Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2008, 01-24 Permit App: 08000190 Pole Bldg
Project Number: 08000190 Inv: 1 Application Date: 1/24/2008 Page 1 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: 24 X 36 POLE BLDG Contact: TOWN&COUNTRY Address: 5918 E TRENT AVE C-S-Z: SPOKANE,WA 99212 Setbacks:Front Left: Right: Rear: Phone: (509)535-9016 Group Name: Site Information Project Name: Plat Key: 999999 Name: Range District: East Parcel Number: 55192.9047 Block: Lot: SiteAddress: 17720 E 6TH AVE Owner:Name: ADAMS,TIMOTHY S Address: 17720 E 6TH AVE Location::CSV GREENACRES,WA 99016-9758 Zoning: R-3 SF Res District Water District: Hold: ❑ Area: .32 Acres Width: 0 Depth: 0 Right Of Way(ft): 50 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Released By: Originally Released: 1/23/2008 By: tmelbourn Landuse/Zoning/HE Conditions Released By: Accessory structures must not exceed 1,394 SF Originally Released: 1/23/2008 By: mbasinger Permits: Operator: JD Printed By: JD Print Date: 1/24/2008 Project Number: 08000190 Inv: 1 Application Date: 1/24/2008 Page 2 of 2 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Contractor: TOWN&COUNTRY BLDG Firm: TOWN&COUNTRY BLDG CONT Address: 3908 W DAKIN LN Phone: (509)448-8483 CHENEY,WA 99004 Building Characteristics Building Height 14.6 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation POLE BDLG U-1 VB 864 $16,416.00 864 $16,416.00 Totals: 864 $16,416.00 864 $16,416.00 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $279.25 ACCESSORY PLANS REVIEW 1 SELECT $69.81 WSBC SURCHARGE I SELECT $4.50 Permit Total Fees: $353.56 Notes �:: Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $353.56 $353.56 $0.00 $353.56 $353.56 $353.56 $0.00 $353.56 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 1/24/2008 Per11mit707 Center E Sprague Ave, Suite 106 PERMIT NUMBER Q C C j ' *'lane Spokane Valley,WA 99206 PERMIT FEE: j ev (509)688-0036 FAX: (509)688-0037 J www.spokanevallev.org Community Development Residential ConstructionVVNew Construction Q Accessory Bldg Permit Application Addition/Remodel n Deck n Other: SITE ADDRESS: / 7).Z 0 4,T )1vw ASSESSORS PARCEL NO: 5S 1 9(2 • 901/ 7 LEGAL DESCRIPTION: Building Owner: Contractor: Name: -rt frin14Ix0,1c Name:—15/4/4/ s CotAITRr 6u/4D, :KS rife, Address: Address: S9/B fgfi Toon-*jawI �7.�0 E t.- ... A�tr1 h City: se �osA,e `1✓ i , y State: to)1"" Zip: mitt. City:_SpecittkitViva r State:h4 Zip: f 92/z Phone: ? 2 —0 S5 3 / Fax: A J f A Phone:S . 3c- 9Wb F�S� Say 283'D !! l V/ Contractor Lic No:T wwlC$r/234 Exp Date:" 606130/0$ • Contact Person City Business Lic.No: 60j 05i 4 Name: 6441 B,ug)1 E r - - Phone: Co? '535 90/6 EXT 24 Describe X 3Cscope of work in Cost of Project: $,77 ie2 a 3 2_ Proposed Use: 6.6,, c,3 e **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEAK: DIMENSIONS: #OF STORIES: TOTAL HA ITABLE SPACE: /L-/ -/o'' a.yX 34 V/o=r;'" . -�— "l/i�l- MAIN FLOOR TO SQ. 2"" FLOOR SQ. FTG: UNFIN BASEMENT`' SQ. FTG: IMPERVIOUS SURFACE FTG: J /r/� N/� /i 11 AREA: NM" FINISHED BASE NT GARAGE SQ. FTG: DECK/COV. TIO SQ. FTG: 30% SLOPES ON SQ. FTG: �fo y 0 N , PROPERTY: ,1' �' #OF BEDR�OON : CONSTRUCTION TYPE: HEAT SOU C,E/� SEWER OR SEPTI ? Po sT FR�¢NI R• /V� SEtlt The permitee verifies,acknowledges and agrees by their signature that 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spoke -Iley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit =-ter. 5) ' C' of Spoken= f• ey Permit is not a permit or approval for any violation of federal, state or local laws, codes or; •in- ces.6) -1- s or additio.= i• orrnation may be required to be submitted, and subsequently approved before this application •- be p-•cesse•. s SIGNAT 'E: / DATE: _.-- �. Method of Paym- t: 0 Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: REVISED 2/15/07 sie - -Valley 11707 E Sprague Ave Suite 106 P Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 ♦ dtyhall@spokanevaltey_org Residential Plan Submittal Minimums ❑ Completed Building & Mechanical application with: Accurate address, Parcel Number and/or Legal Description, description of work, owner and contractor information, signature, and date. o Two sets of plans including Site Plan, elevations, floor plans, foundation plans With details, roof plan, framing plans & details. ❑ Show the height of any proposed buildings or accessory structures. ❑ Floor plan for each floor. Dimension to scale (minimum 1/8") and label each Room (including sq. footage of house and garage on plans) Show each level of existing house and square footage of any additions. ❑ All braced wall panel types: show locations and details of installation, including engineered design. ❑ Egress windows: Provide at least one window or exterior door approved for Emergency escape or rescue from a basement and in every room for sleeping. ❑ Smoke detector locations ❑ 22"X 30" attic access location ❑ 18"X 24"crawLspace.:access: ❑ One-hour separation detail: between house and garage ❑ Floor framing details: Joist type, size, spacing and installation details ❑ Roof framing plan and details ❑ Furnace and hot water heater location. . ❑ All header locations: type, size, and connections ❑ Foundation plan 0 Insulation information New project D Project Previous pre-app meeting ❑ N)Olialle Transmittal Plan revisions 0 City of Spokane Valley Transmittal Date: 0411010011 \iilley Community Spokane alley Tuesday,January 22,2008 Department 11703 E.Sprague Ave,Suite B3 Spokane Valley,WA 99206 Phone: 509.688.0036 Site Address: 17720 E 6TH AVE Project Number: 08000190 Parcel Number: 55192.9047 Zoning: R-3 Water District: Fire District: FD 01 Applicant: TOWN & COUNTRY Owner: ADAMS, TIMOTHY S 5918 E TRENT AVE 17720 E 6TH AVE SPOKANE, WA 99212 GREENACRES, WA 99016-9758 (509) 535-9016 e-mail: e-mail: Contact: TOWN & COUNTRY Occupant: 5918E TRENT AVE e-mail: SPOKANE, WA 99212 I r--71) IH (l i_ li 1\// 1' (509) 535-9016 if l i e-mail: -_.•_ ., `'`; /ref" Contractor: TOWN & COUNTRY BLDG CONTR Arch/Engineer: I-I 3908 W DAKIN LN �j j C - �� \� CHENEY, WA 99004 � i;.I i{ I ;� (p ! 1' (509) 448-8483 e-mail: Project 24 X 36 POLE BLDG Description: BuiId fig Landuse Engineer Utilities Health Fire Dist Assessor APPLICATION SITE PLAN �v PLANS / 47, Please send all plan review and project comments via e-mail to the highlighted individuals. PROJECT TRACKING LOG PROJECT INFORMATION NOTES: PLUS #: J 1 q Q Address: '`1-7 E P ),(2_,- Contact: ) _Contact: 41410.4.104,1•1R11iiirtalr ���0liI f Name: T , `4 ' AMA igiFT .0iit. 6 one number - li d 0 t 1,�:� -$pp A o� cttar' email address: khr4yly�i 1 1 �;AI1 L!'� 3 05 t d ,01 �to j 0 fi rye 19 .,� 1',�al NM'{ Fax number: p y'#�� }f.M t 94.041041104,E ' .4T,,''.,.„1i-4- :. 6Orfr el $ ` 4 k A 5 o b} Ati � � • y } u 'eaffi i e-� .� tl P 4('L�- �'���Y�°: Intake. .:,..... rA : .' Date In • r ' Routed ��� ' I �i °r�`� � tr , }� rs tE '� i "�t � Date Out iii z By 1. . . � g�� 1 B 'F('' rlr � L1'It1 pNlr"'. Pte I�IF 151 ,i d a ,, " ?Er �` x ,, . ,od- , .il�Ol1 ttlImmlov ent Review 1_ Ellin rt .�''3 2 : Date In ' 14'4114I64#4 Jy 3*' w�t „4.,,,,,,,,,, {l : i 4,„.,,,,,,,, ` Date Out : BY row t+k.d ,J r®m ire ` 1 First Comments Transmitted:�p 1 � r.�,1�F1 �H �� f ...it _ Date In , a� 1 ri.4'41... tau :-11 + Date Out k9e i h7 } t p9� sr fl i :.-- --....10:044.. irliiii �,itl ;3� Resubmital #1: t' Comments Transmitted. 1h'it`ix��u l; l�'� ''`' �' Resubmital #2: , j l i�fr",, t ,t+ f Comments Transmitted: 7�(Cii�� u ��1 h ,,,,k� 41 �; , t •Resubmital#3: it'", Comments Transmuted: `k, A.ir L.f,l `5, i1r." {j.:.:`� '', 7'1'. '''1 aY 'r'.'fi ... r��§ i i-,t r r ec y= qq�ti R$1` T'# �y4At :° rrk41. i yM�tyz-� S �� }tPli`" .(��x g�.!).. k€t X7,4 �A4a,F k ty' I Scheduled , Po a ', t,*<� A li , s a s r i° Vt,e Meeting 4. y�Il�tf4a�ts:...;5�. ..p„ ..�( r 3.:1=� i dh �'��',� �j�r .k �h°� � f n � .�' � ik{§ �,, �� >;, x� � � 1ri3 Date Held , s!d ,r5ri t „ -,5y, d'p 4. Mtfil� '�" �`S .. Withift 55.114,1 �, �F'4 fallagitatj ry��5 �a 4n i I f�'"' ..y ° 'E(T14 r� ti's ({x (y� f h�i ' +{i '9p�3"l1 1a ?pv Ii i' �, ' -dit;I + `- 2 d' , l Fg t tt, V tn!r:,:£ K {? ikA �r{ �phirid E 19 1 '41'i i • : : ." Date In irk . tr im I + It C a r['I � s l1r �y r :M . , •:i,I 11-.4.(24.14. rs �� � �' l �� 1 � Date Out ;'011F- � ;r Resubmital#4: +�i4' 'r Comments Transmitted: ,kI, � ' 1 - Its Ilr (�I rIX� I 't��� Resubmital#5 +�r �r �iiragi1. I� _ 14$k,'-'-':-� Comments Transmitted: _li 'Tt� a � +� '�.. L3•:44-1;11"11,-1,,, I �'lydl"i'il;-01070-74+001t1+0...-t+,3-P110,4111,.,....,,,,,.,,....,4,,• ,, . .r,,,T o #'{ '�i f �Pi�', �,I. , 9°,��+#I/'. p, kylar k kj C4;- Od (. H t y ,l' 4 r ,p/,�'qr, y.' l'..1`;11':1110* I. r� j1 , r . :� : r ..i t`' {{' a{ C'+§ yili r �'.1 6 `U - '4k ,�.§2 i;, i r 1 y!'V�Y, + f r� �' t,r.:,� 5 �1 (s r + f i_� ,iY 11 t ;-AII 1 k,;l u i. •. r } I Y 3 t tt 7 k 7 A:4:AV ,Lr -; ia''kiii, II --F ., f{ q.� A�� D.te Out ,� '' � M � 1 Project Complete a ®� 414441.00-51t0114*Ii. :-' P ij yk ? I r k�{§-I, ,grr s 9'" >2 h 9 F me 1 e rl r-�k..°9X°h+A Ir•1 ' �5€"IP, ' q r.:;:. '- r � �a d§�'�4I 4 } 11- h ;. 1� f ,�; u" �� � any j .......:... ' A•& + e ? a16AS:n 44an3Y ;9.4 1'a ....._., a eL. ..� i�d q( 400/14- 4 33 ` 20,___ 3° 1 3 I •7..., , ... i i : 1 . 3.5- / ' 1 q ��e, t i • i // 90 \' N e , C.7 --------> - i t-- f�ep°sit 1 ©vcv he4 dj 1 . I ,- / 0 ) , t — APPROVED BY fildmil.......d7 '`' For City Use Only { Y PLUS Project Number CITY OF ; po1ine Project Address 4•00*Vlle ° a y 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is I, A The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07