~'~~'~5l•~'E~ _1• , • r~~► • • •Lt. , • ~i ~r, ~ = , ' ; ~j~;r ' ~ ~ ~V . • ` : • ~ ~ W'Y ~ ' ' i . O",~ K . i ~ y,~j" ..s ~ ~ ~ , • • ~ ~ +h r ~ o • . . ~ ! ~ r` ' • ,i~~ ~ ~ ~ ~ A 1 ~ . . ~ ~ ~ sl. ~ ' ti t i ~ ~ • , r •~„i~ • ~1+~G, ~ ~ ° a•~ ~+t p KQi~,;".~~~ Ja~C°zk~1Lr- J* r --x-. . %fs+~ a,. ~ ' ~ ~ . ,y,, • ~ • ~ . . ° ~ ~ • h " • •f.~:, _~r' t i - ; . X • , .''f~ " , ;t_ ~ ~ T - , • `t , , ~ .~r~ __(ir`•• ~y. f.. l~, - -3, ~r. ta • J• . ~l+.t. _ ° - - ~ p . ~ ~~r - •t iop •~_~r,!t / . ' ; • .,~i. r ~ ~ rr. • a,4 Y _ ' pr ~ 1!• . ~ R' ' r ~ - - 4~. ' ` ~v"~ . :;ti ^ ' '~7 s ~ ~ { e . ~ ~ q 3_ , • 't' o• ' ' ~ , v',gf~ i - . A-' ~ w' _ . . . ~ , ~~►~t `l • • 1 ± . ' _ . ,q• ~~3 ~ ` ~ ° : . ~ ~V •Y ~ ' 1 / • • ~ I+ I . i ~ , r .1~ . • ` 1 • ~ 3'~' ' L ~ ^ . .ifi,'`~.~+~; • ~ , C •~IS"~~ ~ ~•L~ a~ _ ~Yt~~~=~~ ~•s ~ • 1+ ~ ' ' • ~ _ Mr NV'.. ' • jti ~ w ' ` f , ~ ~ dy ~ ♦ ~~it '4:. ~ ' ~ 1 .y., . . ~ a- i " ~ _ , • ' ' ~~~~Ys_ ~ '~,v .aA('~C.~ i.i A ~ ..w.~. ;~i:'. .s~`~=' ~ • t '•1° ~ ~ 1K ~ ir ~ ~ ~ „ .fi';Z ° s . • ~ o,n" + ' i ~ ` ~ ~ ~ ~ . , N • r:~ • } : e ' t~~ • S` t r~ ~L~e-M ~ ~ , ' ~ i " r ' ~ _ ~~~~iN' ' ':j ~ ~a C:.`•~, ..-i~ , ~ , r_ ~ ~ o~~J ~ " _ . . . • ~ x S'}~► : ..r,r f~p: B►'~. : . ► ~ k~r 'a~• _ t ` •p"' i~►, ;i j. . ~ - i . ,,4 _ ~Lr-.., s r . _ t -ti~-`,p ~`S• ,d~ :~'7,~ p a `f` - ^siVi'~jl J~= " ~ u~ r.M r. a .-'t.~~-,', , ~ -'~~:,~W ' •rw /r' ~ ~o ~ • ` i • ,~~,~'±17~ ` r.~ • :d ` ~ s •~N,j~~~y # . ~~{~e~py f. ~ ~ ~S• t ~ ~ ~ ~..r' ~ . w~,t' ~ ~ "s ~ ~ ~ ~ ,i~ , ~,!~l•: •w 7 - . ~isai-~ • • ~ ~ i ~ `I . ` ' .G'~ {'1~:.~.~~. yw.~.~~ ~ ~ • . ~ ~ ~ } O t{ T. 4~ . ~ e ~ . . Ti, r a ~1 . ^ . i , 'j ..y ' • • o `1 ~r . • 1 ~h~ _ ` . ~ ~ . . • ~ N, • ^.7' G. ,Yj~r•~ ~ • '~r ..Ai- :~r'~t • ~'"Y ~a n . ~r~I . ! • ♦Y~i ~1~ yi . ' ~ ~ ♦ i! 1'• ' 71 ' ~ ~ ' ~ ~ ~d :'ti ~L~~ , s~ ~Mai': ~ 'M,. • ~ :r~, , ~ ' " ` s• S, i1-~ ~ Q ~ ~ , - ' - ~ i'~~!y.~ :J a . : -'.`r' q. 3• . ~4. f : ~ ~ p'"a 'l •Y f o' •#i'K ~ .g^ v • ' ^ 1"'~ ~ ~O-~ ~'b;• :a3 i-~Y ;M ~a... ~ . . C 1,. ~-N, S• ' ~ .~i. : ~y'~ •~j~. ~ ~ ~i' ~ t O ' .wss- _ ' .t, t ^ ~K,,•' ~ •r ' i Xv* •y~,~ ~1 . ~ . , V • _ ' ' • ~ • " ~~4 + 4~ ~ } • W A_ ~ ~ ~ V~~ 1 ~ I~' e ~/w' ~'y ~ ? ~ ` '~y. '(h~17 4 ,S. ~ • • K Tb~,t~' ,ti~;``*. t~ ~ .,s - . _ ~ ~r , „Y:~' ~'a't~•~'~,~~ '..n~,~:~•° -'4. f;y.. ~ , _ :c A~ y'~ j ti -~r' ,1,! ~ . . ..~.'~a-~~~.M- ~ .Ctl' ° , f y aJ~- , ~ ' ~ • •y~,~ -y . . '7 ~ 11• f ; ` ' ` 'A •~14~,~ r Y. _ ~r:~ ~ . ' ~ • Ef 1I^T• ~y ~ ,J. ~Y , -a~~ ! 1~• :i _ . r 4H ~ - , ~~T) t~' c Y ` ..-a.3'~~{' , a ..'i` i;,i ~ ; - " • ~ ~K~'. •e' , •ti f ...,i{ i';.~.. •1T• . - ~ ~ ' • ~yt • 4W. 't:. ~ . + ~ • l ~ ~ ~ ~ •w~ • ` • ~ ,+i~ ~~r P~, ~ _ , ~t _ o~~~~~ : , . . •c - ~ _ ' ~ : ^ di 5a~ . ' i• ~ J ~ , ; • , _ . ; . d ~ ' ~ . ` ,~~e~ ~ r • - s . ' . . ~ • , , . . ~ • . _ : ra,~, ~ ~ • •,~.r... ~'K,+, " .t . ~ ; w. r~ , . ~ , r , _ ~ ~ i.,}- " : ~ j , ~ ~ , ' - : . ; , ` ~ ' 4 a i ` •v • ~~i•' ~ ,rT~•: •~t.•+ ' -.:i. at ^ _ , , ~ " • ~ , ,1 y. ' • . _ .v~~' •i,. S1►~ R ~ ~ ` o- 11I . . r _ ° ~ • ..:.r w ti~: ~ . ~ ' . 1 _ _ - ~ ~r, , ~ . ~ r . ~cs , f~ ^ ' • - ' ! . y -9f i7~~ a > ~ 7 ~;'~R .''11~ ~ ` ~ _ _S~y _ ~1' •~.t~ ~ ~ M~ ~ -y ~r ~ ~1 ' i 1 t.. ~t•- • ~ ~'i..t ~ ~ ~ 1 . « ~1' - . ` . 1 ~ . ~ . a ~ 1 1•' • J I IL ~ 7 5;,,: ~ ~ ' 1 . ~ . • . ~ • ~ • ••.ti'~ P . • .4 1" . ~ ~K . - . ~ } e7 . . . 1• _ , f . ~ ? ^ . i~ -t" ~ • . • 's'- T . ~ . s .,4.: ~y~ , '7Ly;~. . . t , . xi- . ~ • . .M, `~t• 9.h:• C~,- . .-a • ff r ,I o.. ' • r ; ~ o.•~ ~ K .~w• ~ ~ . ~ y • .Y~ `1• } whK~ !i " :Y°,a'g~.~•i~~~ ~ •~E ` ~ e ~ ~ ~ / M ~fts ' ^ ":i-- a. ` + ~ ~ 1~ 7 : • tr: ~ ~':"'t'~ ~1~►, ~ * r i ~ Y .lr~~ :~l...- : i-1', . ~J~ a. -t_ • ` - ~Y ~ ~ ~ ~ ~ $ ~ i slt~.~„ ~ ~rr .f~~ - ~ • ' ,•~i~,.'~,;~\ . ~ ~ ,e+~ ~ ti~ ~M ✓1 G ~ ~ v... ~y . ~ ~ ~ a~} ~ i~ . j~~ ..i~~'"t ` ~R'~. i . _ ` -~.t- , ~ ~.6':'~ . f ~ "Y ~ . ~ ' ~ ' • . L• t' Yf~y ~-}ta v ~C ~ ~ ~ ~ . ~ f ~ ~ ~ ~ ~C 6 , • Rf- • ~ r~~ ~ 9.~ ~ ' ~yd- ~ ' '4 . ; ~ • ~ ' ' " 9 ~ , f ~a!~7°!'~ , • i?•" O r i ~ ~ .~M~i ,~3 ~ S' '.s •ti ~ ~ 7 w r j . ~ :'J►' ~''v ~.~,./r`T* ir+~^r' « w~ ~ „ ~ J , . ...1~ . a ~e4~ / ;r 1 ~4 ~ ~ ~i<~S: t:R. ~~,'3 ' l'f- q4•«~q*...~ ~o • S •y, r47 _ • ; ° . • , I ~ +1~. 1 i ~ _ ~ , 4S~Y_~r~ .-r"~~~~•~ • : i ~ • _ _ ~ , ~ ~?.~►o: • r ~ ........-~r e, ~ • • , ` a•l~'~ ~.~~t f ' '~f. ~ y .~v .~T , .L r ~ .r r • r~j3 ~ ` a `~i. ~ . ry . yj 'ti.t . ~!~-..d w.- , ' , _ ~~3~~ifi~'~~~~~~"~'~'~~ ?:d .'r ri~•~ nWv 30WSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 96142 )ETENTION HASIN DESIGN BASIN: Existing DESIGNER: G. MILLER NUMHER OF DRYWELLS PROPOSED DATE: 26-Jun-96 0 Single (type A) 0 Double (type B) Total Area (calc.) 1.00 (see following sheet) Time of Conc. (calc.) 11.27 (see following sheet) Composite "C" (calc.) 0.28 (see following sheet) Time of Conc. (min) 11.27 Area (Acres) 1 C' Factor 0-28 Impervious Area ( sq . f t.) 0 Volume Provided 208: 320 storm: 480 Outfl*w ( cfs ) 0.28 Area C" Factor TIME OF CONCENTRATION (minutes) Tc (overland) Tc (gutter) Ct = 0.15 L2 = 0 Z1 = 1 L1( A) = 380 Z2 = 50 N(A) = 0.4 B = 0 S(A) - 0.0129 n = 0.016 . S = 0.008 IC ( A ) - 11.-27 d = 0.14 . L1(B) = 0 Tc (gu) = 0.00 N(g) _ 0.4 Tc(A+B) = 11.27 S(8) = 0.15 _ TC(tot.) = 11.27 Tc (B) = 0.0 Intensity 2.12 Areas "C" A*C - A = • 0.255 Wp ~ . 5.1424 A 0.95 0.25 0.2373 R= 0.0496 s 0.02 0.90 0.0216 v= 1.12 c 0.03 0.90 0.0243 Tc(gu) = 0.00 D 0.00 0.00 0.0000 Qtest) = 0•29 E 0.00 0.00 0.0000 _ 0.00 0.00 0.0000 Holding = 0.00_ • - 0.00 0.00 0.0000 Total A Comp "C" ' 1.00 0.28 Q=C*I*A= 0.60 Q(est.) = 0.00 _o - - 30WSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 96142 )ETENTION BASIN DESIGN BASIN: Developed DESIGNER: G. MILLER NUMBER OF DRYWELLS PROPOSED DATE: 26-Jun-96 0 Single (type A) 0 Double (type B) Total Area (calc.) 1.00 (see following sheet) Time of Conc. (calc.) 11.27 (see following sheet) Composite "C" (calc.) 0.33 (see following sheet) Time of Conc. (min) 11.27 Area (Acres) 1.001 C' Factor 0.33 Impervious Area (sq. ft.) 0 Volume Provided 208: 320 storm: 480 Outflow ( cfs ) 0 Area * C" Factor 0.33 ;IME OF CONCENTRATION (minutes) Tc (overland) Tc (gutter) Ct = 0.15 L2 = 0 Z1 = 1 L1(A) = 380 Z2 = 50 N(A) = 0.4 B = 0 S(A) = 0.0129 n = 0.016 - s = 0.008 rc ( A:) = 11.27 d = 0.10 Ll(H) = 0 Tc (gu) = 0.00 N(B) = 0.4 TC(A+H) = 11.27 S(B) = 0.15 Tc ( tot . ) = 11.27 ' Tc (H) = 0.0 Intensity 2.12 Areas "C" A*C A = 0.255 _ WP = 5.1424 A 0.22 0.25 0.0553 ` R = 0_0496 B 0.09 0.90 0.0783 V= 1.12 C 0.13 0.90 0.1188 Tc(gu) = 0.00 D. 0.04 0.75 0.0293 Q(est) = 0.29 E 0.52 0.10 0.0522 - 0.00 0.00 0.0000 Holding = 0.00 - ' '0.00 0.00 0.0000 ' Total A Comp "C" 1.00 0.33 Q=C*I*A= 0.71 Q(est.) = 0.00 . L'J - OWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 96142 ETENTION BASIN DESIGN HASIN: Driveway DESIGNER: G. MZLLER NUMBER OF DRYWELLS PROPOSED DATE: 17-Ju1-96 1 Single (type A) 0 Double (type B) Total Area (calc.) 0.13 (see following sheet) Time of Conc. (calc.) 5.00 (see following sheet) Composite "C" (calc.) 0.90 (see following sheet) Time of Conc. (min) 5.00 Area (Acres) 0.13 C' Factor 0.90 Impervious Area (sq. ft.) 4736 Volume Provided 208: 200 storm: 150 Outf low ( cf s) 0.3 Area * C" Factor 0.12 #1 #2 #3 #4 #5 #6 #7 Time Time Intensity Q dev. V in V out Storage Inc. Inc. (min.) (sec.) (in./hr.) (cfs) (cu. ft.) (cu. ft.) (cu. ft.) (#1*60) (A*C*#3) (Outf.*#2) (#5-#6) 5.00 300.00 3.18 0.37 150 90.00 60 5 300 3.18 0.37 150 90 60 10 600 2.24 0.26 184 180 - 4 15 900 1.77 0.21 208 270 °-62 20 1200 1.45 0.17 221 360 -139 25 1500 1.21 0.14 227 450 -223 30 1800 1.04 0.12 231 540 -309 35 2100 0.91 0.11 234 630 -396 40 2400 0.82 0.110 240 720 -460 45 2700 0.74 0.09 243 810 -567 50 3000 0.68 0.06 247 900 -653 55 3300 0.64 0.07 255 990 -735 60 3600 0.61 _ 0.07 264 1080 -816 65 3900 0.60' 0.07 281 1170 -889 70 4200 0.58 4.07 292 1260 -968 75 4500 0.56 0.07 302 1350 -1048 , 80 4800 0.53 0.06 304 1440 -1136 85 5100 0.52 0:06 316 1530 --1214 90 5400 0.50 0.06 322 1620 •-1296 ' 95 5700 0.49 0.06 333 1710 -1377 100 6000 0.48 0.06 343 1800 -1457 o )RAINAGE POAfD CALCULATIONS Required grassy swale pond storage volume ~ Impervious Area x.5 in./ 12 in./ft. = 197 cu. ft. provided: 200 cu. ft. DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORM Maximum storage required by Howstring= 60 cu. ft. - provided: 150 cu. ft. Depth of storage swale = 0.75 ft Number and type of Drywells Required = 1 Single 0 Double TIME OF CONCENTRATION (minutes) Tc (overland) Tc (gutter) Ct = 0.15 L2 = 322 . Z1 = 2 L1(A) = 0 Z2 = 3 N(A) = 0.4 B = 0 S(A) - 0.0129 n = 0.03 s = 0.0129 Tc (A) = 0.00 d = 0.31 1(8) = 0 Tc (gu) = 3.48 ° ~.(B) = 0.4 TC(A+8) = 0.00 S(B) = 0.15 • Tc(tot.) = 5.00 Tc (8) ~ 0.0 Intensity 3.18 Areas A*C A = 0.24025 wp = 1.6735 A 0.00 0.00 0.0000 R= 0.1436 8 0.00 0.00 010000 V= 1.54 C 0:13 0.90 0.1170 Tc(gu) = 3•48 D 0.00 . 0.00 0.0000 Q(est) = 0.37 E 0.00 0.00 0.0000 0.00 0.00 0.0000 Holding =11.47 0.00 0.00 0.0000 - Total A Comp "C" 0.13 0.90 Q=C*I*A= 0.37 Q(est.) = 0.37 _ : _ . _ Triangular Channel Analysis & Design - Open Channel - Uni f orm f low Worksheet Name: SP-1054 HERLIN\PRICE Comment: Driveway Ditch Calculations Solve For Depth Given Input Data: Left Side Slope.. 2.00:1 (H:V) Right Side Slope. 3.00:1 (H:V) Manning's n...... 0.030 . Channel Slope.... 0.0129 ft/ft Discharge........ 0.37 cfs Computed Results: Depth............ 0.31 ft Velocity......... 1.54 fps Flow Area........ 0.24 sf Flow Top Width... 1.55 ft Wetted Perimeter. 1.67 ft Critical Depth... 0.27 ft Critical Slope... 0.0264 ft/ft Froude Number.... 0.69 (flow is Subcritical) Open Channel Flow Module, Version 3.43 (c) 1991 Haestad Methods, Inc. * 37 Hrookside Rd * Waterbury, Ct 06708 - , ~ T YPE 4 METAL FRAME 8 GRA TE . ~ ~ MORTAR IN PLACE / ~ GRASSED SWALE ~ / u . ~l ! ~ ~ ~ ~ • v/A r4" AI3z MORTARED I ADJUSTMENT i,~ 2'-0" R/NGS RETE SLAe 2% 2 / TE 21 ~ ' a, • , _ ' ' • 4-_ ,'a', , . , ` o o ; : ~ ~v ' o~ u - Iti t I 'e~ r~, .~•I E ~ 1 t } { ~ ~ u~~t~ T~~ ~ , ~ ~ ~ ~ ~ • ` ~ ' 1" - 3" WASHED NA TURAL ' : • ~ ~ ~ ~ ~ ' ~ { ~ • f' GRA VEL BA CKFlLL fSF'E NOTE U I~•. vLc4, v o • • e _ • . Lo V • • p oov Ioi 1 Q , ~ - SFEPAGE PORTS 4 • ~ `a•` / FABR/C LINER ~ I~ ~ AMOCO *4545 OR - ~ ~ MlN. . ~.a LA ~6 L APPRO VED EQUIVALEIV T ~ , , ~ ° ~ I a t 1.~ , . . . j'L _ '**-,UND/STURBED SOlL . ~ GENERAL NOTES: l. GRAVEL BACKFILL QUARTlTY FOR DRl`WELL TYPE "A" - 30 CUBIC YARDS MINIMUM / 42 'PONS 2. GONCRETE SLAB SHALL BE CLASS- 3000 CONGRE'IE. 3. ADJUS'IMENT BLOCKS SHALL BE CENiF.NT OONCRETE. - 4• PRECA..ST RISER MAY BE USED IN CONiBINATION WI'IH OR IN LIEU OF ADJUS'TING HLOCKS. DR YKELL - TYPE "A " Sbr1Lj.: j w ~ 2'-0N + - - ~ , ; - - - - - - - - - - _ . o i. SPRAGUf AVE 'IlSSUMED ~ ~ ~ SPRAGUF a vEnrvE 0 . , , ~ ~ ~ ~ ~ •s a~ .r ~ o. ~ , 118.00' a h . , ---t0" FUtURE ACCGISf t ►ON AREA TYPE A ORYWfLt ..,...:.'y... ......,i . rl.s' BORDE R EA SEMEW T , ORAINAGE SWALE ` o I , a 4 ~ r i a . r ~ ~ , I, ~ a ~ ~TRA-CT „c,,, ~ h ~ ~ I~ . , . ~ 1 ri5,oo~~ , + FIR; . A'- VF SITE PLAN SCALE: 1" 30." ~ ~ I • J. . Paul: "Ramer A-Associates, Inc. p~ ,Consulting, .Civil•'Ehginee"rs & Land,Survey,ors L E R" ~ ~ ~ ~ ~~I'q11tl ~ ~ ~ N. 10115 Newporf HighwaY Mailfng Addres:.P.O.,'BOr I8779' DATE ;10B No. - Spokene, Vashington 99208-0179 J✓~~ ( ~ Q ~ ' Phone ;(5a9) 467•5261'-o FAX .461•5262 ATTENTION C D pARO Tp :.~PbICA. l~E Co .__Enl _G'r n/FE-1~5 - - RE W 1au. 804awAY SPoO~~49,,, WA.. GENTLEMEN: WE ARE -SENDING' YOU Cl Attach-ed 0 Shop deawings a P-rints 2 Plans. Q Sampies 0 Specifications Cl Copy,:of letter 0 Change ord'er, , ~ - COPIES' ~ DATE I PAGES I DESCRIPTION Z,, 1110 l1(; r PcAtJ ~ +1 fi&I, 9.~ .J 'oRr~~NA~ o~e~ei,~A6~ Puo►~ - - 1 --4, DeR, uJAGE slvo I 1 o$A~NA616 sTVo t' ~ 4/14/9 e Z E,osEmr#j-t DdrCim 6w T Z _ A6~2EE~✓.1 Ei~`~ :Fa1Z. Cn►~-s-t1~ ~c.T►~~ SER vt c. E S I ~~l bl" 9~: 4 ~Ol~l6l,✓ AL J~~-.~ Nel~ 5'~14/''1 % 7'.tA' l. ~bl'Ec./~c LlST . i THESE .ARE TRANSMITTED as, cliecked'below: Xfor approval ❑ For your use CD As requested 0`For review and comment ❑REMARKS - - 1 • ~ A - J~- _ . CpU~1~ ENGINEtl~ ~ -COPY"TO SIGNED: - - 'If enclosur+ss are nol as aoted, lrirrdty' notlly us, at onc~e. SMKANE COiN'I'Y INTERM ROAD & DRA►INAGE SUBMMAL CHECKLIST PROJECT # 5p - 105 .1- Cl( a DATE: PROJECT YAME: 14E1ZLI►3IPRIc6 SNoRT PLAT PROJECT SP4NSOR JlM J4E9vt'-J TEL # "(4,0 3--s PROJECT ENGINEER: e,6TEIL KRUSE -PAUL RAinE9, t A5soc. TEL # +40~ - 57-6 t ~Road & Dcaiaage Ptans) PROJECT SURVEYOR: t30,5 RE fdoLOS - PAuc- RAMC1Q, ~ ASSoc.. -~L ~ ~f'!o - 52l~ 1 QPtat) PLEASE PROvIDE A RESPONSE TO EaCH OF TM FOLLOWIlVG TTEMS. - - GENERALrIEMS viuX :4, 0~~,► ~ 1. A signed "A M T TO PAY FEES" foim has been submiaed to Spokane Counry along wich any aPPlicable plac fees, prior co any pre-ciesign/presubmitta[ meeciag ,ree A* 0 rvt 0 T have acopy of, and have reviewed the mnst receat eoaditions af approval and any EISI'MDNS requirements and conditioas of approval have been incotporated in this plan submittai. - PRUJECT DESIGN . YOO."a oYIA 0 1. I have rompleted a minimum of one pre-design meedng with Spokane County Development Eagineering Services Eugineers where agreement was ceached on drainage design approach.. vd Ovo 0 ym R 3. I liave included che results of 3ny geotechnical tescing thac is required by the clesign approach co verify ciesign parameters. Yn 0 No a y/A4 3. I have ineluded aay cequired pavemenc design calculations on new Pubtic roadways as required by che ' "SPOKdNE COUNTY STANDARDS FOR ROAD AND SEWER CONSTRUC'IZON", lacesc edidon. vn 13 ro E3•uAX 4. The coad and drainage ptans comply wicb the"STANDARD ROA►D PI.AN" requiremencs for plan, profile, and typical cross secrion elemencs coacained in"SPOICA''V'E COUNTY STaNDARDS FOR ROAD d,ND SEWER CONSTRUCTION" lacesc edidon except as allowed through approved de,sign deviacions. Y15A rio 0 mA 11 5. The drainage report ineorporaces che minimum requirements for a sconn drainage aialysis as noced in che GSM and orher icem.s which are appropriare to demonscrace chac che design meecs all requiremencs oi che Spokane County Guidelines for Stormwater :Viaaagement except as allowed chrough apprnved design deviadoas. Ya 4.4o aYm 11 6. Acomplete clrainage basin map with cime of coa+eentracion paths shown has been includeci wicb che detailed hydrology caleulations. Drainage basin map shows topogcaphy, proposed drai.nage feanues, and correlaces wich hydrology calculadons. Yb G•ro Q.-aAZ 7. All applicabie araific signing requiremencs are mec and have been incoiporaced in che plan submictal. Yn E:`xo E1.mAX 8. I have included copies of all approved DESIGN DEVIATIONS wtuch are required for chis projecc. Y-AYo 0:4m 0 9. The plaas and drainage report are sramped, signed, and daced, and eontaias, the applicable eerafication stacemenc. Y« C Vo r-I:~A ~ 10. I have included an adequate erosion control ptan and appGcable standard plan noces. ti•hX :w C •►rA Cl il. I have seeured approvals from all applicable oucside agencies such as fire discricts where applicable and have inclucied proof Af theu approvals.. Yn0 w C •uA 0 12. I have provided an accepcabie means tor perpetual maintenance of screec and drainage facilides chac is ° accepcable co Spokane Couary and have secured and included eopies of any required easemencs. Y~,*b 0 ym Cl 13. I have reviewed che plaas. calculadoas aad ocher submiccal daca for c:ompleceaess, accuracy and consisceacy and have submiaed-cwo eopies oE plaos and (1) bound draiaage report. - Ucicplatv 1.0/May95 1 - ' . A I und-zescand thac che cequirments aoted above are the minimum requirements ncxessary cu perform a cursory review of che projecc plans, and chac addidooal infarmarion should be included wich chis ~vbmiccal as necessary. i understand that this submittal will be ebecked for compleceness prior co review, and thatAt wilt he reacned for further informadon if ic is found w be incomplete. i understand that this submittal.wiU ctiot be accepted for review (and placed on the review list) until a1l requiced informa►tion has been submitted. - - ' • - ~ c~',•~ e 1 Focm compieted by che responsible fingiaeer: ~ Company: PAuL RAMEg. ~ ASSoc,A-fES ~NC.. 8 .address: N1o1 is NEwWaT wwY SPoK-ANE . wA- 99Zo Zip eode I, Dace: J"-LY I . iFOR ~ . S SUBMI'ITr1L.: Accepted for review.• - Renuned for 5-ubmictal vf che foilowing: GENERAL ITEM # : PROJECT DESIGN # RESUBMITTAL 1TEM Focm renuned co: Campany: Address: Dace: By: - Spokane Cawuy Public WorkS Developmenc Services uapim1.OnHay95 2 . JL. . b, , SFpB;ANE Ca ROAD & DRAiNAG SUBMITTAL CHECKLIST PROJECT # ~~OA--t PLre -V NO. 5P - lOS+- 7(o DA'TE: ,Jv^1 E ZG 0 179l0 PROJECT NAME: NER UI'1 /PR tGE SNo RT PLA T PROJECT SPONSOR: NER uA) TEL # iZ`F - Coo 35 PROJEC'T ENGINEER: PETER. KRus£ - PAut- RAMER ~ Assoc.• TEL# qG7-5Zlo ~ ~ ([toad & Drainage PtB.as) ~g ~Y~°c.DS - PAv(. 12A/►1 E!t ~ Assac. , TEL # 4~°~ - SZ~o ! PROJECT SURVEYOR: Mat) PLEASE PROVIDE A RESPONSE TO EACH OF Z'BE FOLLOWIIVG ITEMS. GENERAL ITEMS vn ~ rro 0 rriAO 1. A signed "AGREEMENT TO PAY FEES" fiorm has been submicted to Spokane Counry along with any applicable plat fees, prior to any pre-desiga/presubmitta.t meeting vd ~Na 1:1 ruAO 2. I have a copy of, and have reviewed the most recent condiaons of approval and any EISlMDNS requirements aad conditions of approval have been incorporated in tbis plan submittal- PRO.TECT DESIGN Yn ~ rro 13 N/AO 1. I bave eompleced a minimum of one pre-design meeting with Spokaae Cnuncy Devetopment Engineering Servic,es Engineers where agreemenc was reached on drainage design approach. Y'n 0:'1' 0 r,,jK 2. I have included the results of any geocechnical testing that is required by the design appioach to verify design parameters. Y. 0 N. 0 wA)Q 3. I liave inGluded aay cequired pavemeac design catculations on new Public madways as cequired by the "SPOKANE COUNTY STANDARDS FOR ROAD AND SEWER CONSTRUCTION", latest edidon. Y. Drh F-I H„►)Q 4. The road aad drainage plaas comply with the"STANDARD ROAD PLAN" requirements for plan, pmfile, and typical cross section elements concained in..SPOKANE COUNTY STANDARDS FOR ROA►D AND SE'VVER CONSTRUCTION" latest edition except as allowed through approvetl design deviations. ,rp)K mp o 1Y1A ll 5. The draiuage report incorporaces the minimum requirements for a storm draiaage analysis as noced in the GSM and ocher items which are appropriate to demonstiace t6at the design meets aal requiremeacs of che Spokane Counry Guidelines for Scocnlwacer Managemenc except as allowed ctuough approved design deviations. vng-JINmO 6. A complece drainage basin map with rime of coneentradon pac6s shown tias beea ineluded with che clecailed Uydmlogy caleuladons. Drainage basin map shows topography, proposed drainage features, and eoaelates with hydrology calculadons. vn OmOruAK All applicable traf5ic sigain,g reqwremencs are met and have been iacorporated in the plan submiwal. Yn 0 rb 0 Mw la B. I have included copies of all approved DESIGN DEVIATIONS which are required for chis project. v..)qrm 0 cuA O 9. T6e plaas and drainage reporc are scamped, signed, and dated, and contai.ns, ihe applicable cercificacioa ~ statement. vd4a 0 Ht,. O 10. I have included aa adequate enosion concrol plan and applicable standard plaa nooes. i ,ra 0 NO 11 ru,►X 11. I have secured approvals from aU applicable outside ageacies such as fire districts where applicabie and have included proof of their appcrvals.. YmOrm OmA0 12. I have provided an aceeptable means for perpedW mainceoaace of street and drainage faMties that is acce,ptabie to Spokane County and bave secured and ' luded copies of any required easements. I 07 oWNE~s WttL /~'1A/N'fA,s1 SW~~f ANp DiTC~/. Y. ~L 0 wAO 13. I have reAewed the ptaas, eatculaaoas and other subm.ittal data for completeness, accuracy and consiscency and have submicted two copies of pians and (1) bound drainage report. Uckpiatv!.0/May4S 1 I - funderstaad_,that the• requirements uoted above,are, the;minimum,-cequirements, aecessary to; #rfoim a ciirsory: review of the_project plans,, aad tttat- additioiW infocmation should be,included ,wi'th this submittal as.necessary.. : I understand- that this submittat' will be checked fou completeness prior to;- review, and that ic will be returned for further -informadon if 1tis found'tp ~be incomplete. I understandlhat-this-submittal wUl not.be socepied for-review, (and placed oin the4eview list)-until•all required, ioformation has, been subrnit#ed. ~ Form coTnpfeted by che aespoasible Eqgineer. ~~r~•= - r l~ei~~ /Yl• /~~kse~ Comp~. any; = -,I= -PA.vL .PA/►1479.='f ASSOGIA..7ES .~NG. . Address: 0-101,15 NEW'PoR-T, 1►I&Nw41' '~OOKA-~c -r _ WA-sN: 99.Z.o$ Zip code Date: d IFOK 5 K' . , . . Y - SUBMITTAI:: Accepted,for review. _ Retumed for :submiual.of the following:-.~~ ~ 1+1~ ~ GEIYERAL ITEM # : - - PROJECT DESIGN RESUBMI'TTAL FTEM; ~ FO- -N IID L'EtUrD~".t0.~ ~ - - - - ~ COIDpany,: - • Address: - Date: By: Spokane Cownty~~Public Wo elopment Seivic~s ~ ~ ~ Uckp1atv,1.01May,95 2 _ ~ ~ STATEMENT OF AGREEMENT • Dorothv Price ,(Sponsor) has entered into a contractual agreement with J. PAUL RAMER & ASSOCIA2ES, INC. ("ENGINEER") for construction engineering services for Spokane County Project #SP-1054-96 . 1. The minimum scope of these construction engineering services includes, but is not limited to: A) Daily observation and reporting of •construction activities on this project;. B) Maintenance of all construction records related to this _ project, to include, but not limited to daily inspection reports, manufacturer's certifications, material test reports, and correspondence; - E) Assurance that the construction of the appurtenant -_drainage facilities is according to the certified and approved plans accepted by the Spokane County Engineer, Spokane County General Provisions, and Standard Specifications, and applicable portions of the WSDOT Construction Manual; D) Staking; E} Development of Record Drawings; and F) Testing of construction materials for compliance to the ~ plans accepted by the Spokane County Engineer, Spokane County General Provisions, the Standard Specifications, and applicable portfons of the WSDOT Construction Manual, all according to the edition of the "Spokane County Standards for Road and Sewer Construction" governing this project. 2. Prior to acceptance of the drainage facilities by Spokane County, the Engineer shall submit all construction records and Record Drawings to the Spokane County Engineer 3. The total estimated cost of Construction Engineering Services for this pro,j ect is : Current hourly rates, not to exceed $500.00 ~ _ _ . • - ' ' .e • ' . - . / 'DATED this daY of 199 ~ _ ` ~ ~ z Dorothy Price/ S,-tate of Washington) County o f. "Spokane ) . _ -I --certify that I know or have satis-f'a6tor~ evidence :t~iat - Do=othy ~=Price sig~ned this instrument -and acknowled'ged i,:t to_ be her free and, vol,untary' act for the uses and -pur-poses mentioned in~ the - instrument. - q`I -Dated : ; . ~ NANSEN .SF WiiSHiNGTON, " . - , Notary Public~ :401ARY ~-PUBUC - My- :appointment expires.: my,commki'm ~ 11-01-9'i , . . . - . - _ ~ - - - - . ~~rr . . :o CSGISa903Q0 RC40(91A c p Ay ' . ,tc-nunI ~ ~o ~t',oFlM i s ~oQ dw 9~96 ~ 0~ Es~blihmeIIt of ~ a Temparary Easement ~ IS~KwE c~urm. wN. I ~ , Dt~~Co~hah a~at~pcuuy ea~ceaoaert made and an~e~edimo tha d4y af ProPatY awtw " aPplY m ft pmp=y lagally descrled a4: ~ ~ _ P*xt oi' Lot 4ae (1) its Sl'oak Trv ~ eaty-tisix (26) of C:08= AaDMMaN TO~ACRBS, ia the► Couaty of Spokane agd 9tate of Wa$hington, ~ as W iaap thareot r~corded i2s Hook "S" of Plata , pa,qe 30, in tha ~ oftiQe of the Cat~n~y A~sRiitor of said County, mom paZtica.larly ~ desaribed as loilvw~ s , . ; Beqi"".iaq- at fihe nasMtMI ast. *=er of said Lot one (l) ; . tbmnc* south = the vest lssta of laid Ict a ot 379.70 feeK; t'Wenr.e east parallsi with thg nortih liue of nsid lot, a e of is5. oo Peft• th~ aa~ p~uca3.J.e1 with the ~ast l3ae of : sa3d lot, 379.70 fee~t to aiposnt iu , - Me nortih ~.ias of aaid lot j then= vwt oA fte narth line cg ssid lat, U.R.00 feet to the.pol.nt,of beqfniAq. _ Futher desctibed as Spakne Catmty Tax FSrca155191.0401 =d pmposed Shon Plat SP-14SA-96 . . A 15 twido t~aapo~r eas+~nt stmll be ~stablished t&Mroo to temporatily and C of inoposed Short PIsa 1054-96. as shawn an amched map. Seid ei be phy"y closed end vaeated whm dMer of the fnllowing apply: langva~~. - 2) ft Depen~t R~eL~Ive Pesmi.t is ongar valid; or 1t ~ m°stin8 PromrtY owm mUOZ~~ of ShOrt PlBL 1054-96. In clta eveat thac eider o«aa.' Zh,Q 1~1 shoIl, priar ta che t~msf+er of tit~e • owner o470k,~ of Short PI~c 1054-96 of X4,7 ~ I) remove the exisang mi1et • ~P~ 2) '~p d~se and vac~e ttue foc~t wide tempQrvxy emumat: 3) me~e tbe mqairei PhYsi' imptaye=ts out IS foot wride mArQ easaneant o4 sernc ns pemaaent a+acess fo aod C(aee amcbed miap): aad 4) ncwd with thE Comnty Audhor a ren~s the t~npc~ary easemenL Au114ttd void. Said docmu,ent sbelI ref+w= the Audf~ar's tecording mmbeac assi~ed to tbis docut~eac Ta additioa a capy of said document s►W be iumfahed to th+e Divisian of Buitding and Planning for file ntunber SP-1054^96 . . • ~ , ~Dorothy Price ' , R.F. ribq# ~ . ~ ° . . ~ . 1 ' , 1 ' ~ - ~ ~ - ~ ~ • , 1, , ~ , ~ TEMPORARY ' pR1VEWAY 11,500 0~~ - - ~ EASEMENT - • ~ . i . ~ ~ ~ 2g• '8.5. PARCEL . . . . . • ' ~ I ~ 13-,190 S.F. • : ~ ~ PERMEN'ANT ~ 56 wioE ' - , I ~ ~ ~ - ~EASEMEN ptISTiNG T pRA1NFiEL.D f _t - - • . ! ~ . - - . 115:00; LL ' r. V~ oo.oo A c;..- V.y y . g2.9/~" 1V1~J nn ~ ' PRpPaSEO V' 1 ''J .r~ ' D ~ORAINFIEL EStM~~,• 'd& T.,AR:QEL ~ - WN - 0 ; _ ftI rw. . %J ; ; ,12;500 S:F, .a ~ ~ '101h • - ly1 Am- ' :..,.I.5~• 8 5;..... , . . . ~ ~ _ - S ~ _ 1, t ~ . ~ ~ ~f~ •~~r~•~,~i•~~~~' ' • _ ~ . ~1 ~ : . ~t.5• wioE j ~ L- ' ORIVE E~T . 1 ' EASEM . . ~ . Am PARCEL ; 3 l 18.00o s.F. . . _L 11; 5.00' ~ 1 ST ~ M . ~ ~ 115.00s , ~t J : %do . L~___~__ ~1 '`~...~-iwi dO*' ~ : _ 1 . • _ . - , . ~ ~ - - ~„z ~ , . , . . • . . . . ~ ~ • J' )D-'T-ON SCR44E / tw TO .TWG I A I~dv.crrr.orr d /lXBi/ 17L6 JrCX dY 7/lEff /X~JE'A'7J ' ~ " 6 I,~aJ llir Sfb~rNwtit ~Rt1: r~sv~vs~r~ Cw+rAy+~r ~r CavPr,.e~,w►Akat/ridolf wa/ ~/ernad ~frelobdi ~a~ rnb'~map~o~,frr~wal [a~►awRa~rrQ.u ra d.rfr~,ar,rrl wd I f~ tfoAnr dsdrlixr /o C~r Ps4~c Ih.+ rrrrrrt avd.6~a vl~bm~v~rn•o. ~Ak~a+L+ NSrlcrr'rd ns~~/a: dt,ca* d~~t:iard u~lA/!~~ .,7~6r A~v+drru~rwrr..j,w►,~ .vd ndrAilC . wrar~ra~rc.r~~,~1d/Srrr,w~sruf~rrr.vo~lTr..ovr~~l.~r~ry,G.rfrrJ,var~ •/e"~m~rss~y. ' . • . frrc ~.v/ ~a ~ y~lvrll~rn.~r<rJ<rr,cS~ar~ divrr.~. !k~ xarx~.~t~lG~rssur fx~L.irrfma l~+y ~ ` : o,~,y ;~iA irr.cr.i.~.:.~~fvv,y~A rlfJ r~r t.or, ~r~ ~ d11 a/Yr}G /3~,~ll.axtn r~e,~c~ I tn~.vrsrhr~~r waorre~r .w.,; J lMNr»n rrf: ~vr:er ~jfbtNarlc ~rvP(~' ✓~~~dw+kll /sr ~Q,~d~SrJ/u~l.CrSrrvf~~QJtQ,vsr~rrvl/1,rpoN~.~re~(~,vs~trirA'/.lsl~.fa~~I.srarn:rA'~rrn+, • -r11 /+~r~~4~o /~NA/+.fNt rtI ~ p5/J!F r~//uw~r FBfI~Np! NJf l~/f dl~Ifr,~~rCflfftl~f+7~/fi''A~f • , ~rrt u/fcr ~a~~~ufJ o!: ~t~+t,~~ r~r~rtrr :',:./J~, l pvrt~ ~/,~e ~r'cit+~li''~//,~i'.kr.a~e~srl y'r+rrte~~~.~,.r~r~~ /~r.n:v++~'n~lOrirr.•.~1,erJ'c..trf,~ora. G~ar~ri ,~r,~.fa.;a,wir~!dl.6r~ar~ ~v~e ~yxr:r c, tn.~ u}r~d~~: 4.ro~Irr~ Jr,:+/C=lAF~►jJl'.M'!S~ ~yyd`I~I~IYPp~,~ p!•,rlSriFKJ fi~frnr. ~.w•.a~;r f~rrl+f±n w~,r.vr.r'•Jr~FrJ~CJNlr~i~t~+r/ti.r*J~llnnttr~A~:., f' . 't I~II ~ ,ffs/!et T,',~ytffw ~~Jlvl~/u2 /a+ IN/TJYfJi WNlt~p/' /xf ~WD.~f•~'An'f YpsP~tl r r.d,f/Ii (Oy1R+Mr' L7a~J ~p~Ir//A L7J/K~I/f ~ - er~zr I,•p: ~+~ui~.•~.~,C,f~lJ LPI~tl1tC Jt+il /Fpr r~ltitd~r~rre /~Irrtv~. ri~ rsea ~~u~ .~POwRrr~wlirv,~~,+~Pw~wr 1 I i~°~'~`+~ , rt. ~ d r~ ~ vwn S.rrrrir, d. !L rr.G.%u wt+~r r ,1 ~ - ° ` - _ , ~ I r ! o ~ !!I'f!1 ~ . . _ .r . ~ . . ~„o~ pN ~4 '"f ~1 I~ t... r.~r .i, JN, r.!• ♦v+ •.!r I). ~ StA~ +~t~ ~ i f ~ ~ * ' " ~rr.r ~ : ;+n~i~ti ~ i 7 ~ ~ ~ 1i ~ h• ~ ~ ~ . S 1 ' ~C~rNO~wtfQG.7C/Y7 ' ~ e ~ ~ ~ ~ 4 ~ k $!i►,`t r.~ lrfqJN/,Wloa ~ 1f , J . s ~ ~ J F ~ ~ . i~. 9~ a \ ~ LOIA! a~..f6o~Il.►F ~ ~ ~ • 1 { ~ ~ , I~.:~ / r,.e C+° J~s •:.si~r~. ~pro drr'~n err fe~.~er~ii~~Irw~d 1 A'ir~ ~ ~ ~ „ t i~v.bv~ n~•Ji~~Jr.: c.:~r~nl1rsr~~_al•v:ir.'yd/~ d JrR'✓.h'~ser-~~rrnr.Y~~/~yrfEF ~ ; ~ ~'On' ~►r ; sa v'rrs~~r~rt,,/!,Cr.,:iu*~r:~~f.'rlriri~rlr~:§r~rnr.i~ar.dlrrraa."v~..;~tr.w+~vrr.or~.r.v,~+.• 't ~ y . 1 = ~r✓ lrr..a~^r i~.ie Ic~ ~o.:•.rrt~••.r: t ;r.^d Jcr~,h : ~C JR/d COr~!lJtM~J ~P/'3rl~r., ~a~ ' ~ ` ~J ' ~ ~ ! ~ ~ • ~ l.vlrir~rc$:rr.~r.ra.~ ~o ~ i ~;.rr~n~r~ :.Crn-:v~'.c~~ri^ 1 Jll~v. c~f•.~.'.~t.•d.aat f'.ad~ ~r.~l,r~ari ~ • . rta:~~rra~ .rf✓ ~.t+• ttr~raf~r«~rtir: ~r t~r~ra►fsrolul~,v~/ tai ~rat~ae I ~ . ~r ~e, v ~ _ ~ ~ y ~ ~ . ~a ~rr~~.~fr~~niei.v J~:~ic."v..r~•. ir:F~r'.TGO&~J4i~~Ilriruf~7rfrPl//da/.ua/ ~i't'' ~ _ '~r, d d,. ~ _ ~r ~ .1'r.RI..K7fafa+'f;~tW~iY~r/frA ' + r... K N 1 ,r /ly~/ Ff . . , ~ ..u , , Tr„K N q ~ ~ , , , ~ _ ! !'/:irMi3~1~t1f,erw/h+rM~~~7~•r ~ 1/ . I 'f~+~~w~~4~v .;i~ur~~~rrlbrrrJr.iw,.~s+~9 P..~`~ ~Hje+N~r~rr,+~ ~ ~ ~f ~ ~ wl , ~ 5 ~ ~ ~y fl / N ~ ~ ~ NaTan ~ , X , ~ i ~n~ ~ I . + ` i . ~ { ~Y~1d ' ~ . .17~ ~ •r P~ . ° ~ 1 1:tii N ~~I y d fti /S• _ _ ~5~'1__..~.""~"_"""_"_.!!P'l..'_'.....""'~'wI1 4"~/0 ~ ~ ~ d r« ' # •w r♦ I EirG+MCe~ri C~AYJFiC.~IrL ` ' ~ ~ _ 4 ~ ~ ~w e . /~'ir~y tr~I.! 1.7M! !d~• t~ ~ ~wrnr ov'o n~ C~.~~~.oAQ1 ~r~,w i, SRtlxwr',Pf1 aroc~ ri J~e,Lr ~ ! + h trrrorn~rf.rA'nr,d~r~r.vw.•rr~ 3Kr/~.~dJf.t.1`si•rl..r-+rvrfrrr~~.,.:lvl,Srr~,..~rpv+~ri+s,sr: a, ~ ~ r ~ ♦ ~ @ ,•c.rr,.f p~'sN'vlri:~~f e:'~? wrl.>.•/Jf'~~~r ~ir~.rri..~e:.4t' f...f ~f •'J7 Ri,?v!'~Y>J7,/~~Mlwk+Br~'r/ Jdr t s~` ~ ~ e 1.^r.~,.r1: Yr✓~l.r, ~a:,°,r,':••:.aen~j' ~~eJT:'.nz~~ioi.r~S~7fi+" ' ~rs~il.?s1r7's.yseFrr~y~r.ie,uf il t ~ ~ ~ ~ ~ ;+~df.+I!}:~r,r.R,«r.+~r~riwtr~.rrNdl.:rA.nr~rt~:raN/r:r~fHr,`.'eru~h•f.iN~:w~+~~rs~J'1wc ~ ~ ~ ~ ~ ~ i , n~~~A`wt~l fSLr/!f IJ~ n~ n~, ~••y~1a+•~f 1• ~~.r~f.,urJ'NSI f.r~1~~.r cN~i1r,!r++i'~lYaorl~'..r~ ~ I+ 7 ~i rs. . ai. ~ k ,.~~.1.wr:1Jt:Ira•~c,wlrt.* ~t.'.~.~i JceYA/ rlM~f~ e.+r/•~•a!`.i`1/'Ar~'.•~I•/+.ar u..:rr./ '~,ti' ~ as. rrr, ~ ' l . ~ ~ ~ ~~J•*I'~i/r ~:<.~~~^rl.r~'.,.-~tfe!`.S~l.tlffafi;~.~P.'„ ~.Yl/.~~Ji~✓aFrln~~.f3~.•~.'s•IO~/,v ~ •~5'ti O i.~ , i+. ~r. ~•r* fi'r I' r: . r . . ♦ ~ ,l, ~ I / .V. /e~t.~r,ar _ d+f ~r.^.+: • ~ r +r~'lfi~ . .~f Far.!~ r✓~~ v~.vi •.y d•~ f.J6robf~~+: rnvRrr ~ y ~ I ~ i r.l~., r r 7is~ ~I'-. -vN~ :rrn~YrFJ+riK'~~1 ~*.rJil.'r .-i~.~.~r/f. i. ~st i1.emlut .»a ~ ' n rl a < < ' ".1'~: 'I~prf~~^r~r1'..t~b.:i.~.:r•:> ~~N/..t~d.l.i~f~ilj✓rM:IPrJ f.rrr..<<[rJrs~` f ~ ~ , 3 , , ~ $ ' :•r ~,r•r..r'.~r~,~r•r ,~~r.P~r ~ w+' ~..'.r~r,•r.c~~r' dJ~l.i' rl~.o5~ or.eesir.rra. , + . - . p' = ' t i ~ . . . ~ ~ .i:,r: ~~av ~r.+•.~ i~:~ ~ r i ~ , l~'J~ ~.~f~7t ~~r,l ~'f+oanY . ~ y~ • ~ ! t y ~ , ,.i. ti v . ~ ~ ~j \ ~ i ~ i ~ I+ e . ? ~a, : ~ y ' 1 ~ 1 ~ ~ ti ~ ~r ~ r J..: 'Ni l. P +n ~ J+' ~iu„ ~~I.r n ♦ / . J / ~ l~ul~ ""~./17rF' j•'~'ae.• ~ •.r~~ . :.^....:rr..l~' .tl." . 4^ J,Y/,'lJli ~1: IO~S.CJI EO/7~~M~ ~ I ~ Q IiE+.i f e yr~ ' r ~ ~t,..r. .1:~:!J".r i~,+F:a~~vi 1^.fJ~.7f.w: :f~.~,I,•d•r.~l~'.s/IO~ I t:.~ , _~.f: ,.,-✓F.:d+e „/f.. JA.1'Ji.+ JJ: ~ e fJ ~ ~J~ ~ ~ ' ~ ' I „ y1' Y ' y~ 1/Yl~ ` . w f S' ` ~ ♦ , ~ ~ ~ ~1A ~ t ,:wrel~AlN ~ iY { ~ ~~r} ~1 . 2 i 1 + = r .~.+u• p p ~ - _ j d~~~ 1'~ + •f ~ v{ L.7 J~ :~[JJJ J J/ L u'lJ Q d... ~!J ! P.~ td, AI10 ~ ~ , A .L'T , ~y. rt f•i«:,.m t ~ ~ i ~ -9 r r~xnlir.r I ' 4.~~'•,~•'F~rrt,!N~ ! . ~ : s : . . - : rr. rr.rr:.•rd ~.r.frrd !fr ~rrcr/ ' : !h.-i i 1i: er .aI.S~' . r~~•,, ~f ! i. r: ~.;-aJ J.' ^d:./JJ`f LrJ.~~i4r~d,r~.:J CI Od': '.J I~~.~ ~'l~1 r: J•IJl•X. ~ , . . f.'~OJ+~~ I,T ..~:T'f S .'!llla~/~,°JIJ ~1JaN: . ~t7fy ~,J ~~~~G JoJrr~,~~ Q i/.•a•• h' Gblr I~ri r+rT l+rir.. ~ ~l.J . ~ T .YrCrrlyd ,#~rrt./ N, ~vtr " ' ~ 3~ r~/5rlr..e ~ srFi i.~ ~~~rJJ,^ ~ ~.r,~wrr Ar . a ~ ~Y 1 • fl~ O~~irv~ /a/trl N' .f19 ~ _ _ . . . _ . _ , . _ . a - . , ~ ~ _M_ ~ , _ _ _ . _ . _ ~ _ . . . ~ ~ . - - - - - - , - - - - . _ ~ - - _ . _ . _ _ _ _ , _ ~ - ~ ' ` _ ~ ~ Q ~ T - ~ . , , . ~i r. . ' i ' • , . sv , . ~ k~~ ~,.t.../ _ n.~l...~r. 1,~ t...~ ,k~.~ _ y°' •ii,.~ , ...r . s . _ I . . _ ~R ~llf rI/] '+~'Ilra _ IIl7 reJ1 rJ~! ~ JI.~ II. Jir a~. ~ /p~4` . . q1~Y~'i~` .Iral. ' ~ ~ ~ ~ ~ ~ C ~ ~ ~ !II /r ~ ~ , 1 p ~ ~ i,+ , ' ~ , 1• ~ ~ ~ ~ , I ' ~ ' ~ 1_ ~ r ~ ~ f ~ ~i ! I j ` ' ~.._N ~ I ~ J ~ J ~ ~~r,.. , ~ , ~ a r ~ ~ j , ~ , J . ~ ~ _ e ~ y + ~ J ~ ~ ~ ~ ~ ~ ~ l 1 . R~uroef , ~ ~ . . I ~ ~ , I' - i ~ ~ ~ t ~ ` i' i 7 J ~ ! 1 ~ 7 ~ ~ ~ ~ ft ~I ~ $ i r.. I; ~ ~ ~ ~ ~ ~I ~ , ~ ' c 2 s r i ~ y ''ro I~ . , K ti~ , ~ ; , a ~ , rfiP' •riY rr.rf ~ ~ii .J~r' ~i• ~!r ~r. f' • . ,e t ti / 1 i e 7 ~ ' ~ / . . .F! ~ M's~ L,vN i ~ s I!~~L r • ` e e ; ,r, t A Ja• a.. JR.~ + ' y `7 k ~ ~ y JIf ~ . • JJlr JIf. 1Ir JIl JNe ..r~..'fi . ti ~ M I.n w~ rM I/~ L ~ 1 r~ N ~ N ~ af ~i ; I, ! IC •~l b :i , c , , . . , a ~ ;i = .I t ' ~ lOT ~ ~ ~ r.~~.:rr ~ . ~ ~ ~ ~ r i i~ 1 f.r~ ~ " I; N , ia r . ~ ~ ~ 1 C 1'• a ti ~ k ~ ` I - ? I t i R ~ / ~ ~ " ' ti ~ 1 a i . ~ f ~ . S ~ • .1 ir t ~ " ~ ir ~ .r+ a• ~ . . p ~ 5 . + ' + ~I J i f i I J~ . j o J , li i'7• A.+y, ~ ~i . ti ~ ~ ' ~ ' , , (~r~~ ~ t ~rr.• ~I ! ~~e ~ S ~..F" ~tr11 je' . ~ • ~ ~ ~.i~ .ru .rr. ~~i .r~. ..i ~ ~ 7 1~ fi'r~• ~ 1 •iN u r'~ ~ l 4 ~ , ' ~ ~ ~ • ~ w...G... ~ y ) . ~t 4 rJ ti I .r t ~ ~ ~ I r I 5 1 ! 1/ JI . 1 S ti ~ ~ ~/1~ k7 ;~1 ' , t 4, 5~ f 1 .S r, y ~ ~ ,i 'i .r$ .n I~. ' ' I'Mr ry `I ~t~' ~ . _`r , " a ` ~ 1 ~ i~ ai r~ ~ . iI , t7 I ~ f . . I' f~. ; \ ~ ` y ~ ~ ~ ~e ' 1 ~ ~ ~ 1 ~ 5 ~ + , i' • . 1 ♦ ~ I C : i ! ; A p~ .J ~ ~ ~ M . ~ ~ i I I 1 ~ ~ ' y rri• . . l~~ . + ~tsr i s ~ ' r, • ' ~ . t4 e I a ` ~ 1 1,~ ~ ~ ~ I • r/~ , ~ ~ 1 , ~I 1 , ~ ,,..~1 ,u i ~ ' ' ' ' ' ' ' ' ' _ I ' ' ~ ~ ,fj~ ~ I i , ~1 f ~i - . . ~ . ~ ~ . ~ ~ 1 ~ ~ . . ~ . . . ~ . . . _ e ~ ' ' ' ,`o ' ' q ' ' _ ~Y ~ ' _ ~ ~ :Y G i . • 1_ ~ • ~ a . j ' h _ . ~ ~ ti ~ . . i ~ i _ 1 Y 4 ~r r • ~ Ir• ~ ' ! ~+j 1 „•l ~IRA~ r ~/II J!! l// . ~J~ ~ ~ I JI ~r~' , ~ ~ N ~ ~ f+ ~ ~I~ ~1. I f~~ I , y i. 1 ~i M ti~ '1 ~ • ~ ~ ~ V '+y ~ ~ ~ ' ~ F S ~ I .a ~ . ~ ~ i , y ,y . ~ t ~ 1~ i ~ ~ ~ f ~ I f f ~ ' t J ~ Ir l~ /t ~ ~r ~ ~ , ~ ~t , 6 ~ 'r'1Y ' r~ '4 L • ~ i i y I ~ M ~ ~ t 1• ~ 1 , 1 1, ~ ~ ~ i~ ~ { 1 ~1 ~ i I ~ S J E ~ ~ ~ Y ~n ~ ~i 1 ~ ► • i A 2 6 ~ 4 ~ r - ~ r •/I ` ~ ~ 4~ 7/ ' ~ ~~J ~I . /I.ltltK ~ ~ ~ ~ ~ 11 :1 4 1 ~ ~y ~M~~' ~ f` ~ • • ~ I ' ti ~ ~ JI~ ' V r ~ 1!~! r~ ~ \ , ~~I rI ~l• , ~I 1♦ ~ . 1 L i ~ ~ i'i. ` nP~ " ~ ~ • ; r ; ~ 'i y ,S , ` ~ ~ . ~ ~ ti I , • /p~ ~ ~r " . nl ~ ~r ~ ~ ~ { d ~ 1~ y ` e ~ . ~ ~ JIi • . ~ r: i~ . ~l ~~i C' ~ ^ ~ ~ ~ ~~t7hI ~ I I , ♦ IJ' v/I ~ ~ • ^ 1+!~ , lt~ ~ ~ R!d ] » J~e ' ~ ~ . ' 1 1 ,r ~ ,Z,~'4' 1 1 J Mx 'N ~ ~ ~ . J..J 1' J.r , i ~ • , , ; rw r . ~~l 1 ~ ~ U . 5 - ~ ~I , / r . r1J ~ , ~ ~ rti ~ ~ ~t ~ f Is ~r ' ` I I~ fl ' ~ ~ til ~ i e ~ 1 . ! ~ ; ~ ~ ~ fr ~ ~ ' ~ ' ~ 'r . ~ " ~ r•'~ s.~ ~ir. ~r.r ~ ; J 4 ~ ~ ti ~ . F ~ ~ F ' ~4 ~ 1~ M i ~ ~ ~ ~ ~ r ~ ~ ~ r ti ~ . ~ ~ y ` ~ ` r y ~ ~ ti' , , r 5'r q- N~•~ Y .r[• r i! i! IJ /J ~ r• h . 4 j ~ i ~ , I f I, ~ U i . ~ , ~ ' ~ r~+ ~J i re i.~ ~ ~q ~f ~ i I , ~a ~ ~ ' ^ . ~ `4 -'t ~ ' i ' ~ ~ 1~~ . . STNNaFRA ~ ~ ~ I~ I r; ~ ~,z ~a , . n~ I . IJ , . I ~ ~ i ,.~f 1... , 1 _ . . ' r . . . . - a ,J1r.. ~e . . L ~ ~ - ~ ~ti ~ ' J+~'~~.' ~ " ~.i~atfF~frf/~L' . t,~,.'" ~.',`e~, ~+p. .T~r ./f „ " ..Tf~ j ' - ~•I J! !Ii ril~• J~A Jr♦ ~ !~l ~ . S. !lt ✓iat. . . II!"J JIrJ+ JJ1.J1 ~ k fJ~ ~~G'd , , ; I ~ ~ ' I ; ~ ~ i ~ ~ L , ' 1 ~ 1 ' ~~J l ~ 4 ~ 4 ~ ~l ~ : ti t ~ + ~ ~ ~ : I S ~ 1 ~ ~ 4 t ~ . G ti r ~ 6 ti .I .7 ~ J ~ C / 5 f 17LT I y .J 4~ ~ t! ~ 3 4• L ~ 1~I ; * 1 J ti~ ~ 1' ~ ~ ~ ~ 1 . , ~ ~ ~ h ~~t r y ~ • ♦ ~ ~ ~ ' ' Z I ~ ~ J ~ , 1 . . ~ ; 'r' ~ j ` ~ , / , ~ 1 `I , • .r. .l.C~" I i_27 d.•l~ lrrN N~./J !Hf l~• ; 1I~ . [1i _~1.'F fr,r J7~ J/I y J:' '_~'l ~ ~ I ~~nl •1t ~5 ~ iJ♦ ~y I ` ~ ~ I ~ ~ ~ + . ~ ~ i .h 1 ~ ~ I . ' { l~ 1 J ~i ti y I ~I ~n S :I S ~ ~ i ~ . ~ F ~ `I ~ h ~ i ~ar t~ 1 ti ~ _di~ ~ ~1~r . Q : ~ e .l i. ~ ~ „ l~ ~ /Q , Id ~ ; ~ ~ ~ ~ I. I 1 ~ ~ ~ ~ + ~ I I I ' ~ f 7 ~ 1 ~ I ' 1 ~ ~ I. ~ , f ; I ti ; ~ ¢ ~ i i ~ ~1 ~ ~ . l , Z il ' i , ~r.- . • ~ ~ .i+ 4 sr.s~ ~rtrt~ ~ ~ . r.~irr , ~~mr~ u.ir r .~i~ _f _ _ aMdM ~t-'I,i~j ~•'•MAN6~ . . •i.' " ' ,.*E~_•____.._ ~.r c ~ !lPSBn - _ ' . ~f ~ i~l.J~ ' J~y~ J:dJ JN !~J JJS {I .l.•• J•l J•J J~J• ~ Jar ,I/[Il . . , . J1 JYtN IJw:1• .rl.!/ ~ 1 I f . ` ~ ■ ; ~ ~ i ~ ~ i ~ S - I ~ I ~ . ~ ..r.. , L ' ~ ;bi e , , , r . .r , ♦ , r ~ ~ ~ ' = ~ i ~ , v , ~ , ,r ~ s , 1 , r , ~ ~ : ~ ~ ~ ~ ~ y ~1 I ~ ~ ~ I p 1 ~ ~ ~ ~ } ~ ~ S 1 ~ ~ ~ ~itt !af' arr~' J'1~ J~~ .rs~ Jrl !eJ' aU' l;'~~~r Jer1~ . . i~~ri . ai•~r .».sr ».ar~ _._..,....~~f .i., i ~ ~ • i.:i ' .s,:." .qi~~ ~ ~ ~ ~ ~ ~ . j , e i ' r~ti i , ~ ' i p~' ' ~ ! ' ~ ; : ~ : ; : , i~ ie ~ ,v ~r .~r i~ ~ 1 1 ~ !I ~ /I t !L ~ !J ; iI ~ ~ ~ ; '3 ! ~ ' 'F~ ~ ~ Z ' I . ' ~ • .i. ` ~ ti ~ ~ ~ ti ~ i ~ I y" ~ a. ' ~ • ' ~i . ~ . ~ . f i ~ ,.r df2' 1J.f , ~ s+~ ,"j rerr~ ser~f• . . ~ . ar~er .~a~.r ~r~r• v,~ ` ~ _ rJ~~r' ~ 4~r ~ _ .JJrJ' {'p~ . .l $i ,!1'l/' ~"7 " ~ 'f ~i~:ii~~ • • Sa.tir... .....~rr ~^-~F . ',~.r y * `.iiii " ~ ~ I ~ I + ' _ _ . . . , _ . . _ , S A N [ : ~ t C7 U N ri ; Y - , ' UrTIcc Or CO[1NIY EN(;irvFaEK • A DIvISiuN Or 11 « I'uu11c WaRKs Ur•rAxTtiIFUr Rnnald C. Ilcirn»nn, ['.E., f'uunty Fnbiiseer Dennis M. Sca►t, ['.E., DirEetur Arn EEMcNT TO rAY rrEs ENGINEER'S AGREENiENT NtJnTI3ER ~~~7 ~ C~ . Ttus agreement between SPak Cuu~Uy aiid , ~ume o ptrson ~ whose interest in Uie project is ~2-~-C (t.e. awiier, Abeu , c is entered into tiiis 6 day c►f 2" f Gze"1 , 19~~. Tliis agreei»eat is applicable to tlie project known as: '41z . t~cTi~~~cs i~ s ' or enami &Tile uuui ,er --kProJec n Tliat ilie indivicluafs aiui parties named lierein as having an iiiterest in ilie abgve desc:ribecl prnperly nr project agree to tlte followiug: 1. Reirnburse Spokane Caunty fnr prUjec:t review and inspectinn fees as speciCed in Cliapter ~ 9.14 nf the Spokane Couiity C'ocle. '!'he fees wili be based nu actual salary costs iucurred by Spokane Caunty for project reviews anci / or iiLspeCtinns plus a ten percent adaiinistrative cliarge, ancl will be billed moiitlily as accnieel. Any billing ainounts dile, inc;luclitig any expc:iises ineurce:d in ilie c;allec:tiun at aii uverdue ac:cuuiit, iuust be paid prior tv tlie Cniitily's ac:ceplaiicr uf tlie praject for filing. If a pruject is appruved aiid/ur filed witli a balanCe stiil owing, tlie uiipaid balanee stiali be paicl wittiin 30 days af tl» invnice date. 2. Tlie undersigned agrees Ilial tlicse fecs are cltie aiicl nayable upnn receipt uf ilie billing as specifiecl above. 3. Any invoices not paicl witliiii 30 dgiys of tlie itivnice ciate will be eansicierecl deliiiquent. If any oulstancling balance nii ilie acc:nunt f4r lliis prnject is nut paicl williin 30 cfays af ilie inyoiCe; date, no further reviews of ilie prajec:t clncuiuents will be eniiduc:tecl uiitil tlie entire account bAiance is paicl. Any balance on the aCCount for tliis project aut paid wit1i'ttt 65 days of tlie invoicr ciate may result in legal actiUn car ilie iiiiiiatiuii uf utlier collection proceclures, inclutliiig rel'c:rra! to a collection agency. 't'tle Spaiisur wili Ve liable for any aucl all expenses incurrect by the County for ilie cullection of overciue accounts. 4. Tlie niontlily bilting s id be senl tu lhe atte ition of: ~ NAME: AUI)RESS: Cl'!'Y, S'I'ATE: . ` ZlP COnE: PIiONE I unclerstand tliat failure ta pay ttiese fees »>ay resiilt in delay in coiupletiwi or approval of tite project or otiier possible sanctions. ~ Q lf this fee agreenieiil is coniplete.d by sc~meoiie Utlier tiian ilie Sponsnr (i.e., ilie pruject owner or a principul in (he firi» spnns()rin e prnject), sucli as the Engineer clesiguing llie prnject, then written aulliorizatic?!14 rocn tli Sponsor spcciticaliy authoriziiig tlie Agent tu execute tlus 1~'ee Agreeiu it iy attac;h d ta lliis f~e Ag e n~nt. SIGNA'1'UItH B ~ r l p ~ (PRINT NA - RETI,IRN YEI.I.OW COPY 710 Sl'OKANE COUN1'Y CNGINLCRS k1A1t1agreemen.fre 211195 1026W 13rnaciway Ave. • Spokane, 1NA 99260 Ul'40 • (509) 456,3600 Fr1X: (`iU)j 324 34l8 'l'I )i (509) 32.1 316o •Aj ~ S i' C3 K t J OfflC& OF 1*1 iC CUUNI"'Y ENGINl'sEli • A DlVeIC)N UI• 111E I'UnUC WUltaS DNWARlh1[NT Ranald C. Ilurmaiin, I'.E., C'o►uity Cngioieer Uennis M. 5eatt, I'.E., Uirectar AGnEEMElvT TO rAY rcEs ENGINEER'S AGItEChiEN1' Nt1RiBEit i C) -1~7-4 , . This agreement beiween Spok Cuuuty aiid . 1 ~muie o ' Person • • ~ • whose lnterest in the prnject is ~-~-C- _ ~~~t- J (i.e. owner. agell is entered into this ~ day of 19 2~12. This agreenieiit is aPpiic:abte tn the prujec:t known as• ~ ~~projeZT'a~c7l~~or flename arc rue auutuer) That ilie indivitfuals aud parties narned Iiei°ein as liaviiig aii interest in ilie above describecl praperty or project agree to ilie fullowing: 1. Reimburse Spokane Cuunty far project review aiid iiispeclioli fees as specifiecl in Cliapter 9.14 af ttie Spnkane Cuuuty Cade. 'Che fees will be basecl ou ac:tuai salary custs ineucrc:d by Spakane Cuunty for project reviews aiul / ur iuspec;tiniis plus a te~l pel•cent admiuistrative eharge, ancl will be billeJ moutlily as accrLiecl. Any billing amounts due, iiiclucJitig any rxpenses iiicurred in [lie cullectiun of an overciue accuuitt, Ililt5l be pdld priur to the County's acceptance uf ilie project for fiting. IF d project is approved and/or filed witti a balarice still owiiig, tlie unpaid balaitce sliatl be paicl witlkin 30 days nf tlie invoice date. 2. 7'Iie unclersigneci agrees tliat these fees Are diie aiicl payablc: upau receipt of ilie billing as specifiecl above. 3. Ariy invnices not paid witliiii 30 elays of ttie iiwuic:e eiute will be cvnsiLlececl cleliiiyuciit. lf any outstandiiig balanc:e un tiie ac;c:nuiit far iliis prujecl is not paict wi[hin 30 ciays uf ilie inYoice da[e, no fiirllier reviews of ilie project docwnc:nts wiil be cnnJuCted until tlle entire accuwlt balanee is paid. Aity balanc;e nn liie accnunt fnr ttiis project not paid within 65 days nf ilie invoicr date iilay result in tegal aetian ar it» iriitiatian of utlier collectian procedures, inctLiding referi•al to a cvllectian ageitey. The Spnnsor will he liable for any ancl all expenses iiicurred by the Couiity fur ilie cullecliem of averdue aCCOUnts. 4. 't'lie mantlily billing s o Id be sent tc) tlie attc: ilicin uf: U NAME: -to ADI)RESS: ~ l Cl'1'Y, STATE: - ~ Z1P C4DE: t'IIONE I understand ttiat failure ta pay ttiese fees may result in delay iii rumplelion or apprnval af ilie project ur other possible saiictions. • C] If this fee agreenleiit is completed by soineoiie otlier tliaii lhe Spn«snr (i.e., ilie pruject owner or aprincipal in the firiu sponsnrin e prnject), suc:ti as Ihe Engineer desigiiing ilie prnjeCt, tlien wrilleri atitliarizaliol rom tlI Sponsar sl»cilically auilioriiiiig ilie Agent tn execute this H'ee Asrecui ;it is attac;h d ta tliis Fe ~ Ag SIGNA7'URE E3 ~ ~ (PRINT NA - RETURN YEI.LOW G4PY 7'0 SPnKANE COIJNTY ENGINCCRS k1p%tlagreemen.fcc 2/I/95 1026 W. Diuaclway Ave. • Slioi:ane, 4VA 99260Ul'7U •(Sll9) •1.56•3000 Fr1X: (509) 324 3478 71)1): (5p9) 32-1 Ei1Gfu w r S I' q K A N~ C~ L~ ~T T Y DNISIOTf OF ENG4'+7EERING AND ROADS • A Dlvtstmr oF'rHE AL*BLIC WORKS DEPARTMENT William A. Jnhns, P.E., County Engineer Dennis M. Szott, P.E., Uirector July 11, 1996 Peter Kruse, P.E. Rauner & Associates Darryl & Dorothy Price 11920 East Mansfield, #55 Spokane, WA 99206 SUBJECT: SP-1054 Submittal Not Accepted at This Tane Gentlemen: We have conducted a cursory review of your recent submittal for this project, aad we have found items which do aot appear to meet the minimum standards of the -~pokane Count-t Standards for Road and Sewer Construction. We are, therefore, unable to accept your submittal at this time. The attached comment list contains items of concern which we diseovered during a cursory review of this submittal. You should be cxrtain, before you resubmit the plans and calculations for this project, that your submittal meets the requirements of all appticable agencies. When the plans are resubmitted. olease mark all chanizes on the revised nrine in calor. If you have any questions about this review, please contact Ed Parry at 456-3600. Thank you. Very truly yours, William A. Johns, P. E. Spokane County Engineer P.C. Edward J. P r. , P. E. Plan Review Engineer encls: Plans (l r,et) cc: pro}ect file reviewer (coaunents oaly) 10261o1a Broadwuy Ave. • Spakane, WA 99260-0170 •(5U9) 4563600 FAX: (509) 324-3478 TDD: (509) 324-3166 w REVIEW CONZMENTS SPOKANE COUNTY DIVISION OF ENGI]NEERIlVG & ROADS 1025 W BROADWAY, SPOKANE WA 99260-0710 PHONE (509)456-3600 FAX (509)324-3478 SUBMITTAL 1 REVIEWER: Ed Parrv PROJECT SP1054 DATE: 11 Julv 96 PROJECT NAME: Hertin/Price Short Plat N.B.: Since this project is governed by the edition of the Spokane Counry Standards for Road and Sewer Construction (the "Standards", adopted 2 May 95, with an effective date of 15 May 95), these comments are general in nature, and do not represent a Iisting of all items which may not be in compliance with the Standards. The responsibility for ensuring compliance with the Staadards lies solely with the Sponsor's Desiga Engineer. ALL DISCREPANCIES MUST BE ADDRESSED AND RESOLVED PRIOR TO PLAN ACCEPTANCE PROJECT DESIGN 4. Driveway elevations should be provided 5. Drainage Report: a. Ditch sizing calcs were not included in this submittal b. The Bowstring calcs indicate that drywells are needed; if a retention pond concept is intended, then the County Engineer's approval of a design deviation request is needed. Retention poads are typically based on a I00-year storm event superimposed over an annual water cycle 6. Basin Map does not have elevations or contours to support basin limits indicated 9. The certification statement required by the Statulards was not provided on the plans or calcs 11. Need to provide Fire Distcict approval 12. Copy of ingress/egress easement is needed Other: a. The Statement of Agreement for Construction Services needs to be notarized, per the format providei at the pre-design conference • ~ , f S~ C~ I+M ~I R(]AD & DRAINAGE S[xBAffrTAL CEIEC PRQ.IEC'T # 01Y09-'T PLA'p NU • SF' (05+-9i 4a DA'TE. „1uAJ ~ Ze., t?716 PROJECT NAME: kERt-t /Pieteg SNa Ai PLA-T FROMCT SFQi,TSOR: f 1''i N~g LWA) . TEL. # !40 35 PRt}JECT TNGINEBR: PCT"- KQ+uS6 - Pl"R- RAMER F J455 oc • TEL # q° '4 ` 5?"{v t (R,oad 8i Draiaaga Pians) I ~1~f33EC'T SUR'`E~OR- ~Y~°1.D5 - ~'AV(. ~2A/?'fER P. Assa~, TEL # MU) PLEM FRtlVIDE A RESFONSE TO EA►.GS QF TSE FOLLQWING ITTiVIS. GENERAL ITENiS Y=14hw 0 wA D 1. Asiped "AGREEMI'+I'T TO PAY 1IZES" foan has bm submiued to Spokane Cannty along witb any applicable plat feest paor tv anp pre4%ignlpresubmitta[ meeting lvts N ro 0 xrd Cl 2. Y hade a r.opy of, and have reviewed the most rreccent ooud,idons of appmval and any IISIMDNS requixments and cand,itians of appmval have heen incorpomced ia this plan submittal. FROJEC'I` DEStGN Y-m 14 rva 11 w-t 11 I. Ihave compteted a rninimum of Qne pre-design meering with Spokaue Coanty Devel4pment Engin.eering 5erviccs Engineers where a,gw=ent was reached oa drainage design approach. va 0 Ho QMAX 2. I have included the rescflts of azry geotochtucai testing tbat is requited by the design appiaach rao verify design parameters. ,ra Q No El ruaX 3. 1 tia+ve inciuded any required pavemeat design caiculatiuas oa new Public roadways as requ,ired by thc »spoKANE cOuNTY sTANnAIRDs rOR RaAn► AND sEwER cONSTxucTrvr-, latest edluoa ,ra 0 ero Q Hrx)Q 4. 'I'be road and drainage plm comply with the"S'I'A►NDAR,D ROAD FLAN" requi.rmencs far plan, profile. and typical cross section etemeous contained in"SPOKANE CDUNTY STANDARDS FOR ROA,D AND SEWER CONSTRUCTIClN" lamst edition ercegt as altawed thmugb approved design deviations. ,r"9r+D 0 ruA CJ S. The drainage repnrc i=orporates the minimum cequirements for a storm drai.nage analysis as aocte+~d in the GSM aad other itemEs which are appmpriace to decnonsrrate clat the design meets a11 re+qniremet= of the Spolcane Cauaty Guideli.nes for Storuwater Management except as allawed through approved design deviacions. v-Am 13 cr« ~ 6. A cvmplete draimge basin map with time of couceneracion gaft sbown has been incZuded wirh the detail.ed tiydmlagy calqfttious. Dminage 6asin map shows tapograFhY, proposed dcainage feaures, aud camqares with hydmiogy calculatians. Yes Q ro El r+uA ~ 7. Ali appticable traffic signing reqairmeam are met and have been iflcorpomted ia the p)an subzaitw. ve. a rrQ 0 ruAK I have iacluded copies of all appraved DF,SIGI+t DE'PIATIONS which am required for this prajecr, ,r.w)qm Cl rra 0 9. 'Me plans and drainage c+eport are sta,mped, signed* and dated, and con.taius, the apglicable certification srate=nt. vagri- 11 Hrw Q 10. Y have iuc[uded au adequate erosion coatrol pian and applicabie stant9ard plan notes. v« 0 rft 13 ruAX 11. I harre secured appmvals fram all apglicable outside agencies such as fim districts where applicable and have inciuded prvo€ of their approwa.ts,. ,r-A rb Qw^ El 12. 1 faavp- grovided an acceptable me,am for perpetnW ~nain~e~e of suva and cirainage facilities chac is acceptable tu Spokane Cowniy and have secwnd and ' luded co i+es of anp r~quired eas~ments. a ❑ ~og owniE~s wL~.r- r,r~,a 1ri7pt,j stn+e,~' Rrv~j ,pr tc~1, Y~~ w,~ 13. i have reviewei the. pians, calc"ans and other nbmittal dam fior oampleteaess, accuiacy aBd coasismnfiy and bave subniitted two copies of glam aAd (1) botufd drainage teport. i!clcptarv I.0fMay45 7.. ii. . ' I understand, that the, c89uirements. noted above are ttie minimum cequirements.aecessa.ry ~to pecfo~ - a- cursory review vf,the, psojecc- plans, and tfiat -Additional iafocmadoa-should' be:~included- vi+ith chis"submittal. as. na:essary: I undecstand ttiat;thi,s submittal will.be cbecked for completeaess,,prior - to review; and .tliat it will, be reauaed :for further infoahaaon if it'is.%fuund to be incomplete. I, undeistand'that'this submittal will'not be, a_ccepted for,veview (and placed on-the reQiew Iist) unti!-aU reqn;red infurtiiat;an has' befn sviimit#ed. Form compleced by, the' cespoasible. Engineer: - - - - ~ne~r.•- /Y~ , j~KSe~ Company: ~~A~L ~A/~'I~IL. ~ 1455_aClA_~ES ~ ING. - Address: . W. 'ra 1,1S NEWPoR-Ir P16NWAi ~50D'K!° IJC, IiVAsl1 95Z.08 Zip, code, - )FOR.STaME COUNTY . SUBMITTAL: : Accepted for review. Rehuned for subaiittal of the -following: ~ GENERAL ITEM # : - PROJECT, DESIGN RESLTBM ~ITTAL ITEM, - Form returned'-to: ' ~ • ~ _ _ Company: - • _ _ . Ad'dres,s: Dam:, ~ - By,: Spolcane.Counry~Public'Wor_ elopment~Setvices uckpwai.0nHay.95 2 I J. Paul Ramer'-& Associates; I'nc. LETTER OF °rRANSMI1-,-AL Consu1[ing,.Ci0-~Eri4ineers Cand'Surveyors 'M. 101,15 Newport Nighway Ma'iting Addr~,,P.O. Bar 18779 DATE JOB NO. Spo~kane; Washieon 992080179, ~uNE Z4 ~Q.?(O D-'~4~ - Phone, (509):.467•5161 ~ fAII, 461.-5262 ATTENTION- ED AARQY TO SPoK/0Nf ~p. .~Nl~1N{~2S • RE SP - 105+' 9(0 .EOW ~IV ~kbAO.t~JA_ ~ . , J11N~ 8 f996 ' GENTLEMEN: WE ARE-_SENDING YOU El Attached O Shop drawings. C P,rints ,12y Pians, p SamplesQ Specifications -0 Copy,of letter ' L Change order° COPIES I DATE I PAGES I, OESCAIPTION _ ? _ &/z~/9~ r~' PRArAIAe.£ s-l,voY Z 001A)A66 PzaPi ~ .(,/~'~~,9(0 ~ _s~8/►1,~ 7TAt, c ,NEc.K usT - THESE ;ARE TRANSMITTED as :checked below: ,X ,For,approval" ❑ For your, use 0 As requested O For review.and comment D REMARKS' - COPY TO - .SIGNED: 4tZ4, If enclasures are not as noted, 'klndly notily us' at once. (r - MAILING ADDRE55: OFFiCE LOCATIQIV: P.O. BOX I8779 N. IQIIS MEWPORT HW1°. SPOKANE. WASHINGTOfV 99208 5('OKANE. WASHINGTON 99218 hHONE (509) 467-5261 FAX (509) 467-5262 & CONSIJLTING CIV1L ENGlNEERS & LAND SURVEYORS WASHINGTON • IDAHO Project No_.96142 June 20, 1996 DRAINAGE STUDY . for Short Plat N0. SP-1054-95 Portion of NE1/4 of Section 19, T25N, R45E, W.M. Spokane County, Washington .16 . . ~ ~ ~oF wAStk,~, s ~ - ~ ' ~ Q . 0023636 ' • ~~ss Fo,STEA~ RECEIVED N~LZp•z7•9` JUH 2 8 EXPIRES 01/22197 ~ inS - Prepared for-: SPOKANECOUNTYENGjryEEA Jim Herlin and Dorothy Price - E. 11920 Mansfield, No. 62 Spokane, WA 99206 - (509) 924-6035 ' _ . ;IAL PUBUC DpCUME(YT . ° T *•"aE COUNTY ENGM&tM OFf1CE OR ~ N µb r_ ~?'i1L ~ ' ~~T'i iRN TO COUNTY ENGfNEEA "S/ fE ' ~ ~ o • ~ ~ ~ - . aa0u ~r • ~ , • • p _ • . • • i ` • • • s a ~~,o s ~ • • • ~ - ~ ~i s • • • . ~ . _ ' ~ • , . • 1. 2045 ' a` ' ' ~ • c oSPRAGCJE • ' ~ • ~ - p ~ ~ • • • / ~ ~ ~ ~ O • • a • ~ t' ~ ~ _ O C •O G ~ ~ , Tra - ~ I O ° er ~o . a . . . • ~ 2051 . ~ ~ . . Park ~ . . . . . . . = .r ~ . . ' ° ■ D o . . ~ ~ . Q ,2o6C , . ~ ■ • o ~ . , ~ • • , . • • • • ` 2081 S.e-' D isposa I _ , . . ~ -Gravelr 1 , - ~ ~ ~ ~ ♦ ~ ` , i ~ ^ ` ' ~ - _ ~ • ~ _ 1~ I\ L A _ • /~i ".`f~`` • 9 ~~„'I ' •i= ~ _ _ = = ~ i" t , ' ~ ~ , _ ~ ' 2300 8 M 208 ~ ~ . ~ . ~ '~~~r " _ ~ 1' ~ • ~ , ' ~s ~ _ I~ / ~ ZL~! ~ • ~ . ~ L''~1 L HCINITY- ~ - e~~TE - ~ ~.rW 'ly ~ 2-` ~•Y~ _ . ~•r ~ ~Si'~`-: "T~, . ~ -Y~ , Q+~ - ?~•5~_ ' ~ ~9"' - . +i ° . 1 _ti ~ t:{y~°J• " ~ ~ SJ• . C-"jr: ~~7R / a f r ~ ~ ~ ~ y~ . / • l.~ ~ ~ ~p+' ' ~1. ( ~ 4 ~ A`Y,~- 'C_ • r .3 s M~~t , ~"~Z ` . ~ry f \ ~i~r ~ ~ .ite t`~ ' ' ' ~ e ``1 ~ .3+! r ~ E' . 't~ ' \i``C '„6'= ^ x'~ 7,`•' ~ _ R~#_a...r.- y < • ~ . ' h„~,ti,,_~,^~~ •^S' ..'r ,'tia'„ r ~C~ ~ ` :q1 ..w - " -~tic, l , , " •~`s ~ t 1_ s~„~ ' . a16 ~ ~ u , ~ f ~ . ' ~ " ~ - • ~ . . a~`_ ? t ~ - b, - • _ ~ i ' _ ~ . ~ 1 , ' ~~`G~ttB r`~-~'~ - <x~',-_•-,~ , ~ _ , r, . , = i,';, ' ' 3 i ,~`'o, -i ~,c ~~T~ x~;>~ ~ ` ' ~ . . G . ~ ^ Y : ~ - . . "',.z, • ^ '~oc~ ~-~-r. ~ : ,*r~ ~ x < , ' . _ q ~ ~ : 'r' - . _ "~'.~~,N": -~1 • ~ ' `i ^ J !"~L~'~; tiy' t," r {'La►+~ ~ _ :r .ur~...--y~~aR1i Ro - .1I~ ' ;W e Ro U Pltcg ' R . - ,~o ;NtB~ . . ~i` e. ~ . ` ~ a . r` ~H 1'-, ~ S•; ~ - ~ psb 6s8. , y ,r ` ~ ~ .C~_c~•_,~i ' . _ ~ ~HP~► • ' / y • ' , : l ~r~~-.., ` J f, ~ ~ - gsB gsO .~vl~.~? ~,z,~.,,,,.. " ~ ~ . , • ~ ~ ~+nA ~ f' ;r , w _ ~ • ' ~ ~ C,~j, ~ , , rhl _ _ ` ;i , • _ t,; ~ , ~ • ~ ° ' - k , ~ `5~~' , • , ~ Z: - ~ 4 - - µaC: ~ , ~ . - , "~s ~ _ ~s ~ , s' - - , . , , ~ • rB~ , ~ j._ l < , j _ . %c - F~`- . ~ ~if~ , ` ' ~ ; , _ , : ' „t jSu i',,+:''F-~r~ • ' ~ ~-n , T3~'' ` ~ . 'r _~i' ~ ~ ~`v • s . ' H1t~' } " y. ' s+~~ ~ t~TT~-,r'1 _ ~ • , " , ~~~~-e^- ' ` \ 1 ° ~'~s~~f ;~~D~ , ~l?-~ a , ; } ` ` . - • - 'p~sp► - ~ - ..c it.'' r `y ` , . ~1 ; , = o 13s8 _ ' , _ , • = ° ' ~ t' ~ .f ~ ~ ' ` ~ , _ _ ,~1. i' Sg$ ~ pgP` _ J . - - . - ' •a • - , % - ~ 1 so ILS ' y ~ _ PROJECT.AND SITE DESCRMPTION - Stiort' Plat. No.. SP-1.054-95 is a 3 lot r-esidential short.plat s~i:tuated on, approximately 1. 00, acre in- central_ Spokane County. -The •site- i-s situated south of' and adjacent_ to, Sprague Road-, aiid , approximately- 160' 'feet east, of Moen St=eet*, in, ,the Northeast quarter , of, Section 19:, Towriship 25 North, -Rang.e. 45,. East, W.M., Spokane. Count.y, 'Washing;ton. The. property, -is surro,unded by developed s.ubd:iv-isions . . ;The proposed 'site i's relatively, I lat,, sloping, slightly to the: _north. The slopes on the site ;run between ;,0$ and 3~~. 'The "soil in this a=ea is -mainly comprised :of Garrison gravelly loam' ( GgA This soil- is excessively',well drained and. has moderately rapid permeability. S.urface -r.un-off is,. slow, and the hazard of eros-ion is. s 1 ight.: - . , t , _ ; . ' C`~,l- METHOD OF MANaGEMENT The stormwater analysis criteria used for this site considered the following factors: 1. The lots in this plat are served by a private driveway serving 3 lots or less. _ 2. The site for this project does lie within the Aquifer Sensitive Area, therefore stormwater treatment swales will be used. 3. The site for this project lies inside the PM-10 zone as established by the Spokane County Air Pollution Control Authority (SCAPCA), therefore the private driveway will be paved with asphalt concrete. 4. The site is relatively flat with slopes between 0t and 3% and have been field verified by site inspection by an engineer in our office. 5. Stormwater will consist of mainly on-site due to the topography and development of the area. The property is surrounded by developed subdivisions. Calculations were made to determine a relationship between existing = conditions and the proposed developed conditions._ All factors used • x in determining the numbers for the developed conditions are very conservative, allowing for the maximum developed condition to be calculated. A pre-developed "Q" was calculated to be 0.60 cfs, and the developed "Q" calculated to be 0.71, for an increase of 0.11 cfs, or 18t. By treating the run-off from the private road, 0.37 cfs of the overall basin will be contained and disposed of and the developed run-off will be less than the existing._ A temporary swale will be constructed 3n the northwest corner of this site to collect and dispose of stormwater. At the time that the existing trailor along the west property line of Tract "A" is no longer needed and is removed and the temporary easement is vacated, the driveway will be constructed to extend along the - westerly property line and the swal.e will be reconstructed to be in - • alignment with said driveway. _ - O _ • a ~ rr W~'l 'r j a - ~ ~ r • ! ; ~ ~ , ~ 0 co / ~ ~ ,~y ~ 1 ; , f ~ ; ~ , ~ / ~ 1 ~~,'r ~ OJ T ~ ' Q ` • ~ . ~ yf^ co , . 00 o ~ ~ ' ~ Q lt n ~ ii u~ a * O ( , • ; , ~ t~ , , a 1 ; ~ , ; , ~ , ~ ~ r • ~~i , ~ ~ ~w ~a q tp ~ ~ II ~ , ~ ~ • ~ i i ~ ~ ' ~ ~ ~ ' r ~ ~ ~ • ~ . ~ ~ ~ ~ ~ , ~ ~ II °'~t ~ ~ ~ ~ ; ~ Z ~ ' ~ ~N` ~ ~ ' • . ~ + ' Q ~ ~ ' 'f ~ ~ ~I ■ ~ ~ ' « M ~ a ~ C ~ ~ , / 0 ~ + ~ ~ • ~ ~ ~ I , r ~ - . / • ~ ;q 000 o ~ ~ • ~ 1 ~ . ~ ~ / , . ' • ' ~ . ' a~' ~ `~y, ~j ' < < t`;~, ` ~ ,i ~ ~~~•~r ~ ~~~s~~ ~n~ * p~~ ~ I 1\~\ I ~ ~I i,.. lb ~ ~ ~ , p ~ • ~ : • W ~ ~ ~~l ~ ~ ~ r ""1 ~ ~ ~ ~ ~ ~ ~ • ~ ~ 0 ~ t ~ ~ • ~ ~ ~ ~ ' ~ 'Oo T r ; S ' ~ ~ ► ~ ` : ~ , p , ~ ~ ~ i Q ~ ~ 'fl p ' ~ ~ + ~ • N ~ ' ~ , ~ . ~ , c i"1 , ~ • ) - ~ ~ ~ , , ~ , r p . , . ' ~ 0 ~ • ~ ~ N ~ ~ ° ~ 0 ~ , + ~ ` ~ , " . C3 G ~ ,J0 4I ~ ' < ' , I ;°os ' ~ . ' , . . ~ / ~ ~R • ~ ~ . ~ • s ' , ~ d 1 }M 1 0 0 • ~ ~ ~ ~ ~ ~ ~M " 2 r,•or f ry ~ ~ ` ( .1,; • ~ ~ . ooa' r ~ w • ♦ ! j . ~ . ° ~ • . . ~ a ~ ~ ~ ~ 'o X . • S ' 1 • o ~ ( I ~•~C i ~ • p ~ ,s ~ 0 • ~ ~ p y ~ , 0 ♦ 0 • ~ p ~ ~ ~ • ~ ~ , l ~1 l~L \ i Q • , , ~ ~r r ~ • ~ ~ ~Y ~ I ~ .s' 3 ~ ~ j ~ . , ~ f > ~ yl p~~ i ~ ' ~ ~ '..y '~~,~~~I r• , Cl) , ~ ~ • ' , ~ ~ ?'1 ~ 0 r • + ' ~ ~ ` ~ ,b . ~ , ~ • , ~ ` , , ~ ~ ~ • ' ~ ~ ` ~ • ~ D ~ p ' ~ • + ~ i -e, ' ~ , ~ . ~ ~ ~ .M ~ • CI~ ~ j~~/~ r ~ ~ , ~ ~ 1 ~~'1 P ~ „ ~ ' O ~ - !v ' ~ 116we ~ i~' ~ • • ~ ~ ~ , ~ ~ ~ ~ ; • ' ' ` ' ~ ~ ` . ~ . • , ~ ~q 0 , ~1~ 0 Q ~ ~ ` i ~ ~ ~ ~ 'a. ~ 0 0. ► . . i . 1 ~1 ~ a. ' ~ ` O, ~ • r~ ' ~ , ~ ~ _ ~`'s,. Q ~ • w ~ ~ ` ? {7 • ° Q ~ R ' • 0 ~ • / ~ , , . : ; ' ,;..,r~•,,/~ , , , , ~ ; , '11 ~ , ! a i , , Q • ' • y. ~,~,N"; , . ~ ~ ~ ~~r• . , .T• ~ ~ ~ , ~ ~ ~ w ~ ~ ,Q ~ 0" • ~ll r , ' , ...~~:...,'00 SPRAGd . . ~ ~ A vEAlUf - . - , - - - ~ o ~ o ~ •i ~ ~ ~ ~ , - - ' ~ • ' , 000- F,UT06E ACQUfSITlO1Y AREA T.EAOPORARY. DRAINAGf sWA'tE rr.J BORDFR EASEMENT ~ ~ ORAIN4GE,;4WALE ' `SEE OETAfC, TNIS SNEET V ;N~ `-r~ ' ~ • ct k ~_4~~;~~, y0k-► F~•~ ~ " . : QW ~ Ll1t1L%,..j ~ ~ ~ ~ ' - .z . . ~ ~ - . . ~ ~ ~ . ~ : l15.00, , - ~ I . . i ~ . i • n ~ F1RST , + . A VENUE ~ ~ ~ - ~ 1 ~ ~ ~ • :f, ~ + ; . , Sl TE -PIAN 30WSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 96142 )ETENTION BASIN DESIGN BASIN: Existing DESIGNER: G. MILLER NUMBER OF DRYWELLS PROPOSED DATE: 26-Jun-96 0 Single (type A) 0 Double (type B) Total Area (calc.) 1.00 (see following sheet) Time of Conc. (calc.) 11.27 (see following sheet) Composite "C" (calc.) 0.28 (see following sheet) Time of Conc. (min) 11.27 Area (Acres) - 1 C' Factor 0.28 Impe=vious Area (sq. ft.) p Volume Provided 208: 320 storm: 480 Outflow ( cfs ) p Area * C" Factor 0.28 TIME OF CONCENTRATION (minutes) - Tc (overland) Tc (gutter) Ct = 0.15 L2 = p Z1 = 1 L1(A) = 380 Z2 = 50 N(A) = 0.4 B = 0 S(A) a 0•0129 I1 = 0.016 S = 0.008 'c (A) = 11.27 d = 0.10 • D L1(B) = 0 TC (gu) = 0.00 N(B) = 0.4 Tc(A+B) = 11.27 S(B) = 0.15 Tc(tot.) = 11.27 Tc (B) = 0.0 Intensity 2.12 ' Areas "C" A*C A - 0.255 - WP = 5.1424 _ A 0.95 0.25 0.2373 R= 0.0496` _ B 0.02 0.90 0.0216 V= 1.12 . C 0.03 0.90 0.0243 Tc(gu) = 0.00 D 0.00 0.00 0.0000 Q(est) = 0.29 - E 0.00 0.04. 0.0000 . 0.00 0.00 0.0000 Holding = 0.00- - ' 0.00 0:00 0.0000 ' - Total A Comp "C" - 1.00 0.28 Q=C*I*A= 0.60 Q(est.) = 0.00 0 • . . iOWSTRING METHOD (TEN YEAR STORM DESIGN) PROJECT: 96142 IETENTION BASIN DESIGN BASIN: Developed DESIGNER: G. MILLER NUMBER OF DRYWELLS PROPOSED DATE: 26-Jun-96 0 Single (type A) 0 Double (type B) Total Area (calc.) 1.00 (see following sheet) Time of Conc. (calc.) 11.27 (see follawing sheet) Composite "C" (calc.) 0.33 (see following sheet) Ti.me of Conc. ( m.in ) - 11.27 Area (Acres) 1.001 - C' Factor 0.33 Impervious Area (sq. ft.) 0 Volume Provided 208: 320 storm: 480 Outflow ( cfs ) 0 Area * C" Factor 0.33 TIME OF CONCENTRATION (minu-tes) i Tc (overland) Tc (gutter) Ct = 0.15 L2 = 0 Z1 = 1 L1(A) = 380 Z2 = 50 N(A) = 0.4 B ~ 0 S(A) - 0.0129 n = 0.016 - s = 0.008 = 'c (A) = 11.27 d = 0.10 = L1(B) = 0 Tc (gu) = 0.00 N(B) = 0.4 TC(A+B) = 11.27 S(H) = 0.15 Tc(tot.) = 11.27 Tc (B) = 0.0 Intensity 2.12 Areas "C" A*C A = 0.255 WP = 5.1424 A 0.22 0.275 0.0553 R= 0.0496 B 0.09 0.90 0.0783 V= 1.12 C 0.13 0.90 0.1188 Tc(gu) = 0.00 _ D 0.04 0.75 0.0293 Q(est) = 0.29 . - E 0.52 0.1-0 0.0522 - _ 0.00 0.00 0.0000 9 Holding 0.00 - - 0.00 0.00 0.0000 Total A Comp "C" 1.00 0.33 Q=C*I*A= 0.71 Q ( est . ) = 0.00 ~ IOWSTRING METHOD (TEN YEAR STORN3 DESIGN) PROJECT: 96142 IETENTION BASIN DESIGN BASIN: Driveway ' DESIGNER: G. MILLER NUMBER OF DRYWELLS PROPOSED DATE: 26-Jun-96 0 Single (type A) 0 Double (type B) Total Area (calc.) 0.13 (see following sheet) Time of Conc. (calc.) - 5.00 (see following sheet) Composite "C" (calc.) 0.90 (see following sheet) Time of Conc. (min) 5.00 Area (Acres) - 0.13 C' Factor 0.90 Impervious Area (sq. ft.) 5665 Volume Provided 208: 306 storm: 346 Outflow ( cfs ) 0 Area * C" Factor 0.12 =~=-==-====-c~~==~===~====~~=~=~=a=~a==a=caa==~aaacao==aaa=-=c-~a==== #1 #2 #3 #4 #5 #6 #7 - Time Time Intensity Q dev. V in V out Storage Inc. Inc. (min.) (sec.) (in./hr.) (cfs) (cu. ft.) (cu. ft.) (cu. ft.) (#1*60) (A*C*#3) (Outf.*#2) (#5-#6) - 5.00 300.00 3.18 0.37 150 0.00 150 5 • 300 3.18 0.37 150 0 150 10 600 2.24 0.26 184 0 184 15 900 1.77 0.Q1 208 0 208 20 1200 1.45 0.17 221 0 221 25 1500 1.21 0.14 227 0 227 30 1800 1.04 0.12 231 0 231 35 2100 0.91 0.11 234 0 234 40 2400 0.82 0.10 240 0 240 45 2700 0.74 0.09 243 0 243 50 3000 0.68 0.08 247 0 247 55 3300 0.64 0.07 255 0~ 255 _ 60 °3600_ 0.61 0.07 264 0 264 ' 65 3900 0.60 0.07 281 0 281 ~ 7p 4200 0.58 0.07 292 0 292 75 4500 0.56 0.07 302 0 302 80 4800 _0.53 0.06 .304 0 304 85 5100 0.52 0.06 316 0 316 90 5400 0.50 . 0.06 322 0 322 - 95 5700 0.49 ' 0.06 333 0 333 100 6000 0.48 0.06 343 0 343 lo ►RAINAGE POND CALCULATIONS Required grassy swale pond storage volume ~ Impervious Area x.5 in./ 12 in./ft. = 236 cu. ft. provided: 306 cu. ft. DRYWELL REQUIREMENTS - 10 YEAR DESIGN STORNd Maximum storage required by Bowstring= 343 cu. ft. provided: 346 cu. ft. - Depth of storage swale = 0.50 ft Number and type of Drywells Required = 0 Single 0 Double TIME OF CONCENTRATION (minutes) Tc (overland) Tc (gutter) - Ct = 0.15 L2 = 322 Z1 = 2 L1(A) = Q Z2 = 3 N(A) = 0.4 B = 0 S(A) = 0.0129 n = 0.03 s = 0.0129 Tc (A) = 0.00 d = 0.31 l(B) _ : 0 Tc (gu) = 3.48 N(H) _ 0.4 TC(A+B) = 0.00 S(B) = 0.15 Tc(tot.) = 5.00 Tc (B) = 0.0 Intensity 3.18 Areas "C" A*C A = 0.24025 WP = 1.6735 A 0.00 0.00 Q.0000 R= 0.1436 B 0.00 0.00 0.0000 V= , 1..54 C 0.13 0.90 0.1170 'Tc(gu) = 3.48 D 0.00 0.00 0.0000 Q(est) = 0.37 E 0.00 0.00 0.0000 0.00 0.00 0.0000 Holding = 11.47 0.00 0.00 0.0000 . Total A Comp "C" . • 0.13 • 0.90 - Q=C*I*A= 0.37 Q(est.) = 0.37 J~ ~ Aq, S P O K.~ Nz O LJ N T Y DEPARTMENT OF BUtLDNG avD PLANM;vC • A DIViSIQN OF THE PUBuC WOus DEPART.mENT JamEs L. MaysoN, C.n.O., DsREcroR DENvrs M. Scorr, P.E., DMEcnoR MA`" ~u b TO: Spokane County Division of Engineering aad Roads, Pat Harper Spokane County Division of Utilities, Tim Red Spokane County Health District, Steve Holderby Spokane County Division of Building and Planning, Jeff Forry Spokane County Fire District No. 1, 10319 East Sprague Avenue, Spokane, WA 99206 Consolidated Irrigation District no. 19, 120 North Greenacres Road, Greenacres, WA 99016 Centra! VaUey School District, 19307 East Cataldo, Greenacres, WA 99016-9423 . FROM: Julie Krause, Planne►~~ DATE: May 7, 1996 SUBJECT: Proposed Final Short Plat SP-1054-95 Piease review the attached proposed final short plat and forward any comments by May 14, 1996. If you have any questions regarding this plat, you may contact me at 456-2205. Enclosures Copy without enclosures to: Dorothy J. Price, 11920 East Mansfield„ No. 62, Spokane, WA 99206 Pairick Moore, Inland Pacific Engineering, 747 West 7th, Suite 200, Spokane, WA 99204 FCU-5P I054 FGVAL SP MEMo 1026 WEST BROADWAY :3VENL'E • 5POxANE, WasHNcTON 99260 BUILDING PHONE; (509) 456-3675 • FAx: (509) 4564703 PLwNvING PHO,%T-: (509) 456-2205 • Fax: (509) 456-2243 ' t . ~ ~ . . RECEIPT Dote---~ - ~0 19, 9003 Received From ' ~ , . ~ 1 • ~ . . . Ac+dress co'- 4 . . . - ~=J L~, ~ ra;, .fr' L•~- f Dollars $ ~ For . ~ qCCp{jW HOW PAID AMT. ~OF I CASH • ACCO.:NT - / ;.M1. .'.11D CFIECK I -~l+ I • ~ f /I ~ BA UNCE I ' e~R MONEY fR DY ~ ~ . • ~ _ 8K808 aREMq3~0 . e . • ~ ~ ~ ~ ` • ~ _ ~ • • , - - -JAMES=L. HERLIN 1:2:37 ~ ~ . . . . . ' DOROTHYTPRtCE, - - - - - - - - - i9~709~/3Yso. . . ~508=924-8o35P • _ - _ rE.1192A MANSFiELD'SP:.62 - - SPOK'ANE WA 89206• -."0001 _ - - - - ~,-t%C~--- . ~ ' - -OA. DER=OF ! S - 1fllASHINGTOPI' lIAUTUAL AFederat 8anst~ ~ M _ H•+20o~Swsvuo.Avetws- a.,,~ _ - , T ~ _-_'sa~ane..w4•se21~` - _ _ - - - - - - _ - - , 10:4_7181.6,~~r ~ L- 2`3=7 - ;..A,en..~ . - ~ , . ~ . . Sp,okane .-County ~~~taf~ l~eview Checklis~ -for Pre=SubmAttal .Meeting . .Project'Name:' Pro ect Number-: - - ~ . Pioject Sp,onsor:: Sponsor's'Engineer: . Des!.gn - Firm:, Engineer. -04 Meeting~ Date: _ 9' ~~P_-~ ~ 'Meeting- Time: Courity Staff~~Present atiMeeting:. , Other Mee,ting-.At''tendees: aenielrepresenting~ mamelcepresentiag uairie/reprpsenting nanieJrepresenting ~ ~ The-Following Items:~need~.to -be-;Dis,cussed-_w/ the Design 'Engineer , ~ G`eneral Items .1. _List any;special requirements; listed, in the Conditions. of Approval, EIS; or 1VIDNS. iescription, reference description refereace deseription mfertnce description reference descripvon ref~rence . 2: Give Standard Notes to the Design, Engineer.. Identify, which Special.Notes w'i_ll apply,; -if any. . Road Plans 1: Road Classificatiomand'Design Criteria. :#1 #2 #3 #4 - - ~ Street Ivame ~ - , Classification Roadway Width; W~ ~ 11• 1~ - ~ - _ Muiimum right=.of-way, width - - - fseenote (1) . Mri. Horiz: Curve vv/ super :Niiri: Ho .riz: Curve w/o super :General L- and .SlopfeJ'Terrain FtAl- Design Speed, mph. Cucb: Ty,pe Clear Zone (see. S,ec. 3.1.5) ~ ,Sid"ewalk_reQuired?' (yes/no). 4,Co - - - - - - ~ Note (1) Additional-'ri ght-of way maybe'given by the Sponsor-. Discussion:. - 10l ~~f ~~~fta~ ` ~/I~TD G~i~'l • ~ 4 ___P f ~ I . 2. According:to the.Design, Engineer wt'hat;is the maximum-number ofunitswhich will have access.fr=,a: What is the*max. allowed per ~~Sec. ~1.03.?~ ~ . - ~ 3.. - M'inimum irttersection sP gs_3 acin 00' -for- along -a PrinciP . - - - - al or Minor Artena-l. (P_ _ ~ er .Sec. '3.04),- 'and T50"for a Collector or I.ocal Access street. What_spacing,is provided for:this.project?~ . I - ~ I 4:, Are-any off-site slope-easements needed; or off-site right-of-way, acquisition.needed? If so,. describe. !hg'Ttc S;V What type..of turn-arounds, are.needed? (i.e.: cul-de-sac, hammerhead, e'tc.) , ',Street Name Turn-around ,Type~ Location - - - I~e FD .6. Road Surfacing Requirements (Sec: 3..1.6) ,CkwJ& ~„r • ID ~5. a), 'What method 'in determining road:surfacuig:requuments .does theDesign .Engineer propose- to, „use '(:e. AASHTO Design Method; R-value, County 4hickness table,,or ot}i.er)?` b) Provide, the Design Engr: a copy -of the Soi1='Sample.:Proc,edures, .Design Repor,t; Format. & -Alternate Pavement Design.Table. 7. Does the Engineer plan-owapplying, for any Desiga. Deviations?,,If.so;briefly, describe, below. Storin Drairiage 1. Basin Map a) Did the Design Engineer bring..to the meeting,,a .basin map? --6 . If so,, does-.the basin map show ,topography and~-suffi-cient information to be.useful? , b) . Does, the, basin map.depicvany contributing off: site cunoff flowing onto the property? 4W Does -it appear to lie, correct? If not,expl"airi, - - c) Is a site visit nee ed to verify, the.basin)imits? - Nlk Schedule~for-:, . 46o, -tmTccN . 1N ft4 am O'3 ~ &50 er'L Fxw YN easTreitTloj _ 2. Is tlie~ site located within the. Aquifer Sensitiue,Ai-ea (-ASA)? bgS . What type of water quality treatment is. proposed by 'the Design-. Engineer?~~ ~~A-AA---A ao6 *-okt.s i , 3. What subsurface. invesdgations, =if any; are needed with~'tliis projec't to make sure,the. ~proposed disposal proc.ess will.~functi'on .as..planned. 4. Are there downstream conditions which will affect the design of drainage facilities. If so describe possible mitigative measures. NI;06 5. Is maintenance access provided to each `208' swale or drainage pond? If there is something unusual, what requirements were given to the Design Engr.? ~~~SwAz-E Gcut'narl fiWWM ~ ~'uo►~I ~Mr~~rt . /I;u.~~6 6. What does the Developer/Engr. propose for providing for perpetual maintenance of the drainage facilities? Please briefly describe proposed mechanism, and what is needed to accomplish this. $*?N~4" ~ ~ ~ ~w A--f r 7. Are Erosion Control Measures required with this project. If so, briefly describe applicable requirements. ppofr kto 5eucmcKf - cA~ kmCrr 4~ M,cc+O aKr 8F 5Az%ctc A,,e. ~ ,*7F kw*%s Nole: Plrovide a copy of this completed document to the Design Engineer at the end of the pre- design meeting. S'jeQg Ae%g 434eat' : sTrmwW -2DB &*wOtsakt,~ ,W%fj Ws74T : to wr tZ~l~cdAJ s~~i~ PMU'aO ' ~2 ~ 0~t, ~ IF 60 va.~,mE c*~ Z.ro ~S f~~~► ~ t~ WSV'tJ ~ ~,u3µar~o • ~ N . ? ~ ENGINEER' S REVIEW SHEET AS BUILT PLANS RECEIVfiD SHORT PLAT FILE #SP4054 ~ Related File # ( CUE-53-89 ) AA1tD # ( ) Date to Review 02/29/1996 # Date to AA & DR Time Date Received 02/15/1996 Project Name RES SINGLE No. I.ocs 3 No. Acres 1 Range - Townsbip - Section SITE ADDRES3 S SPRAGUE E 182121E MOEN/W GREENACRES P~CEL Applicant's Name DOROTHY J PRICE Phone lf 928-9150 Address 11920 E MANSF[ELD #62 Phorte Z# 924-6035 SPOKANE'WA 99206 . FLOOD ZONE No W 4 S 1 School 356 Date Conditioas Mailed `,t Billing Name Owner DOROTHY J& DARRYL FR E°gineer Addres,s A,ddress 11920 E MANSFIELD #62 Company Address Signed Phone 924-6035 Pbone PboneIFAX Date Building Contact Person: Phone # 456-3(~,.,5 Date Submitted Description Inirials DATE FEES RfiCENED DATE ARIORITY FEES RECENED COPY TO ACCQUNTING ~ FIIVAL PLAT FEES COMPLETED & COPY TO ACCOLINTIN NOTICE TO PUBLIC # 13 4 6 COMPLETED - OR NEEDS TO BE SIGNED 1?ESIGN DEVIATION SUBMITTED/DATE COMPLETED - MAILED ALTER.ATIONJ TO PLAT - BLOCKS & LOTS BONU QUANTITTU FOR DRAINAGE ITEM CALCULATED ~ DATE BOND ItECENED - BOND AMOUNT RECFIVED DATE BOND RELEASBD - DATE AS BUILT RD PLANS HEARlNG EXAM APPROV&D )EN1ED 'PEAIED 8CC APPEALBD PROTECC 4kPPROVED ENIED STAMPED MYLARS TO PERMiT TECHNiCiaN (SYi./SUZANNE) STAMFED 208 LOT PLANS TO ADMINISTRATIVE ASSISTANT (SANDY) t rf►~t& A (-S&j~ c , c;?A, ~'b ~ • W~404 w+WUA4 ~ 2v~~~6 # I~ ~ GA►~ ~ ~ ~,o P4 - 72 y S'J ~•Q~ ~ ~ A . ~ •Je~ - ~ --7 . ' „ ]PLAT NAIVIENQ* STATiS°I7CS - DATE Plat Check Fee Ac r2 -D 'p Number'of:Lots J , - Road N.[iles, (IVew) Tbtal:Area.' nI[AP North Affow Scale Legend a Procedure& & Equipment Basis'.of-Bearings~- Plat Locafion'By Title ~ Ofiicial.Signature-Blocks. rR ` Siuveyors~ Certificate Road.:Names I n, 1 C ( i . Road Widths J . , Ailjacent_ Area Lot -Block Numbeis R/W Dedicanon 'designated - - - 1 Foot -Strips 3 RPS,.on GLO Corners Trac1-X ~f Lot Areas Bench-Maik Closure DEDICATION Description (To Map) Description (To Cert) O.wners ~ Certif cate to, Plat _ '4 1-7 - ~ Q3 1 Foot Stript ~l RID - CP-k,Statement ~ 0 Access Profiibited nl. - R%W Dedication n : Drunage'Lafiguage. Drainage.Covenant # Flood lnsurance 208 Bonds - S1,000:00 ea _ -208 PLANS APPROV ED PrivatefRoad Doc. #'s Private'Road Warning ' tA, Road Plans Road Bond Improvement 14 Road Sond-Inspection - M- Signed By Engineer ~c _ ~.'2Ce- ~ L ~o~aa c~ a ► ~ ~ e ze., n1c ~ Av o i tvc i , W\nptadiscA9/95 D 1 C • - F/RST AMERICAN TITLE 11VSURANCE COMPANY EAST 40 TRENT AVENUE SPOKANE, WASHINGTON 99202 (509) 456-0550 SUBDIVISION GUARANTEE ORDER NO.: 114511-SS PROPOSED PLAT: SHORT PLAT 1054-96 LIABlUN: $1,000.00 FEE: $150.00 TAX: $12.15 FIRST AMERICAN TITLE INSURANCE COMPANY, a Califomla corporation, herein called the Company, SUBJECT TO THE UABILITY EXCLUSIONS AND LIMITATlONS SET FORTH BELOW AND IN SCHEDULE A. GUARANTEES J. PAUL RAMER & ASSOCIATES. herein called the Assured, against actual loss not exceeding the ilabgity amount stated above which the Assured shall susta(n by reason af any incorrectness In the assurances set forth 1n Schedule A. UABIUTY EXCLUSIONS AND UMITATIONS 1. No guarantee is glven nor tiability assumed with respect to the validiry, legal effect or priority of any matter shown herein. 2. The Company's liability hereunder shall be limited to the amount of actual loss sustained by the Assured because of reliance upon the assurance herein set forth, but in no eveM shaii the Company's liability exceed the liabflity amount set forth above. 3. This guarantee is restricted to the use of the Assured for the purpose of provid(ng tiUe evidence as may be required when subdividing land pursuant to the provtsions of Chapter 58.17,R.C.W., and the local reguiations and ordinances adopted pursuant to said statute. It is not to be used as a basis for ctosing any transactlon affecting tide to sald property. Page 1 SUBDIVISION GUARANTEE ORDER NO.: 114511 •SS SCHEDULE A The assurances referred to on the face page are: A. TiUe ts vested in: DARRYL S. PRiCE AND DOROTHY J. PRICE, HUSBAND AND WiFE. B. That according to the Company's tftle plant records relative to the following described real property (tncluding those records maintained and Indexed by name), there are no other documents affecting tide to said real property or any portion thereof, other than those shown below under record matters. The following matters are excluded from the coverage of this guarantee: 1. Unpatented mintng claims, reservations or exceptions in patents or in acts authorizing the issuance thereof. 2. Water rights, claims or title to water. 3. Tax Deeds to the State of Washington. 4. Documents pertaining to mineral estates. DESCRIPTiON: That portion of Lot 1, Block 26, COR61N ADDITION TO GREENACRES, according to plat recorded in Volume'S" of Plats, Page 30, in Spokane County, Washington, more particu{arly described as fallows: BEGINNING at the Norihwest corner of said Lot 1; thence South on the West line of said Lot a distance of 379.7 _ feet; thence East parallel with the North line of said Lot a distance of 115 feet; thence North parallel wnh the West line of said Lot 379.7 feet to a point in the North Iine of said Lot; thence West on the North line of said Lot, 115 feet to THE POINT OF BEGINNING. Page 2 ORDER NO.: 114511-SS RECORD MATTERS: lA. General taxes. The first balf becomes delinquent after April 30th. The second half becomes delinquent after October 31st. Year: 1996 Amount Billed: $195.26 Amount Paid: $0.00 Amount Due: $195.25, plus interest and penalty, if delinquent Assessed Value of Land: $12,000.00 Tax Account No.: 55191.0401 1B. General taxes. The first half becomes delinquent after April 30th. The second half becomes deli.nquent after October 31st. Yeaz: 1996 Amount Billed: $79.70 Amount Paid: $0.00 Amount Due: $79.70, plus interest and penalty, if deli.nquent Assessed Value of Impravements: $59000.00 Tax Account No.: 55191.0401R 2. Irrigarion Assessment. The first half becomes delinquent after Apri130th. The second half becomes delinquent after October 31st: For: 1996 By: Consolidated Irrigation District No. 19 Amount Due: $218.00 Tax Accouni No.: 55191.0401 NOTE: There will be a penalty assessed by the County Treasurer if the above assessment becomes deli.nquent. 3. Said premises lie within the boundaries of Consolidated Imgation District No. 19 and are subject to future assessment by said district. 4. Reservations and/or Fxceptions contained in i.nstrument: Froin: Spokane Valley Farms Co. Recorded: December 18, 1924 Recording No.: 778961 Volume/Page: 409 of Deeds/598 Page 3 ORDER NO.: 114511-SS 5. Easement and conditions contained therein as granted or reserved in instrument: In favor of: The United States of America, its successors and assigns Recorded: November 19, 1964 Recording No.: 64647C For: To construct, reconstruct, operate and maintain an irrigation turnout and appurtenances Affects: The North 20 feet of the West 20 feet of Lot 1 6. Title Notice and the terms and conditions thereof: Filed By: Spokane County Planning Department Recorded: October 27, 1994 Recording No.: 9410270143 Regazdi.ng: Special development condition for said premises which are available for inspection and copying in the Spokane County Planning Department. 7. Deed of Trust and the tenns and conditions thereof: Grantor: Darryl S. Price and Dorothy J. Price, husband and wife Trustee: H and L Services, Inc. Beneficiary: The Prudential Home Mortgage Company, Lnc. Origi.nal Amount: $45,000.00 Dated: November 20, 1995 Rec4rded: November 28, 1995 Recording No.: 9511280048 Volume/Page: 1798/ 1144 8. Establishment of a Temporary Easement: Dated: February 22, 1996 Recorded: February 22, 1996 Recording No.:P 9602220213 Page 4 r ORDER NO.: 1145;11-SS N,OTES: 1. Inquiry-should be made of the.Spokane County .Utilities4t (509) 458=2538 to ascertain if-any user fees :rela _ting-`to the~~aquifer protection.area -are, payable at this time. Any such~-Amounts Imay becorne liens -upon the,property, at a'later date: Eftective.,Date:,Aprii 17, 1996 at 8:00 A.M. CC: Spokarie. Courity Engineers Spokane .Counfy',Planning Mr, 410_Hedin . :First A-merican Title I:nsurairce,,Cornp"y ~ ~,a'~ , : • • • • • • . , ,'?.s9 , ~ ~ . y°~`.4 . . ~ ~ - , ~ • a 6Y - PRESIDETJT ' c 6 1968 .a - ' ~ : 1, _ ~ f ~ - ASSISTANT SKRETARY t cAl I F O.~A'~p Page 5 CORBIN PARK TO GREENACRES _ The Company hereby reserves and the Purchaser does hereby grant unto the said Company the rights of way now or hereafter deemed necessary by said Company for the construction and maintenance of irrigation f lumes, ditches and pipe lines over and across the above described land for the irrigation of said land as well as other lands, with the rights and privileges to enter upon said land for survey, location, construction and repair of said irri- gation conduits, either by the Company, or by the owner or owners of lands served by them. This deed is also made upon the express condition that this deed and the lands herein described are subject to all the rights, privileges, duties, liabilities and obligations of the parties to this deed as the same are now contained in a certain contract dated July 5, 1923, made between the Spokane Valley Farms Company, a corporation, as party of the first part, and the Community Service Company, a corp- oration, as party of the second part, now of record in the office of the Auditor of Spokane County, Washington, in Volume "X" of Miscellaneous Records, at page 282 thereof, and that all subsequent deeds conveying said land shall be made subject to said contract and said contract shall run with this land with the same force and effect as if the said contract were expressly written in such deed. Every sale of land in Corbin Addition to Greenacres shall carry with it as a part of such transaction, stock in the Community Service Company at the rate of one (l) share of stock for each acre of land sold, provided that in sales of less than one acre a full share of stock shall be issued for each tract. And the party of the first part hereby agrees to transfer to the party of the second part with delivery of deed 3.03 shares of stock in Said Community Service Company. _ All the covenants, terms and conditions, rights, privileges and burdens herein mentioned shall inure to the benefit of, extend to andbe binding upon the parties hereto, their heirs, executors, administrators, grantees, successors and assigns respectively. Provisfons common to lots in Corbin Addition to Greenacres imposed - prior to February 15, 1950, as follows: 1. That all buildings built on Lots 17 to 34 inclusive in Block 12, and Lot 24 to 46 inclusive in Block 15, shall be constructed of brick or fire-proof material. 2. No property sold in Corbin Addition to Greenacres shall be used for business purposes of any kind prior to January 1, 1929, except the property specified in paragraph one preceding and except Lot 1 to 10 inclusive in Block 12, Lots 1 to 10 inclusive in Block 15 and Lots 1 to 23 inclusive in Block 23, provided however, that this shall not prevent the owner of any tract of land in said Addition form selling the products raised by such owner on said tract. 3. No dwelling shall be erected or permitted to remain on safd land of less cost than $1,500.00; however a temporary house may be built and used for not to exceed two years. All buildings must be painted or stained. At least one-half of said land shall be improved within two years from date of purchase. • ~ ST ~M ER~ , ~ 1 . ~ L First American Title CornPany of SPokane East 40 Trent Auenue • Spokane, WA. 99202 o (509) 456-0550 • FAX ~509) 747-2761 ~ VOLUME ~ PAGE ~ SECTiON TOWNSHIP RANGi N. B.v -,r i A.v - - i /I#. J! 174P. OI S Pi 'W4 ,g K ~ ; ~ O . ~ ,,a % M ' ~ 2 0 10 2~ e' ^ , j ~•t 9 is ` ~a~. A ♦ 4 re 4 (D s = C~~ , ~ ~ 1 AvE a I31. I ~ 8d I-0 ^ . 0 5 , ? z ~ 40 IND . w Q 134.49 A ~~2 t g o ^ a A o a~ 4 4 ~ G O y A O ~ w~/ / ~ ~ • " ` ~ " - ° N ~ 6 s ~ , 2 *vo A VE O y~ ~ve9~ /0.1.ls ~ .or ` io,~ ~ _ ~ 4 ~ ~ z02- 03 3 ~No~~ Z 6 4 Y 3 ~o,~ : 1~0 ~0~ 34 ' z 3 4-t 3 6 ' 0'° 2 ~o. • 1 ~ iir. _ L .o /.f ~ 3 ~ v ~ s ~ Z6 • 6 /.s 4 ♦ ' a). M•.oa iw. b ~ + `O / ~ t 4'~y~ V•y ► 43- _ 7 ~J v' ; ~ L+ 1 a U~M913 f ..l~.9 • ..lB- ;u~t~► » - - - - , ~ - - - - - -o- •~~l r ~ ~ t~~~ .t.l..~~ /If 3-~..~• ~ ~ This sketch is fumished as a courtesy only by First American Ttt1e insurance Company and ls NOT a part of any titte commftnnent or policy of tMe insurance. Thts sketch is fumtshed soleJy for the purpose of asslsting ln locating the premises and does not purport to show ati h(ghways, roads or easements eHecting ihe property. No reliance should be piaced upon this sketch for the location or dimensions of the property and no liability ls assumed for the correctness thereof. - - ^ t , FRQM AhJGLF Dr-ST Nfl'RTH LAST TC) SIP1054 P1_Ai' BCJUNDR'{ 25-8--036 D. B. AUTO INUERSE •x STfa'RT ;~~►0. 0 0 C)t?:L-A 5000. OOOcl.iC~ I 1 I NV 1\1 0, 00 24.0 b1 379.6300 879.63000 499, 95583 2 ~ Z iiV S 89 377 56.0 E 113.121000 878-. 831 83 6 t 4. 9 .5 ;4 c+ 1 3 I•~iI,l s 0 QF0 ;'2 4. tl E 379. 6?00 -i, 99. 12 6 18 614.. 99763 4 EH INV N 89 317 5E:+. QI IrJ 115.0000 a~.~0. tZ 1 0 Q) ;1C~ 500. 00000 ,,5 a0~2~. C~C"~ft►C10 500.00000 2 i`~~ CLQSURE ERr QR Area = f} sC~5'6. 552 sq ft 1.00222 ac M I ' ~ ► S C3 K ~ N t--- t C 7 l .1 N ~'I' 'y . Qt•'hlt°E AF TI IC CUUNTY ENt;INEhlt • ~ A UIYISICaN OVA 11F. PUBI 1C WnRkS T)LTAR'Tr1ENT Rnnald C. i lorrtiann, ['.E., Cciunty Engineer [?ennis M. Scott, P.E., Uirector AGREEMENT TO PAY TEES R ENGINEER'S AGREEMENT NUMBER a This agreement between pokanf! County aiid ate u persun ~ whose interest in the project is '~~~6'°~F , tt.e. nwaer, age . e . is entered into this 6 day nf 291 zo-C-r r , 19 This agreement is applicable to the praject known as: tProJ~ ~`ii ena ~ i e num er That the individuals and parties named herein as liaving an interest in the above described property or project agree to the followiug: 1. Reimburse Spokane Caunty FAr prajec:t review and inspection fees as specified in rhapter 9.14 of the SpokaQe County Crde. The fees will be basecl nii actual salary casts incurred by Spakane County for project reviews anci / or inspeclions pius a ten Percent administrative charge, and will be billed monllily as accrueti. Any billing amounts due, inciuding any expenses inctirrecf ia tlte cullec:tion af an averdue account, nwst be paid prior to the County's aceeptance of the prnject fnr filing. If a project is apPraved and/ar filed with a balance stilt owing, tlie unpaid balance shafl be paid within 30 days of the invoice date. 2. The undersigned agrees that tliese fees are due and payable upan rec;eipt oi lhe billing as specirieci above. 3. Any invoices nnt paicl witliin 30 days of the invoice date will be cansidered delinquent. If any outstanding balance vn the account fAr this project is nat paid wiUiin 30 days af the invoice date, no turther reviews of the project documents will be canductecl untii the entite account balance is paid. Any balanc;e an the aCCouat for itiis prvject nnt paid within 65 days nf the invpice date may result in legal actinn nr the initiatinn nf ottler collectioa procedures, including referral to a collectian agency. Tlte Sponsnr witt be liable for any and all expe«ses incurrecl by the Cnunty fur tue col[ec;tion of overdue accounts. 4. The monthly biliing s Id be sent tn the atte tion of: ~ NAME: ADDRESS: ~j. C1TY, STATE: ~ i$~i~ ~ ZiP CODE: PEIQNE 9,;2 I understand that failure to pay these fees may resutt in dc:lay in enmpletion or approval of tlie praject oc olher possible sanctions. Cl If this fee agreement is completed by sameane otlier lhan the Sponsor (i.e., the project owner or a principal in the firrri spansarin t11e project), such as the Engineer designing the project, then written authnrizati~ rom th Spnnsor speciticaily aulhoriZing tlie Agent to ~ecute this ~'ce Agreem t is attach d to tliis Fe Ag e nent. ~ : SIGNATURE ' r a ~o . ~ ~ . (PRINT NAC RETURN YELLOW COPY TO SPOKANE COUNTY CNGINCERS, k1pNf\agreemen.fee 2/1/95 1026 W. Brnadzvay Ave. • Spokane, Wd1992G0-ql7tl •(SA9) 956-3600 rt1X: (509) 324-3418 `I [)I): (5U9) 324- 31 fiU ~ • ' ~ • . RECEIPT Date--,5'- ro 193-fp 9003 , ' - Re-ceived From - ~ • • ~ ' Ad dress 4 • _ Dollars $ , /M - ' For ~ /~~•Q-'~ ~ ~~G "'r Ct-, 1 sp lQ5 ~ ACCOUNT HOW PAIO AINt. QF CASH I accoUNt ^ / I AMT. ?AID j C. ; CHEUC ~ ~ • I~ aawNcE MoNEY g ~ 4UE ORaER Y ~ ~ ♦ ~ 8K808 IP4MT<MM1O - • ' • ~ - - . _ , , - ' ° , ' _ JAMES=L. HERLIN - ~ - • - - - . DOROTHY PRICE ;q.7(W~ 5o3-9244036 _ ~ - . e - - E.1.1920: MANSFIEL• D SP: 62 . , SPOKANE. WA 89206 • - _ . pairro-rwE/y . "OROFR'OF. r " ~ / • ~ - ~ •"/~'6ph~ .~.~-~QQL,WRS- / r> r . ~ wasHiwcroN. MunuLL - - ~ ~ " A Fo40~C1 Seyq~ 8~tlk 9pal~ens valleyfhtertetal Cemor 50B• -spaknn0. wR~ ~2ts-0~7-- - ~ - -r- - - ' . _ FOR - ~ _ - - - , .,..,..o.~......~.~,~...~ . . ~ . - ~ ~ • ~ BEFORE THE SPOKANE COUNTY DIVISION OF PLANNING RECEIVEp IN THE MATTER OF ) FINDINGS OF FACT, MAR 14 1996 SHORT PLAT NO. SP•1054-96 ) CONCLUSI011TS AND Dorothy Price ) DECISION THIS MATTER, an applicadon for subdivision of land, from Dorothy Price and decided upon, pursuant to Spokane County Subd.ivision reguladons, on the . day of March, 1996. FINDINGS OF FACT AND CONCLUSIONS 1. The individual signing below has further been properly delegated the r+esponsibility for rendering the decision by the Spokane County Director of Building and Plaaning. 2. The proposal is to divide approximately 1 acre into 31ots for r+esidential uses and those uses permitted in the Urban Residential - 3.5 (UR 3.5) zone. There is currently an existing house, aad an earisting trailer (Dependent Relative Pe,rmit CLJE-53-89), on Parcel l. 3. The proposal is located in the Spokane Valley, south of aad adjacent to Sprague Avenue between Moen Street and Greenacres Road, in the NE 1/4 of Section 19, Township 25 North, Range 45 E.W.M. Spokane County, Washington. 4. The existing zoning of the property described in the application is Urban Residendal - 3.5 (UR 3.5). The subject property was previously establisbed Agricultural in 1957 (File No. 286-57) and redesignated to Urban Residential - 3.5 (UR 3.5) on January 1, 1991, pursuant to the Frogram to Implement the Spokane Counry Zoning Code. Pursuaat to RCW 58.17.195 the proposal does confarm to the requirements of the existing zone. 5. The Spokane County Comprehensive Plan designates thi.s area as Urban. The development and uses, as proposed and conditioned are in compliance with this category. 6. Surrounding uses consist of residendal uses. 7. The required public notice was provided for this proposal and agencies having a potential interest in the project were norified and recommendations solicited. No comments were received from adjacent property owners. 8. The Spokane County Arterial Road Plan identifies Sprague Avenue as a Minor Arterial - with a future right of way width of 80 feeG The existing right of way width is 60 feet. In order to impiemeat the Plan, the County Engineer has requested that a strip of property 10 feet in width along the Sprague Avenue frontage be set aside in reserve. This property may be acquired by Spokane County at the time when Arterial Improvements are made to Sprague Avenue. As condidoned, the proposal conforms to the Plan. The County Engineer has also designated a Minor Arterial Roadway Section for the improvement of Sprague Avenue. This will reqaire the addition of approximately 13- 15 feet of asphalt along the frontage of die development The construction of curbing aad sidewallk is also required. 9. The site is located within the Public Transportation Benefit Area (PTBA). 10 The proposed short plat will be served by a public water system, requi.ring only simple connections. Waste water disposal will be as authorized by the Director of Utilities. 11. The locadon of an existing "dependent relative" trailer on Parcel A resulted in having a temparary 15 foot wide driveway easement 15 feet from the existing house, which does not comply with setback standards. To compensate for the setback, the applicant was required to record a document with the County Auditor stating that the said driveway easement is temporary and subject to closure given specific conditions. In addition, a 15 foot wide easement to serve as permanent access for Parcels 2 and 3 was established along the east property line of Parcel l, thereby in the long term meeting setback standards. More specifically, the recorded document (Auditar's Recording #9642220213) states the following: FIlVDINGS AND DECISION SP-1054-96 Page 2 A 15 foot temporary driveway easement shall be established thmugh Parcel 1 to temporarily serve Farcels 2 and 3. Said easement shall be physically closed and vacated when either of the following apply: a) the Dependent Reladve Pernut is no longer valid; or b) the existing property owner sells Parcel 1 of Short Plat 1054-96. In the event that either occur, the existing property owner of Parcel l shall, prior to the amsfer of dde of Parcel l: a) remove the existing trailer on Parrel l; b) physically close to parcels 2 and 3 and vacate the 15 foot wide temporary easement; c) niake the roquired physical improvements to the pesmanent 15 foot wide easement tio serve as pennanent access for Parcels 2 and 3; and d) record with the County Auditor a document that renders the temporary easement null and void. Said document shall reference Auditor's Recording #9602220213 assigned to the temporary easement document. In addition, a copy of said docwnent shall be fumished ta the Division of Building and Planning for file number SP-105496 for recordkeeping purposes. 12. The Central Valley School District has commented on the proposed Short Plat. The District has indicated that acisting school facilities are inadequate to serve the proposed short plat and wishes to negotiate with the owner to provide adequate capital facilides as required by the Revised Code of Washington (RCV) 58.17.110. Review by County legal couasel indicates the condition requested by the School District can be required for developments. Approval of this short plat should include conditions requiring that provisions for appropriate facilities be in place priar w recording the final short plat in the fonn of a wntten agreement between the owner and the school district. 13. Recognizing the recommended conditions (that the driveway easement serving Parcels 2 and 3 is temporary only) and Spokane County development standards, appropriate provisions should be made Lo ensure the public health, safety and general welfare and that the public use and interest will be served by platting the subdivision. 14. The subdivision proposal is generally consistent with RCW 58.17 and the County subdivision regulations, promoting the public health, safety and general welfare in accorriance with standands established by the state and Spoka.ne County. The Division of Planning has considered the provision of adequate public facilities as cited in RCW 58.17.110 (2). More specifically: - a. open spaces f. sanitary wasLe disposal b. draLaage ways g, parks and recreation facilities . c. public and/or private rights-of-way h. playgrounds d• tca.nsit i. schools and schoolgrounds e. potable water J. sidewalks DECISION Based upon the above nored Findings of Fact and Coaclusions, Short Plat Application SP-1054-96 is hereby APPROVED nntil April l, 2001, subject to conditions noted below. Most of the conditions of appmval shall be accomplished by the applicant and/or sponsor prior to finalization of the short subdivision. This decision is final unless appeaied in writing, consistent with adopted appeal pr+ocedures. The following conditions shall be binding on the "Applicant", which term shall include the Qwner or owners of the property, heirs, assigns and successors. COUNTY DIVISION OF BUILDING AND PLANNING CONDITIONS 1. The groposal aad future development of this pzoperty shall comply with the Urban Residential - 3.5 (UR 3.5) zone, as amended. 2. The f nal plat shall be designed substantially in conformance with the prelimiaary plat of record. No inerease of density or number of lots shall occur without a change of condition application submittal and approval. FINDINGS AND DECISION SP-1054-96 Page 3 3. The Planning Director/designee shall review any proposed final plat to ensure compliance with these Findings and Conditions of Approval. I ~ 4. The preliminary plat is given conditional approval for five (5) years, specifically to April 1, 2001. The applicant may request an extension of time by submitting a written request approximately forty-five (45) days prior to the above expiradon date. 5. Three (3) current certificates of title shall be furnished to Spokane Division of Planning prior to filiag the final plat. 6. Appropriat,e utility easements shall be ind.icated on copies of the proposed final plat. Written approval of utility easements by appmpriate utility companies shall be received with the submittal of the final plat. 7. Prior to filing of final plat, the appropriate road name(s) and street address(es) shall be indicated. 8. T'he final plat map shall indicate by a clear, dashed line the required yard setbacks from all private, "Tract X" or public roads. The dedication shall contain the following statement: "Side yard and rear yard setbacks shall be deternlined at the time building permits are requestei unless these setbacks are specifically drafted on this final plat. Tlie setbacks indicated on this plat may be varied from if proper zoning approvals are obtained." 9. A survey is required prior to the filing of a final plat 10. The final glat map shall reference the 15 foot wide temporary driveway easement to Auditor's Recording #9602220213. 11. The dedication shall contain the following statement: "The 15 foot wide temporary driveway easement (Auditor's Recording #9602220213) established to temporarily serve Parcels 2 and 3 shall be physically closed and vacated when either af the following apply: a) the Dependent Relative Pennit is ao longer valid; or ~ b) the existirig property owner sells Pancel 1. In the event that either occur, the exisring property owner of Parcel l shall, prior to the transfer of tide of Parcel 1: a) remove the existing trailer on Parcel l; b) physically close to parcels 2 and 3 and vacate the 15 foot wide temporary easement; c) make the required physical improvements to the permanent 15 foot wide easement to serve as permanent access for Parcels 2 and 3; and d} record with the County Auditor a document that renders the temporary easement null and void Said document shall reference Auditor`s Recording #9602220213 assigned to the temgorary easement document. In add.idon, a copy of said document shall be fumished to the Division of Buiiding and Planning for file number SP-105496 recordkeeping purposes." 12. The owner shall negodate with the Central Valley School District and submit a recorded copy of a voluntary agreement making provisions for public schools prior to finalization and recording of the plat The agreement shall provide a written description of the subject property to which the agreement applies and also state the dollar amount and any oiher agreed to midgating measures. ; The owner shall also notify any potential purchasers who have made an agreement to purchase property within said plat pursuant to the Revised Code of Washington (RCW) 58.17.205, that adequate provisions for school facilides must be made conditioned on a future agreement between the plattQr and school district. Voluntary agreements between the owner and school d.istrict shall conform to the requirements of RCW Chapter 82.02. 13. The applicant shall contact the Division of Building and Planning at the earliest possible stage in order to be informed of code requirements administered/enforced as authorized by the State Building Code Act. Design/development concerns include: ADDRESSING, FIltE APPARATUS ACCESS ROADS; FIRE HYDRANT/FLOW; APPROVED WATER SYSTEMS; BUILDING ACCESSIBILTfY; CONSTRUCTTON TYPE; OCCUPANCY CLASSIFICATTON; EXITING; EXTERIOR WALL PROTECIION; AND ENERGY CODE FINDINGS AND DECISION SP-1054-96 Page 4 REGULATIONS. (Note: The Division of Building and Planning reserves the right to confirm the actual address at the time of building permit.) CQUNTY DIVISION OF ENGINEERING AND RnADS CONDITIONS 1. Th.at conditional approval of the plat by the Connty Engineer is given subject to approval of the road system as indicated in the preliminary plat of record. 2. That drainage plans and design calculations showing the alignment of drainage facilities be submitted to the County Engineer for acceptaace prior to construction and/or the filing of the final plat, Drainage plans to be pr+epared under the direction of a licensed Professional Civil Engineer. 3. No construction work is to be perfonned within the existing ar proposed Public Right-of- Way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer. ~ 4. The applicant should be advised that individual driveway access permits are required ' prior to issuance of a building pennit for driveway approaches to the County road system. 5. Existing County roads providing direct access to the plat shall be paved and/or curbed to Spokane County standands. 6. That sidewalks are required along the arterial on Sprague Avenue. 7. The word "applicant" shall include the owner(s) of the property, bis/her heirs, assigns and successors. To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, jain in and be a willing participant in any petition or resolution which purposes is the fonnation of a Road Improvement District (RID) for said improvements pursuant to ReW 36.88, as amended. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane Connty, the improvements required (ctrb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the nndersigned owner, their heirs, grantees and assigns. This provision is applicable to Sprague Avenue. 9. As an alternative method of constructing the road improvement stated herein, the applicant may, with the approval of the County Engin@er, accomplish the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the mquired road improvement At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision is applicable to Sprague Avenue. 10. That the following statement shall appear within the dedica.tory language of the final pIat: That in consideration of Mutual Benefits now or to be hereafter derived, do for themselves, their heirs, grantees, assigns and successor (s) in interest hereby request and autharize Spokane County to include the above described property in a Road Improvement District (RID) and to support the formatian of a Road Improvement Distdct £or improvement of the road(s) described below by requesting and authorizing Spoka~ne County to place their name(s) on a petition for the farmadon of a Road Improvement District pursuant to RCW 36.88.050, or by requesting and authorizing Spokane County to cast their ballot in favor of a RID being formed under the resolution method pursuant to RCW 36.$8.030, and/or by not filing a protest against the formation of a RID being fonned under the alternative resoludon method provided for in RCW 36.88.065 and Chapter 35.43 RCW. If a RID is proposed for improvemeat of the road(s) described below, said owner(s) and successor(s) further agree: (1) that the improvements or construction contemplated within the proposed RID are feasible, (2) that the benefits to be derived from the fomiation of the RID by the property included therein, together with the amount of any County participauon, exceeds the cost and expense of fonnation of the RID, and (3) that the property within the proposed RID zs sufficiendy developed; provided, themselves, their heirs, grantees, assigns and successor(s) shall retain the right, as authorizcd under RCW FiNDINGS AND DECISION SP-1054-96 Page 5 36.88.090, to object to any assessment(s) on the property as a result of the improvements called for in coajunction with the formarion of a RID by either petition or resolution method under Chapter 36.88 RCW, and to appeal to the Superior Court the decision of the Board of County Commissioners confimning the final assessment roll; provided further, it is recognized that actual assessnnents may vary from assessment estimate so long as they do not exceed a figiue equal to the increased true and fair value improvement(s) add(s) to the property. It is further acknowledged and agreed that at such tune as a RID is created or any County Road Improvemeat project is authorizeti by Spokane County, the improvements required shall be at the sole expense of the owner(s) of praperty within the RID or served by the improvements without any monetary participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. This provision is applicable to Sprague Avenue. 11. The County Engineer has designated a Minor Arterial Raadway Section for the improvement of Spi°ague Avenue which is adjacent t+o the pmposed develapment. This will require the additioA of approximately 13-15 feet of asphalt along the frontage of the dlevelopment- The construction of curbing and sidewaik is also required. 12. The proposed subdivision shaU be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 95-0498, as amended, which resolution establishes regulations for roads, approaches, drai.nage and fees in new construction. 13. The County Engineer has examined this development proposal and has determined that the impact of tZiis proposal upon the existing County Road System warrants the dedication of additional Right of Way and the roadway improvements herein specified. 14. The County Arterial Road plan identifies Sprague Avenue as a 80 foot Minor Arterial. The existing right of way width of 60 feet is not consistent with that specified in The Plan. In order to implement the Aroerial Road Plan it is recommended that a strip of property of IO feet in width along the Sprague Avenue frontage be set aside in reserve. This pmperty may be acquined by Spokane County at the time when Arterial Improvements are made to Sprague Avenue. 15. The applicant should be advised that there may exist utilities either underground or - overhead affecdng the applicants property, including property to be ded.icated or set aside for future acquisition. Sgokane County will assume no financial obligation for adjustime,nts or relocation regarding these utilities. The applicant should check with the applicable utilides and Spokane County Engineer to determine whether the applicaat or utility is responsible for adjustment or relocation costs and to make arrangements for any aecessary wark. 16. The applicant shaU grant applicable border easements adjacent to Spokanne County Right of Way per Spokane County Standards. COUNTY HEALTH DISTRICT CONDTTIONS 1. The final plat shaU be designed as ind.icated on the preliminary plat of record andlor any attached sheets as noted. 2. Appropriate utiliry easements shall be indicated on copies of thc preliminary plat of reconi for distribution by the Planning Departrnent to the utility companies, Spokane County engineer and the Spokane County Health District. Writt,en approval of the easements by the utility companies must be reoeived prior to the submittal of the final plat. 3. Sewage disposal method shaU be as authorized by the Director of Utilities, Spokane County. 4. Water service shaU be cooniinated through the DirectAr of Utilities, Spokane County. 5. Water senrice shall be by an existing public water supply when appraved by the Regioaal engineer (Spokane), State Deparanent of Health. FINDINGS AND DECISION SP-1054-96 Page 6 . . 6. Pnor to filing the final plat, the sponsor shall demonstrate to the satisfaction of the Spokane County Health District that an adequate and potable water supply is available to each tract of the plat. 7. Prior to filing the fuial plat, the sponsor shall present evidence thw the plat lies within the recor+ded service area of the water system proposed to serve the plat, 8. Prior to filing the final plat, the sponsor shall demonstrate to the sadsfaction of the Spokane County Health District that suitable sites for on-site sewage disposal systems are available on ParceLs 2 aad 3. Testholes indicate soils that require 18,000 square feet for Parcel 1 and a minunum of 12, 500 square feet for Parcels 2 and 3. 9. Prior to filing the final plat, the sponsor shall demonstrate to the satisfacdon of the SpQkane County Health District that the existing system serving the residence Iocated on Parcel l is wholly located within the boundaries of the parcel, or proper easements. 10. Subject to specific application appr+aval and issuance of permits by the I3ealth Officer, the use of individual on-site sewage disposal systems may be authoriz,ed. 11. The dedicatory language of the plat will state: "Subject to specific application approval and issuance of pernuts by the Health 4ffioer, the use of individual on-sit,e sevsrage systems may be authorized." 12. The dedicatory language on the plat shall state: "Use of private wells and water systems is grohibited." 13. The plat dedir,ation shall contain a statement to the effect that: "The public water system, pursuant to the Water Plan approved by county anci state health authorities, the local5re protection d.istrict, County Building and Safety Department and water ptn veyor, shall bc installed within this plat, snd the appiicant shall provide for individual domestic water service as well as fire protection to each tract prior to sale of each tract and prior tio issuance of a building permit for each ticact." COUNTY DIVISION OF UTILITIES CONDITIONS 1. Pursuant to the Board of Couaty Commissioners Resoiudoa No. 80-0418, the use of on-site sewer disposal syst,ems is her+eby anthorized. This authorizadon is condidoned in compliance vcrith all rules and reguladons of the Spokane County Health District and is further couclitioned and subject to specific application approval and issuance of permits by the Health DistricL 2. The Dedication shall state! A Covenant Agreement shall be signed stating: The Owner(s) or S uccessor(s) in interest agree to authorize the County to place their aame(s) on a petition for the for~mation of a ULID by peddon method pursuant to RCW 36.94 whicb the petidon includes the Owner(s) property and further not to object by sigaing of a protest petition against the formatioa of a iJLID by resoludon method pursuant to RCW 36.94 which includes the Owner(s) gr+operty. PROVIDED, this condition shall not prohibit the Owner(s) or Successor(s) from objection to any assessment(s) on the property as a result of improvements called far in the conjunction with the formadon of a ULID by either petition or resolution under RCW 36.94. 3. Each new unit shall be double plumbed for connection to futune area-wide collection systenas. 4. Water seivice shall be provided in accordance with the Coordinated Water System Plan for Spokane County, as anaended. SPAKANE COUNTY FIRE DISTRICT NO. 1 1. The Spokane Yalley F'ire Deparament's standards in regards to the turnaround must be met. ~ . FINDINGS AND DECISION SP-1054-96 Page 7 , Approved the ,J I~, day of March, 1996. . i .m Julie . Krause, Planner II %F Under State Law aad Connty Or+dinance, you have the right to appeal this decision to the Spokane County Hearing Examiner Committee. If you desire to file an appeal, you must submii the appropriate Appeal Application together with the required Fee, payable to the Spokane County Division of Plarming, within ten (10) calendar days from the date this decision is signed. Upon receipt of a complete appeal application, a public hearing will be scheduled. If you have any questions, please call the Division of Building and Planning at 456-2205. pc: Caunty Division of Engineering and Roads, Pat Harper County Division of Utilities, Jim Red County Health District, Steve Holderby County Division of Building and Planning, Jeff Forry Fire District #1 Consolidated Inigadon District Central Valley School District Dorothy Price, 11920 E. Mansfield #62, Spokane, WA 99206 Patrick Moore, IPEC, 707 W. 7th, Ste 200, Spokane WA 99204 OFFICE OF THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478 - SLRDTVTSTON A LTCATTnN - TO: Spokane County Planning Department, Julie Krause FROM: Division of Engineering & Roads, Scott Engelhard`✓z DATE: February 29, 1996 SUBJECT: SHORT PLAT 10541-95 / PRICE, DOROTHY The following "Conditions of Approval" for the above referenced subdivisior are submitted to the Spokane County Planning Department for inclusion in the "Findings and Order" should the short plat be approved. E 1 That eonditional approval of the plat by the County Engineer is given subject to dedication of Right-of-Way and approval of the road system as indicated in the preliminary plat of record. E 3 That drainage plana and design calculations showing the alignment of drainage facilities be submitCed to the County Engineer for acceptance prior to construction and/or the filing of the final plat. Drainage plana to be prepared under the direction of a licensed Professional Civil Engineer. E 6 No constructioa work is to be performed within the existing or proposed Public Right-of-way until a permit has been issued by the County Engineer. A11 work is subject to inspection and approval by the County Engineer, E12 The applicant should be advised that individual driveway access permits are required prior to issuance of a building permit for driveway approaches to the County road system. E16 Existing County roads providing direct access to the plat shall be paved and/or curbed to Spokane County standards. E18 That sidewalks are required along the arterial on Sprague Avenue. E19 The word "applicant" shall include the owner(s) of the property, his/her heizs, assigns and successors. E20 To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, join i.n and be a willing participant in any petition or reaolution which purpoaes is the formation of a Road Improvement District (RID) for said improvementa pursuant to RCW 36.88, as amended. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control aad paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This praviaion is applicable to Sprague Avenue. E21 As an alternative method of constructing the road improvement stated herein, the applicant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joining and participati.ng in a County Road Project (CRP) to the extent of the required road improvement. At such time aa an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision fa applicable to Sprague Avenue. E22 That the following statement shall appear within the dedicatory langua►ge of the final plat: That in consideration of Mutual Benefits now or to be hereafter derived, do for themselves, their heirs, grantees, assigns and successor(s) in interest hereby request and authorize Spokane Caunty to include the above described property in a Road Improvement District (RID) and to aupport the formation of a Road Improvement District for improvement of the road(s) described below by requesting and authorizing Spokane County to place their name(s) on a petition for the formation of a Road Improvement District pursuant to RCW 36.88.050, or by requesting and authorizing Spokane County to cast their ballot in favor of a RID being formed under the resolution method pursuant to RCW 36.88.030, and/or by not filing a protest against the formation of a RID being formed under the alternative resolution method provided for in RCW 36.88.065 and 1 ~ SHORT PT.,,&T # 1054-95 / PRICE, DOROTHY 2 Chapter 35.43 RCW. Zf a RID is proposed for improvemeat of the road(s) described below, said owner(s) and succesaor(s)further agree: (l) that the improvements or construction contemplated within the proposed RID are feasible and (2) that the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed; provided, themselves, their heira, grantees, assigns and successor(s) shall retain the right, as , authorized under RCW 36.88.090, to object to any assessment(e) oa the property as a result of the improvements called for in conjunction with the formation of a RID by either the petition or resolution method under Chapter 36.88 RCW and to appeal to the Superior Court the decision of the Board of County Commiesionera confirming the final assessment roll; provided further, it is recognized that actual assessments may vary frvm assessment estimate so long as they do not exceed a figure equal to the increased true and fair value improvement(s) add(s) to the property. ' It is further acknowledged and agreed that at such time as a RID is created or any County Road Improvement project is authorized by Spokane County, the improvements required shall be at the sole expense of the owner(s) of property within the RID or served by the imprvvements without aay monetary participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) yeara from the date of exeeutioa below. This proviaion is applicable to Sprague Avenue. E24 The County Engineer has designated a Minor Arterial Roadway Section for the improvement of Sprague Avenue which is adjacent to the proposed development. This will require the addition of approximately 13-15 feet of asphalt along the frontage of the development. The construction of curbing and sidewalk is also required. E32 The proposed plat shall be improved to the standards set forth in Spokane County Board of Commiseioners Resolution No. 95-0498, as amended, which establishes regulationa for roade, approaches, drainage and fees in new construction. E33 The County $ngineer has examined this development proposal and has determined that the imgact of this proposal upoa the existing County Road System warrants the roadway improvements herein specified. E61 The County Arterial Road plan identifies Sprague Avenue as a 80 foot Minor Arterial. The exieting right of way width of 60 feet is not consistent with that specified in The Plan. In order to implement the Arterial Road Plan it is recommended that a strip of property 10 feet ia width along the Sprague Avenue frontage be set aside in reserve. This property may be acquired by Spokane County at the time when Arterial Improvements are made to Sprague Avenue. E90 The applicant should be advised that there may exist utilities either underground or averhead affecting the applicants praperty, including property to be dedicated or set aside future acquisition. Spokane County will assume no fi.naacial obligation for j adjustments or relocation regarding these utilities. The applicant ahould check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangemente for any neceasary work. SPECIAL CONDITION: The applicant shall grant applicable border easements adjacent to Spokane County Right of Way per Spokane County Standards. PPPP' PAGE 1 09:05:16 20 FEB 1996 Road# Road Names.......... MPoet. Reference Descriptio Road Log Info.......... 44538 SPR.AGUE AV (START) 00.000 HAVANA ST & SPOKANE U 14 PAVED 48 SPRAGITE AV 00.120 DEARBORN RD (END) U 14 PAVED 62 00.250 CIISTER RD (END) U 14 PAVED 62 00.370 CHRONICLE RD (END) II 14 PAVED 62 00.500 CARNAHAN RD (END) U 14 FAVED 60 00.710 MCKINN4N ST (END) U 14 PAVED 60 00.840 HOWE ST (END) U 14 PAVED 60 01.000 FANCHER RD U 14 PAVED 68 01.310 DYER RD (START) U 14 PAVED 68 01.380 DOLLAR RD (END) U 14 PAVED 82 01.430 DAVID ST (END) U 14 PAVED 82 01.510 THIERMAN ST (END) U 14 PAVED 82 01.560 ELIZABETH RD (END) U 14 PAVED 82 01.620 BR.ADLEY RD ( END ) U 14 PAVED 82 01.680 DORA ST ( END ) U 14 PAVED 82 01.750 COLEMAN RD ( END ) U 14 PAtTED 82 01.890 GIRARD RD (END) U 14 PAVED 82 02.000 PARK RD U 14 PAVED 82 SPRAGUE AVE 02.440 VISTA RD & LEWIS RD U 14 PAVED 76 SPRAGUE AV 02.560 SIPPLE RD (END) U 14 PAVED 76 02.590 BESSIE RD (START) U 14 PAVED 76 02.710 SARGENT RD (END) U 14 PAVED 82 02.750 DALE RD ( END ) U 14 PAVED 82 02.860 DISHMAN RD (END) U 14 PAVED 82 02.900 BR 4594 UNDERPASS FO U 14 PAVED 70 02.990 ARGONNE RD (ONE WAY U 14 PAVED 70 03.060 DISHMAN-MICA RD (END U 14 PAVED 80 03.120 WILLOW RD U 14 PAVED SO 03.240 LOCUST RD ( START ) U 14 PAVED 82 03.370 FARR RD U 14 PAVED 82 03.460 SUNDERLAND RD (START U 14 PAVED 82 03.550 WALNUT RD U 14 PAVED 82 03.620 HER.ALD RD (START) U 14 PAVED 82 03.650 DARTMOUTH RD (END) U 14 PAVED 82 03.760 FELTS RD (END) U 14 PAVED 82 03.800 BALFOUR RD (START) U 14 PAVED 88 03.870 RAYMOND RD (START) U 14 PAVED 88 03.990 IINIVERSITY RD U 14 PAVED 88 04.180 GILLIS RD (START) U 14 PAVED 88 04.280 MOFFITT RD (START) U 14 PAVED 88 04.370 SKIPWORTH RD (START) U 14 PAVED 88 04.510 BOWDISH RD U 14 PAVED 88 04.680 FOX RD (END) U 14 PAVED 88 04.750 UNION RD (END) U 14 PAVED 76 04.810 PERRINE RD (START) U 14 PAVED 88 04.870 ROBIE RD (END) U 14 PAVED 88 05.000 SR-27 (PINES RD) U 14 PAVED 88 05.110 HOUK RD (END) II 14 PAVED 86 05.130 HOUK RD (START) U 14 PAVED 86 05.520 MCDONALD RD U 14 PAVED 86 05.580 CLINTON RD (START) U 14 PAVED 86 05.660 MCCABE RD (START) U 14 PAVED 86 05.760 BLARE RD U 14 PAVED 86 05.850 MAYHEW RD (START) U 14 PAVED 86 06.010 EVERGREEN RD U 14 PAVED 86 06.110 BOLIVAR RD ( START ) U 14 PAVED 86 ~ - PAGE 2 09:05:18 20 FEB 1996 Road# Road Names.......... MPost. Reference Descriptio Road Log Info.......... 06.180 BANNEN RD (START) U 14 PAVED 86 06.300 BEST RD (END) U 14 PAVED 86 06.510 ADAMS RD U 14 PAVED 86 06.760 PROGRESS RD U 14 PAVED 86 07.030 SULLIVAN RD U 14 PAVED 86 07.510 CONKLIN RD U 14 PORTLAND CEMENT 44 07.640 GARNINE RD (START) U 14 PORTLAND CEMENT 44 07.910 STEEN RD (END) U 14 PORTLAND CEMENT 44 08.030 FLORA RD U 14 PORTLAND CEMENT 44 08.220 TSCHIRLEY RD (START) U 14 PORTLAND CEMENT 44 SPRAGUE AVE 08.270 APPLEWAY AVE & TSCHI U 14 PORTLAND CEMENT 44 SPRAGUE AV 08.340 TSCHIRLEY RD (END) U 16 PAVED 20 08.440 MANIFOLD RD (END) U 16 PAVED 20 08.540 LONG RD (END) U 16 PAVED 20 08.630 ARTIES CT (START) U 16 PAVED 20 08.680 MOEN ST (END) U 16 PAVED 20 08.770 GREENACRES RD U 16 PAVED 20 09.040 BARKER RD U 16 PAVED 20 09.180 HARMONY RD (START) U 17 PAVED 20 09.390 HOLIDAY RD (START) U 17 PAVED 20 09.530 HODGES RD (END) U 17 PAVED 20 SPRAGUE AVE 09.980 GLENBROOK ST (END) U 17 PAVED 20 SPRAGUE AVE (END) 10.050 HENRY RD U 17 PAVED 20 04621 S PR.AGUE AV ( START ) 00.000 IDAHO R.D R 09 GRAVEL 18 S PRAGTJE AV ( END ) 00.150 I DAHO STATE L INE R 0 9 GR.AVEL 18 04540 SPRAGUE AVE (LIBERTY 00.000 LIBERTY LAKE RD R 08 LIGHT BITUM. 20 SPR.AGUE AV (LIBERTY 00.050 BR 5507 LIBERTY LAKE R 06 LIGHT BITUM. 20 00.080 MCKINZIE DR (LIBERTY R OS LIGHT BITUM. 20 00.140 GARRY DR (LIBERTY LA R 08 LIGHT BITUM. 20 00.310 WR I GHT BV ( L IBERTY L R 08 L I GHT B I T tJM. 20 00.420 MOLTER RD (LIBERTY L R 08 LIGHT BITUM. 20 00.480 WARD RD (LIBERTY LAK R 08 LIGHT BITUM. 20 00.630 CLUBHOUSE RD (LIBERT R 08 LIGHT BITUM. 20 00.800 HILLVIEW RD (LIBERTY R OS LIGHT BITUM. 20 00.990 OVERLOOK RD (LIBERTY R 08 LIGHT BITUM. 20 01.110 GAGE ST (LIBERTY LAK R OS LIGHT BITUM. 20 04845 SPRAGUE AVE (START) 00.000 TSCHIRLEY RD U 19 PAVED 30 TSCHIRLEY RD (END) 00.090 SPR.AGUE AV U 19 PAVED 30 04537 SPRAGUE RD (START) 00.000 WEST END AT LINCOLN R 09 GR.ADED/DRAINED 10 SPR.AGUE RD 01.010 STROUP RD R 09 GRA.DED/DR.AINED 10 02.000 COtTLEE HITE RD R 09 GRAVEL 24 03.040 LADD RD (START) R 09 GRAVEL 18 03.660 RR TRACKS R 09 GR.AVEL 16 04.040 WOOD RD R 09 LIGHT BITUM. 20 04.930 U.S. ARMY PERSUINT S R 09 LIGHT BITUM. 20 SPRAGUE RD (END) 05.040 RITCHEY RD R 09 LIGHT BITUM. 20 5 Records Processed . yr ~ ~~I . C_ C) U N °7' Y DCPARTMFNT Or BU1LDl?JG ANb P!-ANIVING • A DIVISION QFTFIE PCDBLIC WORKs DEPAftTME;vT JAMFti, L. MANsoN, C.B.O., niuEcroR DEVms M. Scorr. P.E., AiRE-croR RECFJVEn Mr,MoRAvnuM i 51 1996 .gmq 4094 TO: Spokane Countv Division of Enginecrina and Raads, Pat Harper Spakane County Divisican oi Ulilities, Jim Red SpAkane Councy Healtli District, Steve Holderby Spokane County Divisinn of Building and Planning, Jeff Farry Spokane County Fire District No.1 Consoliciated Irrigatian Watei• District Central Valley Schnol District FROM: Julie Krause. Plann 1 l7ATE: ' Februaty 15. 1996 SUBJECT: PropQSed Preliminary Shnrt Plat SP-1 054-96 Attaeheci is a eopy of the application and proposed preliminary shore plat map sutamitted byA DAmthy J. Arice for the subdivision af approximately 1 acre into 3 lots for single-family residence and thnse uses pernutted in che Llrban Residential-3.5 (UR3.5) zane(s). Alease review this prAposal and return yaui• written camments :und recdmmendatiAns by February 29, 1996. If you have anv questicans regarding this file, you may eontact me at 456-2205. Please direet any vwritten response to Julie Krause. Encleaxures rupy without encleasures to: ~ Dorothy J. Price, 11920 E. Mansfield #62, Spokane Wa 99206 Inland Pacific Envincerincr e/o Fatrirk dVloorz, 707 W. 7th. Ste. 200, Spokane Wa 99204 tb 1026 YVEST B120ADWAY AVENUE • 51'UKArfE, WASH[NGTON 99260 ButLDING T'HOtiE• (509) 456-3675 • fnx• (509) 956-4703 PL.ANNINc I't3mm. (509) 956-2205 • Fnx: (509) 456-2243 `1'l)p- (509) 324-3166 . . . ^ . • • , . SPOKANE COUNTY DIVISION OF BUILDING AND PLANNING PRELIMINARY SHORT PLAT APPLICATIQN PART I A. GENERAL INFQRMATIQN: u NAy'V1E OF APPLICANT/REPRESENTATIVE: DA MAILING ADDRESS: ~ CITY: STAT'E: ZIP: . PHONE: (work) o~~ (homeL~~ IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OV1oNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESENTATIVE. LEGAL OWNER'S NAME: HONE• MAII.ING ADDRESS: PROJECT/PROPOSAL STT'E AREA (acres or sq. ft) l a-C~ • ASSESSOR PARCEL #S OF PROJECTlPR4POSAL P. • SS/ F ~D~ O 1 ADJACENT AREA OWNED OR CON'I°ROLLED (acres or sq. ft.) 12.--,4 ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTFt4LLED STREET ADDRESS OF PROPOSAL<e• Ja 4a t Ala- F~✓x EXISTING ZONE CLASSIFICAI'ION(S) (DATE ESTABLISHED) u~ 3' S EXISTING USE 4F PROPERTY • - COMPREHENSNE PLAN CATEGORY Lk t SCHOOL DISTRIC'T ve.. i FIRE DISTRICT WATER PURVEYOR Lo S o I, c~ c~ 4 e ck -L- PROPOSED USE OF PROPERTY: 44t- 11 Single family dwellings Duplexes Multifamily dwellings Ivianufactured homesgL Business Industria! Mixed Use Othec ( ) - Describa: LIST PREVIOUS PLANNING DEPARTMENT AC'TIONS INVOLVllVG THIS PROPERT'Y: C i.,lCE S_33 - B. LEGAI. XNk'ORMATION: LOCATION OF 1'ROPOSAL: c`'. SECTION 194&t__ TOWNSHg' RANGE NAME OF PUBLIC ROAD(S) PROVIDIlVG ACCESS: ~ / WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: //S DOES THE PROPOSAL HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL)<YES )NO NAME(S) OF AR'I'ERIAL ROADS ~ . • q I :y ; ' : Ga C. ~ ~ • . i ~ a c, - y o~ ~ i h;I ` 1 i p7 " . ~ . , PRELINIINARY SHORT PLAT APPLICATION Page 2 of 4 LEGAL DESCRIPT'ION OF PROPERTY (Attach lagal description stamped by Land Swveyor). INCLUDE LEGAL DESCRIP'I'ION FOR ENTIRE AREA TO BE SUBDNID-ED ON PREL ARY SHORT PLAT. ~ ' ! Gv~ ~1Gi. ~ ~ IF YOU DO NOT HOLD TITLE TO PROPERTY, WHAT IS YOUR INTEREST IN IT? C. PRELIMINARY SHQRT PLAT GENERAL INF(aRMATION: NUMBER OF LOTS: ~ GROSS AREA: . TYPICAL LOT SIZE: ~v PROPOSED NET DENSITY*: SMAL.LEST LOT SIZE: 1' MRvdvIUM FRONTAGE: PROPOSED SOURCE 4F WATER: Individual wells Public system.;~< Private Community System Uther ( ) - Describe: PROPOSED MEANS OF SEWAGE DISPOSAL: Public sewer Community system Septic tank and drainfield >4L Double Plumbiag Dry Sewer 4ther Describe: UTILTTY COMPANIES AND/OR DISTRICTS TO PROVIDE SERVICE TO THIS PROPOSAL: Electricity: Sewer. Gas: Water: Phone: DO YOU, OR THE OWNER IlV THE EVENT YOU DO N4T OWN THIS PROPERTY, HAVE ANY PLANS FOR FUTURE ADDITIONS ANSIONS OR FURTHER ACTIVITY RELA1'ED TO THIS PROPOSAL? Yes No IF YES, EXPLAIN: D. PREL.IIVIINARY $HORT PLAT IMPROVEMENT INFORMATION: LEVEL OF STREET IMPROVEMENfS PROPOSED: Frivate roads Public raads Arterial roads Tract X roads DESCRIBE ANY COMBINATION OF ABOVE: ESTIMATED TIIvIE PERIOD EXPECT'ED FOR COMPLETE DEVELOPMENT OF THE SUBDMSION: IS PHASING OF THE FINALIZATIDAI OF THE SH4RT PLAT PROPOSED? Yes O No IF YES. SHOW PHASIIVG ON THE PRELIMINARY SHORT PLAT MAP. IS DEDICATION OF LAND FOR PUBLIC USE CONTEIMPLATED (Parks, sChools, etc.)? Yes No O IF YES, DESCRIBE: NET DENSITY IS UMTS OR LOTS PER ACRE MINUS PRNATE AND/OR PUBLIC ROAD AREA. "jj ,w► ~~s 12-1 W ~ J.JI.wl 1+ ; ~ ~ y4 1 ' '..L `r! tl'.~ . , PRELIlVIIIVARY SHORT PLAT APPLICATION Page 3 of 4 PAItT II THIS SECTION OF THE APPLICATION WII,.L PROVIDE THE PLA►NNING DEPARTMENT STAFF WITH wiIRITTEN VERIFICATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATIOIV WITH THE AGENCIES IDETIWIED. RESULTS OF THE PRELIMINARY CONSiJLTATION SHALL BE INCORPORATED IN THE PROPOSAL BEFORE FINAL SUBMIITAL TO THE PLA,NNING DEPARTMErTT. FIRE MARSHALL/FIRE DISTRICT A. THIS PROPOSAL IS WTTHIN FIRE PROTECTION DISTRIC'f NO. / B. ADEQUATE ARRANGEMENTS (HAVE) ~ HAVE NOT BEEN MADE TO MEET OL1R NEEDS IN PROVIDING FOR AN ADEQUATE WATE1t~STE1Vf FACILTCIES FOR FIRE PROTECTION PURPOSES. C. RECONiMENDED FIRE FLOW: OR UNABLE TO CALCULA'I'E NOW BECAUSE USE IS NOT DEFINITIVE; AND WII.L BE DETERMINED AT BUILDIIVG PERMIT APPLICATION TIME. D. xEQu[xEivtIF-rrrs nNci..trnE: Jk.. ~ J FIRE DISTRICT SIGNA TLE DAT'E WATER PURVEYOR A. SATISFACTORY A,RRANGEMENTS C WATER AND FIRE FLOW REQ S (HAVE) BEEN MADE. B. REQUIREMENTS/COMViENT : ocu Gl~~,C~iv1 . ~ ~~ry~'r,✓,~~ ..~~i~~l~1 ~~i~ ~ : WATER DISTRICT SIG A DATE COUNTY ENGINEER A PRELIMINARY DISCUSSION HAS TAI~N PLACE AND GENERAL REQUIREMENTS FOR ROADS rTD DR.ATNAGE HAVE BEEN DISCUSSED WITH THE APPI~ICANT. A. COMMENTS: j tco.~~ ~ Poo 'f" PL/`1N m , SIGNA E DATE COUNTY UTILITIES A PRELIMIATA.RY DISCUSSION HAS TAKEN PLACE AND GBNERAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NO ) EEN SATISFIED. THE DESIGNATED WATER PURVEYOR FOR THIS SITE jS ..~~a~ A. COMMENTS: ~ > - ~ f S.e c ~ Z SIGNAT'URE/I1TLE DATE i C HEALTH DISTItICT ' A PRELIMINARY DISCUSSION HAS TAKEN PL~CE BRA.L REQUIREMENTS FOR SUBMTITAL OF THIS PROP4SAL (HAVE) ~I VE NOT SEEN SATISFIED. P-11 A . COMMENTS: c.L ~ C rnS r~ ~e (7-, ~ .s1 ~/3, . ' SIGNATURE/TITLE DA ~ SEWER PURVEYOR * A PRELIIvIINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUMEMErITS FOR THE PROVISION OF PUBLIC SEWER ARE UNDERSTOOD BY THE APPLICANT. ~,~,~tiN SSA A. COMIVEEINrs: 7~~ ~D i 2 •1w~jir ALt 0 ~'J 4-l1 1-c 4-A F t"1 / ~ )lh SIGNATURE/fITLE DATE ~ ~ . . PRELIlVHNARY SHORT PLAT APPLICATION Page 4 of 4 : - - . _ PART III S ~ wAS ~J URVEYOR VERIFICATION A LIGENSED LAND SURVEYOR, HAVE COMPLfiTED THE INFORMATION `5~ t~tEQ . L~i ESCRIPTION AND PRELIMINARY SHORT PLAT HAVE BEEN PREPARED B Y ME t„:OR S SION IN ACCORDANCE WITH THE REQUIIREMENTS OF THE SPOKANE COUNT DIVI ULATIONS AND THE LAWS OF'THE STATE OF WASHINGTON. p►~~ •r,~ . DATE: ~-vic L i~► DDRES 707 LU PHONE: EX*IRES 12 Od zrn: Qfc:l b ' KA A.) 64 LoA PART IV (SIGNATURE OF PROPERTY OWNERS OR LETTER OF AUTHORIZATION) I, THE UNDERSIGNED, SWEA.R OR A►FFIRM UNDER PENALTY OF PERJURY THAT THE AB4VE RESPONSES ARE MADE TRUTHFULLY AND TO THE BEST OF MY KNOWLEDGE. I FURTFER S WEAR OR AFFIRM THAT I AM THE OWNER OF RECORD OF THE AREA PROPOSED FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER. ATTACHED HEREWITH IS WRITI'EN PERMISSION FROM T'I-E OWNER AUTHORIZING MY ACTIONS ON HIS/AER BEHALF. ~ N DATE: ADD PHONE: Co 0~~ ZIP: SIGNATURE OF ~P REPRESENTATNE / DATE ~ STATE OF WASHINGTON ) ) ss: COUNTY OF SPOKANB ) ~ SIGNED AND SWORN OR AFFIRMED BEFORE ME ON THIS DAY OF ~ 1996, BY DcPv(A\,1 W . l ~ NOTARY SEAL Notary blic in and for ~he Statc dF Washington OFFlCIAL SEAL JUDITH LEO Residing at: No1ary Public - WashinAton - ~ My appointment expires: ~,~1 " ,,Q~ My Commission Exprres ' October 27, 1997 PART V (TO BE COMPLETED BY THE DIVISION OF BUII.DING AND PLANNING) ~ DATE ACCEP'TED: BY: M3 TOTAL FEES: RECEIP'T FIL,E~: IOvrv - ~.9 aEV uss sAr+n U lt~ ~ ~ ~rv r ~y (t.o s ' . Y SI"OKANE COUNTY DIVISION OF BUILDING AND PLANNING PRELTNZINARY SHORT PLAT APPLICATION PART I A. GENERAL INFORMATInN: ~ NAMI: OF APPLICANT/REPRESENTATIV4TA MAII.ING ADDRESS: ~ CITY:E: ZIP: PHONE: (work) ~oR~-qfJsv (homeL~Lw v -eol 0 IF A1'PL,ICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AUTHORIZATION FOR APPLICANT TO SERVE AS REPRESENTATIVE. LEGAL OWNER'S NAME: PHONE: bZALING ADDRESS: PROJECI'/PROPOSAL SITE AR.EA (acres or sq. ft) . ASSESSOR PARCEL #S OF PROJECT/PROPOSAL ADJAGEIVT AREA OWNED OR CONTROLLED (acres or sq. R.) ASSESSOR PARCEL #'S OF ADJACENT AREA OWNED OR CONTROLLED STREET ADDRESS OF PROPOSAL EXISTING ZONE CLASSIFICATION(S) (DATE ESTABLISHED) u~ 3S EXISTING USE OF PROPERTY . COMPREHENSNE PLAN CATEGORY LL t b~ h SCHOUL DISTRICT ~ e V,,- eY FIRE DISTRICT VVATER PURVEYOR C.o h S o I• a~ o~'~ e~ -J-- t PROPOSED USE OF PROPERTY: ~ Single family dwellin s() Duplexes Multifamily dweUings Manufactured hom Business Industrial Mixed Use Other ( ) - Dcscribe: LIST PREVIOUS PLANNING DEPARTMENT ACTIONS INVOLVING THIS PROPERTY: C- uE B. LEGAL INFQRMATI : LOCATION OF PROPOSAL: SECTION TOWNSHIP RANGE NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: DOES THfi PROPOSAI. HAVE ACCESS TO AN ARTERIAL OR PLANNED ARTERIAL YES NO NAME(S) OF ARTERIAL ROADS • • v' 4 ~ PREL.IMINARY SHORT PLAT APPLICATION Page 3 of 4 PART II . THIS SECTION OF THE APPLICATION WILL PROVIDE THE PLANNING DEPARTMENT STAFF WITH WRITTEN VERIECATION THAT THE APPLICANT HAS HAD PRELIMINARY CONSULTATION WITH THE AGENCIES IDENI7FIED. RESULTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPOR.ATED IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT. FIRE MARSHALL/FIRE DISTRICT A. THIS PROFOSAL IS WITHIN FIRE PROTECTION DISTRICT NO. B. ADEQUATE ARRANGEMENTS (HAVE) (HAVE NOT) BEEN MADE TO MEET OUR NEEDS IN PROVIDING FOR AN ADEQUATE WATER SYSTEM AND FACILTTIES FOR FiRE PROTECTION PURPOSES. C. RECOMNiENDED FIRE FLOW: ; OR UNA.BLE TO CALCULATE NOW BECAUSE USE IS NOT DEFINITIVE; AND W1LL BE DETERMINED AT BUII.DING PERMI'T APPLICATION TIME. D. REQ[TIREMENTS INCLUDE: FIRE DISTRICT SIGNAT'URFITTTLE DATE ~ WATER PURVEYOR A. SATISFACTORY ARRANGEMENTS FOR DOMESTIC WATER AND FIRE FLOW REQUIRENiENTS (HAYE) (HAVE NOT) BEEN MADE. B. REQUIREMENTSiCOMMENTS: WATER DISTRICT SIGNATURE/TITI,E DATE , COUNTY ENGINEER A PRELIMINA.RY DISCUSSIOI'J HAS TAKEN PLACE AND GENERAL REQUIREMBNTS FOR ROADS AND DRA.INAGE HAVE BEEN DISCUSSED WITH THE APPLICANT. A. COMMENTS: . j0U.co iDO + )PL/tw 1 rREM~E SIGNA DATE , COUNTY UTILITIES A PRELIMIIVARY DISCUSSION HA.S TAKEN PLACB AND GENERAL REQUIREMENTS FOR SUBMITTAL OF THIS PROPOSAL (HAYE) (HAVE NOT) BEEN SATISFtED. THE DESIGNATED WATER PURVEYOR FOR THIS SITE jS A. COMMENTS: . SIGNATUrREITITLE DATE ~ HEALTH DISTRICT A PRELIMIIVARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIRENiENTS FOR SUBMITTAL OF THIS PROPOSAL (HAVE) (HAVE NOT) BEEN SATISFIED. A. COMMENTS: SIGNATURFIrITLE DATfi . SEWER PURVEYOR A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GfiNERAL REQURREMENTS FOR THE PROVISION OF PUBLIC SBWER ARE UNDERSTOOD BY THE APPLICANT. A. COMMENTS: SIGNATURE/I1TLE DATE , iMIT CENTER PASSPORT Date: Number. ~ ,r Name ~ P L: ~~t , ~ ~ Phone~ ?°`t ~Q 0 2 Address r~ 1 ~ -2c:) IkA A Ns F -tt:~ c.~ ---z Comments: >I~LIn-T PLAT CUSTOMER ROUTING ( BUILDING Depanment f PLANNING Department - - ~ ENGINEER'S Oepartment = Addressing ~ Admin. I:xception _ Approach Permit = Building I'ermit _ i Arterial Rd Plan lnfo _ I~lood Plain Permit ~ Coclc Infomiation I3inding Site Pian Info i Public/Private Itoads ~ Comrnercial Review Cert. of Exemption ~ Res. Bidg Permit Rcv. W Canfercnce Comprchcn.sive Plan s Sitc Drainage Info ` Energy Code Info s Cand. Use Perrnit ubdivisinn Review T~►' i1-ire Safety Review _ Noqconfomiing Usc . ~ Utility Permit ~ Manufactured Ilame Pemiit Review , Zone Change Review Mecfianical Yerniits Shorelines Info ~ Othcr Pcrniits Shart Plat Info NO ••E REQUlI'tED Rcviewer Timc out ~ Pluinbing Pcrmits Suhdivisian lnCo ~ ~ Privatc Road Infa _ i 'I'emp. Use 1'erniit UTIUTIES Oepartment _ ; . Residential Review Variancc Aprl. , APA Payment i Sewcr 1'crn►its Zone Chcck Ceri. of L-xccuption Zone Info ~ Subdivision Review UL[la/Scwcr lnfo "Lcme Change Review NO ••E IZECl UIRE U ND I~,r- RCQUIRED Revicwer Time nut Reviewcr Tirne out Revicwer Timc out MAS'IERIPACSpC)RI.CiR 211&'V)