SP-975-94
ENGINEER'S 1tE'V'IEVV . SHEE~
•BLIDirl. PERMIT *=or =FILE#
'Rela'ted File (
Date to,Revievir 9-6=94 T'une # Date to ,AA & DR. Tiaie
Date Received ~8-24=94
Project .Name BUSIlNFSS ,OFFICE ;No. lo`t.s- 3 No:Acres.. -3.2
- - - -Secct~o-n = Townsliip - Range
SITE' ADDRESS N`MISSION?E FAMCHER PARCEL # 12533-1603
, Applicaat's Name ROBERT'CARfiER Fbone #535-468&
Address 3$01 S SKYVIh-W'.DR. SPOK;ANE WA,.99203 Votk 624-7466
Date Copditions: mailed~'.~ ~ _
Contact pdrson Phone~Y#
LOOD 2ONE V. NO W" 4 S 1, SCFIOOi: 363'
]8ngineer S,urvey,or's / Ar,ch~itecc's:.Name•' d PAUL,RAIVIEIZ & ASSOC IN.C
SOS;; E JTETON
TO BOX 187'79:
SPOICANEfMA 99208,
467=526fFAX 467 5262
Planning..Contact -Person JQHN 7'ODD Phone 456 W,
Da't_e Subnutted: D~scdprion= Initials
% j AGREEMENT"TO PAYT,119S OR PRIORIT,Y h'EE COIVIFLE'IFD I8t. COPY 'POr,ACCOU_,N'I'I,
FINAL PLAT-FE~ES - COMPI~wF'IF1? & 'CUPY T0,'ACCOU1V1*G
! N,OTICE 'I'O. I'U]3LIC:.#. 1 3'.4 -6 COMPLE'CED - OR NEEDS 'CO BE -.SIGNED
- , - - - . / ~ , DESIGN DFVIATiON,, -S-UBMIT'!'ED
AL .TERATION''TO P _I:AT - DLOCKS *-L01.'S
t BONI): xtEI:-WtID -ROAD D.RAQVA,GE:"I1IRPROVEl41]aN'TS
~ H8AdNG` MCAM ;APPROVED, D`EMEU. APP_~ALEt)i•BBC •J•PRQJECI` _APPROVED DtNED,
OFFICE OF THE SPOKANE COUNTY ENGINEER
1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478
-SHORT PLAT REQUIREMENTS-
TO: Spokane County Planning Department, John Pederson
FROM: Division Of Engineering & Roads, Scott Engelhard=~i
DATE: September 9, 1994
SUBJECT: SP # 975-94 / CARTER, ROBERT
The following "Conditions of Approval" for the above referenced subdivision
are submitted to the Spokane County Planning Department for inclusion in the
"Findings and Order" should the short plat be approved.
E 1 That conditional approval of the plat by the County Engineer is given
subject to approval of the road system as indicated in the preliminary
plat of record.
E 6 No construction work is to be performed within the existing or proposed
Public Right-of-Way until a permit has been issued by the County
Engineer. All work is subject to inspection and approval by the County
Engineer.
E12 The applicant should be advised that individual driveway access permits
are required prior to issuance of a building permit for driveway
approaches to the County road system.
E16 Existing County roads providing direct access to the plat shall be paved
and/or curbed to Spokane County standards.
E18 That sidewalks are required along the arterial(s) on Mission Avenue.
E19 The word "applicant" shall include the owner(s) of the property, his/her
heirs, assigns and successors.
E20 To construct the road improvements stated herein, the applicant may,
with the approval of the County Engineer, join in and be a willing
participant in any petition or resolution which purposes is the
formation of a Road Improvement District (RID) for said improvements
pursuant to RCW 3 6. 88 , as amended. At such time as an RID is created or
any Road Improvement Project is sanctioned by Spokane County, the
improvements required (curb, sidewalk, drainage control and paving to
existing pavement) will be at the sole expense of the undersigned owner,
their heirs, grantees and assigns. This provision is applicable to
Mission Avenue.
E21 As an alternative method of constructinq the road improvement stated
herein, the applicant may, with the approval of the County Engineer,
accomplish the road improvements stated herein by joining and
participating in a County Road Project (CRP) to the extent of the
required road improvement. At such time as an RID is created or any
Road Improvement Project is sanctioned by Spokane County, the
improvements required (curb, sidewalk, drainage control and paving to
existing pavement) will be at the sole expense of the undersigned owner,
their heirs, grantees and assigns. This provision is applicable to
Mission Avenue.
E22 That the following statement shall appear within the dedicatory language
of the f ina 1 plat :
The owner(s) or successor(s) in interest agree to authorize Spokane
County to place their name (s) on a petition for the formation of a
Road Improvement District (RID) by the petition method pursuant to
Chapter 36.88 RCW, which petition includes the owner(s) property, and
further not to object, by the signing of a ballot, the formation of
a RID by the resolution method pursuant to Chapter 36.88 RCW, which
resolution includes the owner(s) property. If a RID is formed by
either the petition or resolution method, as provided for in Chapter
36.88 RCW, the owner(s) or successor(s) further agree: (1) that the
SHORT PLAT: # 975-94 / CARTER, ROBERT 2
improvements or construction contemplated within the proposed RID is
feasible, (2) That the benefits to be derived from the formation of
the RID by the property included therein, together with the amount
of any County participation, exceeds the cost and expense of formation
of the RID, and (3) that the property within the proposed RID is
sufficiently developed. Provided, further, the owner(s) or
successor(s) shall retain the right, as authorized under RCW
36.88.090, to obj ect to any assessment ( s) on the property as a result
of the improvements called for in conjunction with the formation of
a RID by either petition or resolution method under Chapter 36.88 RCW,
and to appeal to the Superior Court the decision of the Board of
County Commissioners affirming the final assessment roll. It is
further agreed that at such time as an RID is created or any Road
Improvement project is sanctioned by Spokane County, the improvements
required (curb, sidewalk, drainage control and paving) will be at the
sole expense of the undersigned owner, their heirs, grantees and
assigns without participation by Spokane County.
The RID waiver contained in this agreement shall expire after ten
(10) years from the date of execution below. However, the owner(s)
or successor(s) agree that if said RID waiver expires without
construction of the required improvements, the owner(s) or
successor(s) agree to construct the required improvements at their own
expense; pay to Spokane County the then estimated cost of the required
improvements to enable the Caunty to complete the same; or furnish a
bond or other secure method suitable to the County (which may include
the execution of another RID waiver agreement), providinq for or
securing to the County the actual construction of the improvements.
All of the requirements of this agreement shall run with the land and
shall be binding upon the owner(s), their successor(s) or assign(s).
This provision is applicable to Mission Avenue.
E24 The County Engineer has designated Typical Roadway Section Nwmber 1
Collector Arterial Standard for the improvement of Mission Avenue which
is adjacent to the proposed development. This will require the addition
of approximately 10-12 feet of asphalt along the frontage of the
development. The construction of curbing and sidewalk is also required.
E32 The proposed plat shall be improved to the standards set forth in
Spokane County Board of Commissioners Resolution No. 80-1592, as
amended, which establishes regulations for roads, approaches, drainage
and fees in new construction.
E33 The County Engineer has examined this development proposal and has
determined that the impact of this proposal upon the existing County
Road System warrants the roadway improvements herein specif ied.
E61 The County Arterial Road plan identifies Mission Avenue as a 70 foot
wide Collector Arterial. The existing right of way width of 60 feet is
not consistent with that specified in The Plan. In order to implement
the Arterial Road Plan it is recommended that a strip of property 5 feet
in width along the Mission Avenue frontage be set aside in reserve.
This property may be acquired by Spokane County at the time when
Arterial Improvements are made to mission Avenue.
E90 The applicant should be advised that there may exist utilities either
underground or overhead affecting the applicants property, including
property to be dedicated or set aside for future acquisition. Spokane
County will assume no f inancial obligation for adjustments or relocation
regarding these utilities. The applicant should check with the
applicable utilities and Spokane County Engineer to determine whether
the applicant or utility is responsible for adjustment or relocation
costs and to make arrangements for any necessary work.
SPECIAL CONDITIOId:
The applicant shall provide documentation to the satisfaction of the
County Engineer that the lots have the right to use the easement
indicated on the preliminary plat.
r
SH+DRfi PLAT : 9 7 5-g 4/ CARTER, ROBERT 3
SFECIAL CONDITION:
Although na drainage plan is required for firializatian of the plat, the
applicant is advxsed that a site drainage plan shall be required far
the vacant parcel adjacent to Mission Avenue prior to release of a
buildinq permit.
i~~~~~e~~~~~e~eee~eeee~ee~eeeeeee~Report Viewe~fleeeeeee~ee~eeeeeeeee~eee~e~e~~~;
°PAGE 1 14:28:38 25 AUG 1994 0
°Road# Road Names.......... MPost. Reference Descriptio Road Lag Info,.........
003042 MISSION AV (START) 00.000 FANCHER FRONTAGE RD U 17 PAVED 200
° MISSIf}N AV 00.494 THTERMAN ST (END) U 17 PAVED 20
° 00. b20 BR.ADLEY R.D (END ) U 17 FAVED 200
00.770 LILY RD {END } U 17 FAVED 20
° 00.930 BOWMAN RD ( END ) U 17 PASIED 200
° 00.990 FARK RD II 17 PAVED 20
° 01,110 CENTER RD (END) U 17 PAVED 200
° 01.130 CENTFR R.D (START ) U 17 PAVED 20
° 01. 2 3 0 ELLA RD (END ) U 17 PAVEL} 200
° 01.270 ~LLA RD (sTART) u 17 PAVEn 20
° 01. 2 9 U ELT4N RD (END ) U 17 PAVED 200
°03043 MISszox Av (sTAxT) 00.000 VrsmA RD (END) U 17 ~AVED 22
° MrSSIDN AV 00.140 BESSIE RD (END) U 17 PAVED 220
° 00.260 SARGENT RU ( END ) U 17 PAVED 22
° 00.330 MA.RGUERITE RD (START U 17 PAVEa 220
° 00.510 ARGoxxE Rn (orrE wAY v16 PAVED 44
° 00.570 MULLAN RU (ONE WAY N U 16 PAVED 440
° 00.680 WILLC]W RD ( START ) LT 16 PAVED 36
• waaa i• • • ~ r • e~ rrs• eeeeeeeeeeCe s iers a. rr .e ~ • • • • ..e• a e ►
eeeeeeeeeeee~eee~eeeeeeeeeeee~eeeeeeeeeeeeeeeeeeeeee~eeee~eef
°List ° °Use Directian Keys to View Report (Press [F1] for help) a
fl~~~~~~ie~i~e~~~i~~~~~~~i~i~i~aaaa~~i~i~iaa~a~~a~i~~►~~~~~a~~~~~~~~i~~~.aaa~a~~~aaaaaaaaa~~i~~i~~
°EsC-Exit Exiter-Next P2►ge ~
M ~
S i< lv 1-AT , ~ CD
PLANN[NG UEPARTMENT WALI,IS D. HIJBBAItD, DIRECTA~
~~ORANDUM
M. Spokane County Division of Engineering and Rvads
Spokaae County Division af Utilities
Spokane Cvunty Division af Buildings
Spakane Counry Health District
Spokane Regionai Transportation Gouncil
Spokane Cnunty Fire Distrjct # 3
5pokane Suburban Water Dist, #3 ~FR.OM: 7ahn Tadd, Planner II J- V". E I v f 0
1994
DATE: AllgUSt 23, 1994 ' - .
SUBJECT: Pmliminary ShortPiat SF-375-94
Attached is a copy af the application and proposed preliminary Shart Fiat map submitted by
Robert Carter snd James T. Welsh for tii+e suUdivision af 3.24 aeres into 3 lots for a
contractor's office and stQrage yard and those uses permitted in the Li.ght Industrial (I-2)
zane.
Please review this pmposal and neturn youx comments and mcammendations by Septem.bex
6, 1994. If you have any questions regarding this file, you rnay contact me at 456-2205.
Please direct any written response to John Todd.
Thank yau far your prompt attention.
tP
Enclosures
c: Robert Carter, 3801 S. Skyview Drive, Spokane WA 99243
James T. Welsh, 4114 E. Broadway, Spoane WA 99202
J. Paul Ramer, P. 0. Box 18779, 5p4kane WA 99208
WE,.S'E10~6 BR4AQVIIAY Ai~~~UF, ' SPOKA.N[Fr WP.!iNtrtiLs'~1'OdV f.3926{}-0240 ' ~509~ ~56-2205
LEGAL DESCRIPTION
All that certain real property being a portion of Hlock 1, FIRST
ADDITION TO ORCHARD PARK as shown and so delineated on that certain
map as filed and recorded in 8ook "E", of Plats, Page 47, Official
Records, Spokane County, Washington, being more particularly
described as follows:
The easterly 196.29 feet of Block 1, EXCEPT the South 30 feet
thereof, FIRST ADDITION TO ORCHARD PARK, according to plat recorded
in Volume "E" of Plats, Page 47, in Spokane County, Washington.
TOGETHER WITH an easement for ingress, egress and vehicular parking
purpose, over, along and across the following described property:
Block 1, FIRST ADDITION TO ORCHARD PARK, according to plat recorded
in Volume "E" of Plats, Page 47, in Spokane County, Washington,
EXCEPT the South 30 feet, and EXCEPT the easterly 196.29 feet, and
also EXCEPT the West 82 feet.
ALSO, together with the right to use the spur track over and across
the following described property:
That portion of Tract 9, ASSESSOR'S PLAT NO. 1 recorded in Volume
"C" of Plats, Page 88, in Spokane County, Washington, described as
follows:
Heginning at the Southwest corner of said Tract 9; thence northerly
along the West line a distance of 644.04 feet to the point of
beginning; thence northeasterly to a point on the northwesterly
line of said Tract 9, 177.95 feet northeasterly from the
northwesterly corner of said Tract 9; thence southwesterly 177.95
feet to the northwesterly corner; thence South along the West line
of said Tract 9 to the point of beginning.
Situated in Spokane County, Washington.
/o.
M-
` ~ ' 7
.
!
l
SPOKANE COUNTY PLANNIN
~
PRELIMINARY SHORT PLAT APPLICATIO
~
PART I
A. SEN.RAL INFORMATION:
NA.NE OF APPLICANTIREPRESENTATIVE: j2o8FR7 LARTER..
MAILING ADDRESS: 380( S 51CY utE w DQ • .
CITY: SFbftA N& STATE: W A ZIA: 99ZO3
PHONE: (work) 535-4488 (home) &Z4" ?4lpCv
IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AU'1'HORIZATI4N
FOR APPLICANT TO SERVE AS REPRESENTATIVE.
LEGAL OWNER'S NAME: PFIONE:
MAILING ADDRESS:
PROTECT/PROPOSAL SITE AREA (acres or sy. tt) 3•2-¢ Acf-ES .:r
ASSESSOR PARCEL #S OF PROJECT/PROFOS AL 35 12 3. 14603
ADJACENT AREA OWNED OR CONTROLLED (acres or sq. ft.) -
ASSESS4R PARCEL #'S OF AD7ACENT AREA OWNED CJR CONTROLLfiD
STREET ADDRESS OF PROFOSAL Eto(v 00 lYl 15S101-) y4 UEAJ 4
,
EXISTING ZONE CLASSIFICATION(S) (DA'I'E ESTABLISHED) Z
,
EX4STP~JG IJSE OF PFtOPERTY CoMMERctA
C4MPREHENSIVE PLAN CATEGORY
SCHOOL DISTRICT SPOK4NJ Sydv~,dj,,'j
FIRE DIS'!'RICT . WATER PURVEYOR j&)ATEA 01sT 0 3
PROPOSED USfi OF PROPERTY:
Single family dwellings Duplexes Multilamily dwcllings
11>ianufactured homes IIusincss industtial C) Mixec! [Jsc
C}ther ( ) - I?escribc:
LIST PREVIOUS PLANNING DEPARTtviENT ACZ'IQNS LNVQLVING THIS PRQPERTY:
B. Y,ECAL YNFQRMATI N:
LOCATION OF PROPOS AL:
SECTI4N SW /4 I Z T4WNSHIP 25 RANGE 43
NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: M 1 Ss ~PJ AV E Al u36
WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: ~q( o
DOES THE PROPOSAL HAVE ACCESS TQ AN ARTERIAL OR PLANNED ARTERIAL (✓~YES h0
NAME(S) OF ARTERIAL ROADS M6610d Ad6pl V6
l
PRELIMlNARY SHORT PLA1 ArPLICATION Page 3 of 4
f ` [
PART II
THIS SECnaN OF THE APPLiCATTON WILL PRO'VIDE THE PLANNING DEPARTMENT STAFF WITH
WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD FRELTMINARY CONSULTATIOIr' WITH T.FE
AGENCIES IDENTIFIEY?. RESUL'I'S OF THE PRELIMINARY COrISULTATION SHAI.L BE INCORPORATED
IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT.
FIRE MARSHALL/FIRE DISTRICT
A. THIS PROFOSAL IS WITHIN FIRE PRO'1'.ECTION NO. ~
B. ADEQUA'IE ARRANGEMENTS (HAVE) aA_V-JE NO BEEN MADE TO MEfiT OUR NEEDS
IN PROVIDIING FOR AN ADEQUATE WATER SYSTEM AND T'ACILITIES FOR FIRE
PROTECTION PURPQSES.
C. RECOMMEN'DED FDRE FLOW: u h OR UNABLE TO CALCULATE h4W
BECAUSE USE IS NOT DEFINITIVE; ATID WILL BE DETERMINED AT BUII.DING PERMIT
APPLICATION TiME. /Fc"~
D . REQLJIREMENTS INCLUDE: &XdZ---
% i-
y
aiy 6v'7 6
-
~
FIIZE DISTRICT~ STGNAT'LIRE/Z'ITI.E DATE
WATER PURVEYOR
A. SATTSFACTORY ARRANGEMENTS TIC WA'IER AND FIRE FLOW
REQUIREMENTS (4Wr*twT (HAVE NUT) BEEN MADE.
B. REQvrx~MENrs/eoMMErrrs: 950rMEet-A Pk9V,~1-A& R/UV oit "'~'~~~c-~.,
04,
KvR a Pwdc.~a ~~c NAsw A~AzoN pi~~~°'~~'~`r'~ ~s mgoaw OA ~w 45A
P`voc a 5epw4f►7w v~~.¢s s:►.~ ~e 1~ia/~ JG~~E'L~ ~i►4
G 17-Y &*0
WATER DISTRICT S1GN TURF,fI"ITLE DATE
COUNTY ENGINEER
U ~
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS
AND DRAIINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT.
c~
A. C h E S: ~
.
-cl
~ ~
WlATURE/T1 DATE
CC?UNTY UTILITII?S
A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENTRAL REQUIREMENTS FOR
SUBMITTrA.L OF THIS PROFOSAL (HAVE) AVE I~I T) BEEi~ SATISFIED. THfi DESIGI~'r1~D
.
WATER PURVEYOR FOR THIS SITE 1S il2~A~Y
i
A. COMMENTS: cr ~ c~ FctaA. L.
~
CNA'TLJRE~'I'ITI.~ DATE ,
'
Z7o,,o HF,ALTH DISTRICT
A PRELIMINARY DISCUSSION HAS TAI{EN PLACE AL REQUIREMEIv'TS FaR
SUBMITTAL OF THIS PROPOSAL (HAVE) AVE NOT BEC SATISFIED.
.
A. C OMIviENTS : ~
SIG ATURE TLE DA
v
SEWER PURYEYOR
A PRELIMINARY DISCUSSION HAS TAKEiN PLACE AND GENERAL REQUIREMEhTS FOR THE
PROVISION OF PUBLIC SEWER ARE UNDERST00I? BY THE APPLICANT. • -
Afat q"c;,r,J Czy ac~/a.-~ f4,~/ e. ar-7` -;O'Js , ac
tGA-
. A. - COMMENTS: ~s~ S ~C.~•-+~~ nr ~ A
/ -2~/7
SIGNATURF./TI7LL• DATr-.
.
~
- RECEIPT' SUA4fARY
-1'RANSACTION NUMBER: T9401375, DATE;: 08/05/94
: -
APPLICANT: ,WELSH-CARTER,PARTNER PHONE=
ADDRESS: .3801 S 'SKYVIEW DR-
SPOKANE- WA 99203-2738
CONTACT IJAME : :WEI;SH-CARTER PARTNER PHONEa
TRANSACTION: PRELIMINARY-SHORT"PLAT
DOCUMENT I D : 1~)- - - - - - - 2 ) ' 3)
4) 5) 6)
COMMENTS: PARCEL N0,.35123,.1613.
FLL & PAYMENT SUMMARY-
ITEM DESCRIPTION QUANTITY, FEE AMOUNT
-
PRELIMINARY PLATS - SHORT 1 .-100.00
TOTAL ' D.tJE. = 100.00
TOTAL-PAID= 100':00
BAI:ANCE.OWING= .00
,PAYMENT DATE' RECEIPT# CHECK# PAYMENT AMOUNT
,08105/94 00008953. 1078 100.00
PROCESSED; BY: WENDEL, GLORIX
PRINTED BY:- .WEPIDEL, GLORIA
********.*************.rr********** THANK YQU ******~rr***a**************,r***,******
SPOKANE COUNTY PLANNING
PRELIMINARY SHORT PLAT APPLICATIaN
PART I
A. CENERAL INFnRMATIQN:
NAME OF APPLICANT/REPRESENTATIVE: )Po BE RT eA RTE P- 3AOKA-e5 'r wEt.S q
MAILING ADDRESS: 3so r s sK YvtE w oR-.
CITY: SpbtcANE STATE: WA ZIP: 99Z03
PHONE: (work) 536 -44 88 (home) 624'- 74lv(-p
IF APPIIICANT IS NOT OWNER, INCLUDE WRITTEiV C)WNER AUTHORIZ4TTON
RQR APPLICANT TO SERVE AS REPRESENTATZYE.
LEGAL OWNER'S NAME: ')Au4f.s 'f. \hlq"-sk+ Pl-IQNE:
hIAILiNG ADDRESS : G. 4114 SR o~ w a~ ss,p%"~ W&, mom
FROJECT/PROPOSAL SITE AREA (acres or sq. f~) 3• Z'F AcRES t
ASSESSOR PARCEL #S OF PROJECT/PROPOSAL 3S 123. Ieoa 3
ADJACENT AREA QWNED OR CONTROI.Y.ED (acres or sq. fL.)
' ASSESSOR PARCEL YS OF ADJACENT AREA OWNED OR rONTROLLED -
STREET ADDRESS OF PRO.oOSAL E66 Pt0 n')tSSra~ Ill/tnJ ULC
EXIST1NG ZONE CLASSIFICATION(S) (DATE ESTABLISNED) - Z
EXISTIT'G USE UF PROPERTY G0N-r1t17C'TV4S' O?= -F/CE' ~ y.4 ta
COMPREHENSIVE PLr1N CATEGQRY ~i✓~ l,~STi12~4 L
SCHOOL DIS'TRICT e,v L s,- t/~7 L[ E(,/ 3 b 3
~ I $~K4NE $"gvk6r~
FIRE D1ST~tICT WATER PURVEY'OR -4)A'rE1i Dis T0 3
PROPOSEU USE OF PRUPERTY:
Single family dwellings Dupl~xcs Multifamily dwcllings
Manufactured homes ( ) Busincss Industrial ( ) ?viixecf Usc ( )
Ocher ( ) - Descrabc:
LISTPREVIOUS PLANNING DEPARTNIENT ACTJONS I.NVOLVING THIS PROAERTY: 0~6
B . LEGAL INFORMATInN:
LOCATION OF PRQPOS AI.:
SEC'z7'ON SW I4 I Z TC)WNSHTP Z S RAN .GE Q3
NAME OF PUBLiC ROAD(S) PROvIDING ACCESS: M rss rDn1 411 E,J uj
WIDTH OF PROPERTY FRONTIlNG ON PUBLIC .FOAD: 19Co
DOES THE PROPOSAL HAVE ACCESS Tfl AAi ARTERIAi. OR PLANIVED ARTERIA.L (✓~YES NO
• NAME(S) OF ARTL•R1AL ROnDS mlsS/dnJ /9UEtJ06
~
S P 94
~ ~
~
PRELIlVII.NARY SHORT PL,AT APPLICATION Page 2 of 4
LL-GAL DESCRIPTION OF PROPER'N (Atcach lcgai description stampcd by Land Surveyor). INCLUDE
LEGAL DESCRIPTION FOR ENT'IRE AREA TO BE SUBDIV1llED ON PRELIMINARY SHdR"1' PL.4T.
SE~ A TT4 c N&D
IF YOU DO N4T HOLD 1 ITLE T4 PROPERTY, WHAT IS YOUR. INTEREST IN IT:' Da/NfK
c. pRELIMINAR,y SIIORT PLAT rENERAL rNFQRMAT N:
NUh'IBER OF LOTS: 3 GROSS ARL=A: 3. 21- AcR-6 t
TYPICAL LOT SIZE: I.oo° AueE PROPOSED iNET DENSITY*: I XeR Ae-RF ±
SMALLEST LOT SIZE: O, 17 Ae-R£ dvlWlMUM FRONTAGE: 14'~ ±
PROPOSED SOURCE OF W"A'TER:
tndividual wells ( ) FiIblic systcm (✓S Private Community 5ystcrri
Othcr ( ) - Dcscribc: .
PROPOSED MEANS OF SEWAGE DrSPOSAL:
Public scwer rommLtnity systcm ScpLic twnk acid drainCclc1
Double Plumbing Dry Sewer Ochcr
Describc:
UTII.M COMPANMS AIv'D/OR DISTRICTS TO PRqV1DE SERVICE TO TkiIS PROPQSAL: ,
ElecCticity: W tvp SCwcr. O'Al -51?e
Gas: W W P ti'~ater S~b e~is 4- lf 3 Phonc: cJ-S I~E S?
DO YOU, OR THE OWNCR I1ti' THE EVENT YOU DO NOT OWN 7H1S PROPERTY, HA4'E ANY
PLANS FOR FUTURE ADDITIOhS, L•XI'ANSIUNS OR F THER AC'CIVITY Rf:LAT~.ll TC, TI{lS
PROPOSAL? Ycs Na IF YES. EXPLAIN:
U. PRFI•IMINARY SHQRT PLAT ZtV~PRQ'YEMENT INF4RMATION;
LEVEL OF STREET IMPROVEMENTS PROPOSED: Privatc raads
Public roads Artcrial roads Tract X roads ~
DESCRIBE ANY COMDINATiON OF nBOvC: tJoNic-
ESTIMATED TIME PERIOD EXPECTED FOR COMPLETE pEVELOPMENT OF THE SUBDIVISION:
w i -r 14 i.*s' 3•~ as
~
IS PHASIIv TG 4F T'HE F Nr,I7ATIQN OF THE SHO RT PLAT PROE'OSED? Ycs j 1 a
IF YES, SHOW PHASING ON THE PREL.IMINARY SHORT PLAT MAP.
IS DEDTCATION OF LAND FOR P(JALIC USE C4T3TF-MPLATED (Parks, schoois, ete,)? Ycs NQ
IF YES, DESCRIBE:
* NE'1' DCNSITY IS UNITS OR L,OTS T'CR ACRE MINUS PRIVAI'E nNu/OIt PUf3LfC ftOAn ATtEA.
w O
~ ~
S P 9 7
~
.
PRELIlvfINARY SHQRT PI,AT. APPLICATION Page 3 of 4
PAR'T II
THIS SECTTON OF THE APPLICATION V4°ILL PROVIDE THE PLANNING DEPARTMENT STAFF WITH
WRI'TT'EN VF.RIFICATION THAT TI-E APPLICANT HAS HAD PRELIviIN,4,RY CONSULTATION WITH THE
AGENCIES IDEN=D. RESL'LTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED
IN THE PROPOSAL BEFORE FdNAL SUBMtTTAL TO TH.GE PLANNING DEPEIR`I'MENT.
FIRE MARSHALL/FIRE DTS7'RTCT
A. THIS PROPOSAL IS WITHIN FIRE PROTECTIOI~I Iti10. ~
B. ADEQUATE ARRANGEMENTS (HAVE) VE. N0 BEEN MADE TO MEET OLJR '1EEDS
IN PROVIDING FOR AN ADEQL;ATE WATER SYST'EM AND FACILITIES FOR FIRE
PROTECTIQN PURPOSES,
C. RECOhU2Eh'DED FIRE FLOW: u hK-. ; OR UTIABLE TO CALCULATE NOW
BECAUSE USE IS NOT DEFINITIVE; A1vD WILL BE DETERIviINLII AT BUI,I.,DING PERM1T
APPLICATTON TIME. /F~f am-
D . REQUIREdvLENTS INCLUDE: G.~-•.
~ ~ _ _ . .r G~v-{ ~ • 9
V r ~
FIRE DIS ICT + SIGNATURE/'['ITLE DATE
WATER PURVEYQR A. SATISFACTORY ARRANGEiufENTS F TIC WATER AND FIRE FLOW
REQUIREMF.rd'fS (HAVE NOT) BEEN ViADE.
B. REQUIREIviENTS/C4MMENTS: G "Tft E2 APkOV~ATAD (Z/~s✓ 4P4 y'-r,&,AG-i X- ~~hIG~~-O
~pA- a P4446444 V4A 7w,c ~4P r.,e --1,7 s~~ V46 _ 14 p,~~~.~iary is A1143o A 4w 46.t ~~pl-
~vt SgP~wrlP?X v,as,Gs t~d s.~ .
4- e~y- % ~s'~/ZFi~t~ 'i
1 r~I ~ G ~ ~i~es
WATER DISTRICT SIGN TURF.fI'ITLE ~DA~T~E
~ GnUNTX FNGINEER
A PRELIMIIVARY DISCUSSION IiAS TAKEN FLACE r'1ND GENERAL REQUIREMENT'S FOR ROADS + AND DRAINAGE HAYE BEEN DISCUSSED WITH T~TE APPL,ICANT. FCA'j
A. C IS O~
.
I NATLJRE L DATL-
~
COUNTY UTILITIES
A PRELIMINARY DISCUSSIOiv HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR
SUBMITTAI.OF THIS PROPUSAL (HAVE) ( A'vE :r) BEEN SATISFIED. THE pESTCt~r~TEI~
WATER PURVEYpR FOR THIS STTE IS Y.~
A. C0MMENTS: (o r~ol~4~L
~ YNATURE/TITLE DATE
NEALT'H UISTRICT
A PRELIMINA.RY DISCUSSION tiAS TAKEN PLAC~ ;e' ,RF C~UIRE:MENI'S FOR
SUBI~~ITT~1L OF THIS PR4PC)SAL (1~1,1~°~~ IA()T) BEEN SATISFI~FI~.
A. COMMEI~iTS: ~
, ` -~11
S IGN ATCJRELE D,4A v
SEWER rURVEYOR
A PRELIMINARX DXSCUSSION fiAS TAKEN PLACE AND GENERAL REQU1REtitLN'I'S FC?R THE
PROVISION OF PUBLIC SEWER .ARE UNDERST00 BY THE .4PPLICANT.
Ne ~o~~ a.7` ~ f.~ ~
A. • COIV[MENTS : Ce%'~ ~ T 5l%~~ ~ t S-P_ r ~eA-
~
7'
S1GNATUTtL-I'T'I"f"LC 6A7'C ~
9 7 94
~ ~
.
• s
PRELRYENARY SHORT PLAT-APPL;CA`IION Page 4 of 4
PART III
SURVEYOR VER;[FICATION
. HE, , ERSIGNED, A LICENSED LAN-D SURVEYOR, HAVE COIviPLETED THE INFOR1r1ATION
DESCRIPTI0N AND PRELIMINARY SHORT PLAT HAVE BEEN PREPARED BY ME
O~t. ~ S RVISION IN ACCORDANCE WITH THE REQUIREMENTS OF TH£ SPOKANE COUN?
S N REGULATIONS AND THE LAWS OF THE STATE OF WASHINGTQN.
~ f.. l:~ S=fo
u f DATE: o5r 1071AI
i
~ ~ . V s ,~D_.i~ nxor~E:
~ssA , ~'S~•~ .~~y_~2~ ~.C~~ ZIP: OB
~NAL LAO ~
E3~ir,ta ~ ~ ~9
PART x'V
(SIGNATURE OF PROPERTY OW'NERS OR LET'I'ER OF AUTHORIZA'TION)
I, THE LJNDERSIGNED, SWEAR OR AFFIIZM UN7JER PENALTY OF PERJ'L"RY T1-IAT THE ABOV'E
RESPONSES ARE MADE TRLt'I'HFnLY AND TO THE BEST 4F Iv1Y KTv'C7WLLUGE.
1 FURTHER SWEAR OFt AFFIRM THAT I l1lvi TWr OWNER OF f2ECORD OF TI-ir AftF-A f'Rql'OSf:Q
FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHEd
HEREWITH TS "ITTEN PERMISSIC7N F20M TiiE (aWNER AUTH4RlZING MY AC'TIC)ti`S ON HISAlER
BEHAI.F.
~
slGrED: DATE: 4~ ~f
ADDRESS: • 7~`Y".~!?J' PMOLNE: 7~gt6
I ~ / ZIP;
STATE OF WASHINGTON )
, SS:
COUN7i'Y OF SPOKANE )
SIGNED AND SWORN OR A.FFIRMED BEFORE tviE 0N THTS ~ DAY OF
, 1994, B Y ~ ~~z~1/ - - -
,
~
NOTARY SEAL ~ y--
~ _
Notary Public in and for t c SLicc of WOashington ~
Residing at:
My appaintment cxpircs: ~ . ~
PART V
(TO BE COMPLETk:ll RY TIiL PLANNING DEPARTMEN`I)
t ~
DATE ACeEPTED: B1':
TOTAL FEES: 7 84.0 D RECEIPT .s~ 2-,3
' FTLE S P- 9'7S- 9Y
~
M-w S 7
~ ~