Loading...
SP-975-94 ENGINEER'S 1tE'V'IEVV . SHEE~ •BLIDirl. PERMIT *=or =FILE# 'Rela'ted File ( Date to,Revievir 9-6=94 T'une # Date to ,AA & DR. Tiaie Date Received ~8-24=94 Project .Name BUSIlNFSS ,OFFICE ;No. lo`t.s- 3 No:Acres.. -3.2 - - - -Secct~o-n = Townsliip - Range SITE' ADDRESS N`MISSION?E FAMCHER PARCEL # 12533-1603 , Applicaat's Name ROBERT'CARfiER Fbone #535-468& Address 3$01 S SKYVIh-W'.DR. SPOK;ANE WA,.99203 Votk 624-7466 Date Copditions: mailed~'.~ ~ _ Contact pdrson Phone~Y# LOOD 2ONE V. NO W" 4 S 1, SCFIOOi: 363' ]8ngineer S,urvey,or's / Ar,ch~itecc's:.Name•' d PAUL,RAIVIEIZ & ASSOC IN.C SOS;; E JTETON TO BOX 187'79: SPOICANEfMA 99208, 467=526fFAX 467 5262 Planning..Contact -Person JQHN 7'ODD Phone 456 W, Da't_e Subnutted: D~scdprion= Initials % j AGREEMENT"TO PAYT,119S OR PRIORIT,Y h'EE COIVIFLE'IFD I8t. COPY 'POr,ACCOU_,N'I'I, FINAL PLAT-FE~ES - COMPI~wF'IF1? & 'CUPY T0,'ACCOU1V1*G ! N,OTICE 'I'O. I'U]3LIC:.#. 1 3'.4 -6 COMPLE'CED - OR NEEDS 'CO BE -.SIGNED - , - - - . / ~ , DESIGN DFVIATiON,, -S-UBMIT'!'ED AL .TERATION''TO P _I:AT - DLOCKS *-L01.'S t BONI): xtEI:-WtID -ROAD D.RAQVA,GE:"I1IRPROVEl41]aN'TS ~ H8AdNG` MCAM ;APPROVED, D`EMEU. APP_~ALEt)i•BBC •J•PRQJECI` _APPROVED DtNED, OFFICE OF THE SPOKANE COUNTY ENGINEER 1026 W Broadway Ave, Spokane, WA 99260-0170 (509)456-3600 Fax 324-3478 -SHORT PLAT REQUIREMENTS- TO: Spokane County Planning Department, John Pederson FROM: Division Of Engineering & Roads, Scott Engelhard=~i DATE: September 9, 1994 SUBJECT: SP # 975-94 / CARTER, ROBERT The following "Conditions of Approval" for the above referenced subdivision are submitted to the Spokane County Planning Department for inclusion in the "Findings and Order" should the short plat be approved. E 1 That conditional approval of the plat by the County Engineer is given subject to approval of the road system as indicated in the preliminary plat of record. E 6 No construction work is to be performed within the existing or proposed Public Right-of-Way until a permit has been issued by the County Engineer. All work is subject to inspection and approval by the County Engineer. E12 The applicant should be advised that individual driveway access permits are required prior to issuance of a building permit for driveway approaches to the County road system. E16 Existing County roads providing direct access to the plat shall be paved and/or curbed to Spokane County standards. E18 That sidewalks are required along the arterial(s) on Mission Avenue. E19 The word "applicant" shall include the owner(s) of the property, his/her heirs, assigns and successors. E20 To construct the road improvements stated herein, the applicant may, with the approval of the County Engineer, join in and be a willing participant in any petition or resolution which purposes is the formation of a Road Improvement District (RID) for said improvements pursuant to RCW 3 6. 88 , as amended. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision is applicable to Mission Avenue. E21 As an alternative method of constructinq the road improvement stated herein, the applicant may, with the approval of the County Engineer, accomplish the road improvements stated herein by joining and participating in a County Road Project (CRP) to the extent of the required road improvement. At such time as an RID is created or any Road Improvement Project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving to existing pavement) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns. This provision is applicable to Mission Avenue. E22 That the following statement shall appear within the dedicatory language of the f ina 1 plat : The owner(s) or successor(s) in interest agree to authorize Spokane County to place their name (s) on a petition for the formation of a Road Improvement District (RID) by the petition method pursuant to Chapter 36.88 RCW, which petition includes the owner(s) property, and further not to object, by the signing of a ballot, the formation of a RID by the resolution method pursuant to Chapter 36.88 RCW, which resolution includes the owner(s) property. If a RID is formed by either the petition or resolution method, as provided for in Chapter 36.88 RCW, the owner(s) or successor(s) further agree: (1) that the SHORT PLAT: # 975-94 / CARTER, ROBERT 2 improvements or construction contemplated within the proposed RID is feasible, (2) That the benefits to be derived from the formation of the RID by the property included therein, together with the amount of any County participation, exceeds the cost and expense of formation of the RID, and (3) that the property within the proposed RID is sufficiently developed. Provided, further, the owner(s) or successor(s) shall retain the right, as authorized under RCW 36.88.090, to obj ect to any assessment ( s) on the property as a result of the improvements called for in conjunction with the formation of a RID by either petition or resolution method under Chapter 36.88 RCW, and to appeal to the Superior Court the decision of the Board of County Commissioners affirming the final assessment roll. It is further agreed that at such time as an RID is created or any Road Improvement project is sanctioned by Spokane County, the improvements required (curb, sidewalk, drainage control and paving) will be at the sole expense of the undersigned owner, their heirs, grantees and assigns without participation by Spokane County. The RID waiver contained in this agreement shall expire after ten (10) years from the date of execution below. However, the owner(s) or successor(s) agree that if said RID waiver expires without construction of the required improvements, the owner(s) or successor(s) agree to construct the required improvements at their own expense; pay to Spokane County the then estimated cost of the required improvements to enable the Caunty to complete the same; or furnish a bond or other secure method suitable to the County (which may include the execution of another RID waiver agreement), providinq for or securing to the County the actual construction of the improvements. All of the requirements of this agreement shall run with the land and shall be binding upon the owner(s), their successor(s) or assign(s). This provision is applicable to Mission Avenue. E24 The County Engineer has designated Typical Roadway Section Nwmber 1 Collector Arterial Standard for the improvement of Mission Avenue which is adjacent to the proposed development. This will require the addition of approximately 10-12 feet of asphalt along the frontage of the development. The construction of curbing and sidewalk is also required. E32 The proposed plat shall be improved to the standards set forth in Spokane County Board of Commissioners Resolution No. 80-1592, as amended, which establishes regulations for roads, approaches, drainage and fees in new construction. E33 The County Engineer has examined this development proposal and has determined that the impact of this proposal upon the existing County Road System warrants the roadway improvements herein specif ied. E61 The County Arterial Road plan identifies Mission Avenue as a 70 foot wide Collector Arterial. The existing right of way width of 60 feet is not consistent with that specified in The Plan. In order to implement the Arterial Road Plan it is recommended that a strip of property 5 feet in width along the Mission Avenue frontage be set aside in reserve. This property may be acquired by Spokane County at the time when Arterial Improvements are made to mission Avenue. E90 The applicant should be advised that there may exist utilities either underground or overhead affecting the applicants property, including property to be dedicated or set aside for future acquisition. Spokane County will assume no f inancial obligation for adjustments or relocation regarding these utilities. The applicant should check with the applicable utilities and Spokane County Engineer to determine whether the applicant or utility is responsible for adjustment or relocation costs and to make arrangements for any necessary work. SPECIAL CONDITIOId: The applicant shall provide documentation to the satisfaction of the County Engineer that the lots have the right to use the easement indicated on the preliminary plat. r SH+DRfi PLAT : 9 7 5-g 4/ CARTER, ROBERT 3 SFECIAL CONDITION: Although na drainage plan is required for firializatian of the plat, the applicant is advxsed that a site drainage plan shall be required far the vacant parcel adjacent to Mission Avenue prior to release of a buildinq permit. i~~~~~e~~~~~e~eee~eeee~ee~eeeeeee~Report Viewe~fleeeeeee~ee~eeeeeeeee~eee~e~e~~~; °PAGE 1 14:28:38 25 AUG 1994 0 °Road# Road Names.......... MPost. Reference Descriptio Road Lag Info,......... 003042 MISSION AV (START) 00.000 FANCHER FRONTAGE RD U 17 PAVED 200 ° MISSIf}N AV 00.494 THTERMAN ST (END) U 17 PAVED 20 ° 00. b20 BR.ADLEY R.D (END ) U 17 FAVED 200 00.770 LILY RD {END } U 17 FAVED 20 ° 00.930 BOWMAN RD ( END ) U 17 PASIED 200 ° 00.990 FARK RD II 17 PAVED 20 ° 01,110 CENTER RD (END) U 17 PAVED 200 ° 01.130 CENTFR R.D (START ) U 17 PAVED 20 ° 01. 2 3 0 ELLA RD (END ) U 17 PAVEL} 200 ° 01.270 ~LLA RD (sTART) u 17 PAVEn 20 ° 01. 2 9 U ELT4N RD (END ) U 17 PAVED 200 °03043 MISszox Av (sTAxT) 00.000 VrsmA RD (END) U 17 ~AVED 22 ° MrSSIDN AV 00.140 BESSIE RD (END) U 17 PAVED 220 ° 00.260 SARGENT RU ( END ) U 17 PAVED 22 ° 00.330 MA.RGUERITE RD (START U 17 PAVEa 220 ° 00.510 ARGoxxE Rn (orrE wAY v16 PAVED 44 ° 00.570 MULLAN RU (ONE WAY N U 16 PAVED 440 ° 00.680 WILLC]W RD ( START ) LT 16 PAVED 36 • waaa i• • • ~ r • e~ rrs• eeeeeeeeeeCe s iers a. rr .e ~ • • • • ..e• a e ► eeeeeeeeeeee~eee~eeeeeeeeeeee~eeeeeeeeeeeeeeeeeeeeee~eeee~eef °List ° °Use Directian Keys to View Report (Press [F1] for help) a fl~~~~~~ie~i~e~~~i~~~~~~~i~i~i~aaaa~~i~i~iaa~a~~a~i~~►~~~~~a~~~~~~~~i~~~.aaa~a~~~aaaaaaaaa~~i~~i~~ °EsC-Exit Exiter-Next P2►ge ~ M ~ S i< lv 1-AT , ~ CD PLANN[NG UEPARTMENT WALI,IS D. HIJBBAItD, DIRECTA~ ~~ORANDUM M. Spokane County Division of Engineering and Rvads Spokaae County Division af Utilities Spokane Cvunty Division af Buildings Spakane Counry Health District Spokane Regionai Transportation Gouncil Spokane Cnunty Fire Distrjct # 3 5pokane Suburban Water Dist, #3 ~FR.OM: 7ahn Tadd, Planner II J- V". E I v f 0 1994 DATE: AllgUSt 23, 1994 ' - . SUBJECT: Pmliminary ShortPiat SF-375-94 Attached is a copy af the application and proposed preliminary Shart Fiat map submitted by Robert Carter snd James T. Welsh for tii+e suUdivision af 3.24 aeres into 3 lots for a contractor's office and stQrage yard and those uses permitted in the Li.ght Industrial (I-2) zane. Please review this pmposal and neturn youx comments and mcammendations by Septem.bex 6, 1994. If you have any questions regarding this file, you rnay contact me at 456-2205. Please direct any written response to John Todd. Thank yau far your prompt attention. tP Enclosures c: Robert Carter, 3801 S. Skyview Drive, Spokane WA 99243 James T. Welsh, 4114 E. Broadway, Spoane WA 99202 J. Paul Ramer, P. 0. Box 18779, 5p4kane WA 99208 WE,.S'E10~6 BR4AQVIIAY Ai~~~UF, ' SPOKA.N[Fr WP.!iNtrtiLs'~1'OdV f.3926{}-0240 ' ~509~ ~56-2205 LEGAL DESCRIPTION All that certain real property being a portion of Hlock 1, FIRST ADDITION TO ORCHARD PARK as shown and so delineated on that certain map as filed and recorded in 8ook "E", of Plats, Page 47, Official Records, Spokane County, Washington, being more particularly described as follows: The easterly 196.29 feet of Block 1, EXCEPT the South 30 feet thereof, FIRST ADDITION TO ORCHARD PARK, according to plat recorded in Volume "E" of Plats, Page 47, in Spokane County, Washington. TOGETHER WITH an easement for ingress, egress and vehicular parking purpose, over, along and across the following described property: Block 1, FIRST ADDITION TO ORCHARD PARK, according to plat recorded in Volume "E" of Plats, Page 47, in Spokane County, Washington, EXCEPT the South 30 feet, and EXCEPT the easterly 196.29 feet, and also EXCEPT the West 82 feet. ALSO, together with the right to use the spur track over and across the following described property: That portion of Tract 9, ASSESSOR'S PLAT NO. 1 recorded in Volume "C" of Plats, Page 88, in Spokane County, Washington, described as follows: Heginning at the Southwest corner of said Tract 9; thence northerly along the West line a distance of 644.04 feet to the point of beginning; thence northeasterly to a point on the northwesterly line of said Tract 9, 177.95 feet northeasterly from the northwesterly corner of said Tract 9; thence southwesterly 177.95 feet to the northwesterly corner; thence South along the West line of said Tract 9 to the point of beginning. Situated in Spokane County, Washington. /o. M- ` ~ ' 7 . ! l SPOKANE COUNTY PLANNIN ~ PRELIMINARY SHORT PLAT APPLICATIO ~ PART I A. SEN.RAL INFORMATION: NA.NE OF APPLICANTIREPRESENTATIVE: j2o8FR7 LARTER.. MAILING ADDRESS: 380( S 51CY utE w DQ • . CITY: SFbftA N& STATE: W A ZIA: 99ZO3 PHONE: (work) 535-4488 (home) &Z4" ?4lpCv IF APPLICANT IS NOT OWNER, INCLUDE WRITTEN OWNER AU'1'HORIZATI4N FOR APPLICANT TO SERVE AS REPRESENTATIVE. LEGAL OWNER'S NAME: PFIONE: MAILING ADDRESS: PROTECT/PROPOSAL SITE AREA (acres or sy. tt) 3•2-¢ Acf-ES .:r ASSESSOR PARCEL #S OF PROJECT/PROFOS AL 35 12 3. 14603 ADJACENT AREA OWNED OR CONTROLLED (acres or sq. ft.) - ASSESS4R PARCEL #'S OF AD7ACENT AREA OWNED CJR CONTROLLfiD STREET ADDRESS OF PROFOSAL Eto(v 00 lYl 15S101-) y4 UEAJ 4 , EXISTING ZONE CLASSIFICATION(S) (DA'I'E ESTABLISHED) Z , EX4STP~JG IJSE OF PFtOPERTY CoMMERctA C4MPREHENSIVE PLAN CATEGORY SCHOOL DISTRICT SPOK4NJ Sydv~,dj,,'j FIRE DIS'!'RICT . WATER PURVEYOR j&)ATEA 01sT 0 3 PROPOSED USfi OF PROPERTY: Single family dwellings Duplexes Multilamily dwcllings 11>ianufactured homes IIusincss industtial C) Mixec! [Jsc C}ther ( ) - I?escribc: LIST PREVIOUS PLANNING DEPARTtviENT ACZ'IQNS LNVQLVING THIS PRQPERTY: B. Y,ECAL YNFQRMATI N: LOCATION OF PROPOS AL: SECTI4N SW /4 I Z T4WNSHIP 25 RANGE 43 NAME OF PUBLIC ROAD(S) PROVIDING ACCESS: M 1 Ss ~PJ AV E Al u36 WIDTH OF PROPERTY FRONTING ON PUBLIC ROAD: ~q( o DOES THE PROPOSAL HAVE ACCESS TQ AN ARTERIAL OR PLANNED ARTERIAL (✓~YES h0 NAME(S) OF ARTERIAL ROADS M6610d Ad6pl V6 l PRELIMlNARY SHORT PLA1 ArPLICATION Page 3 of 4 f ` [ PART II THIS SECnaN OF THE APPLiCATTON WILL PRO'VIDE THE PLANNING DEPARTMENT STAFF WITH WRITTEN VERIFICATION THAT THE APPLICANT HAS HAD FRELTMINARY CONSULTATIOIr' WITH T.FE AGENCIES IDENTIFIEY?. RESUL'I'S OF THE PRELIMINARY COrISULTATION SHAI.L BE INCORPORATED IN THE PROPOSAL BEFORE FINAL SUBMITTAL TO THE PLANNING DEPARTMENT. FIRE MARSHALL/FIRE DISTRICT A. THIS PROFOSAL IS WITHIN FIRE PRO'1'.ECTION NO. ~ B. ADEQUA'IE ARRANGEMENTS (HAVE) aA_V-JE NO BEEN MADE TO MEfiT OUR NEEDS IN PROVIDIING FOR AN ADEQUATE WATER SYSTEM AND T'ACILITIES FOR FIRE PROTECTION PURPQSES. C. RECOMMEN'DED FDRE FLOW: u h OR UNABLE TO CALCULATE h4W BECAUSE USE IS NOT DEFINITIVE; ATID WILL BE DETERMINED AT BUII.DING PERMIT APPLICATION TiME. /Fc"~ D . REQLJIREMENTS INCLUDE: &XdZ--- % i- y aiy 6v'7 6 - ~ FIIZE DISTRICT~ STGNAT'LIRE/Z'ITI.E DATE WATER PURVEYOR A. SATTSFACTORY ARRANGEMENTS TIC WA'IER AND FIRE FLOW REQUIREMENTS (4Wr*twT (HAVE NUT) BEEN MADE. B. REQvrx~MENrs/eoMMErrrs: 950rMEet-A Pk9V,~1-A& R/UV oit "'~'~~~c-~., 04, KvR a Pwdc.~a ~~c NAsw A~AzoN pi~~~°'~~'~`r'~ ~s mgoaw OA ~w 45A P`voc a 5epw4f►7w v~~.¢s s:►.~ ~e 1~ia/~ JG~~E'L~ ~i►4 G 17-Y &*0 WATER DISTRICT S1GN TURF,fI"ITLE DATE COUNTY ENGINEER U ~ A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR ROADS AND DRAIINAGE HAVE BEEN DISCUSSED WITH THE APPLICANT. c~ A. C h E S: ~ . -cl ~ ~ WlATURE/T1 DATE CC?UNTY UTILITII?S A PRELIMINARY DISCUSSION HAS TAKEN PLACE AND GENTRAL REQUIREMENTS FOR SUBMITTrA.L OF THIS PROFOSAL (HAVE) AVE I~I T) BEEi~ SATISFIED. THfi DESIGI~'r1~D . WATER PURVEYOR FOR THIS SITE 1S il2~A~Y i A. COMMENTS: cr ~ c~ FctaA. L. ~ CNA'TLJRE~'I'ITI.~ DATE , ' Z7o,,o HF,ALTH DISTRICT A PRELIMINARY DISCUSSION HAS TAI{EN PLACE AL REQUIREMEIv'TS FaR SUBMITTAL OF THIS PROPOSAL (HAVE) AVE NOT BEC SATISFIED. . A. C OMIviENTS : ~ SIG ATURE TLE DA v SEWER PURYEYOR A PRELIMINARY DISCUSSION HAS TAKEiN PLACE AND GENERAL REQUIREMEhTS FOR THE PROVISION OF PUBLIC SEWER ARE UNDERST00I? BY THE APPLICANT. • - Afat q"c;,r,J Czy ac~/a.-~ f4,~/ e. ar-7` -;O'Js , ac tGA- . A. - COMMENTS: ~s~ S ~C.~•-+~~ nr ~ A / -2~/7 SIGNATURF./TI7LL• DATr-. . ~ - RECEIPT' SUA4fARY -1'RANSACTION NUMBER: T9401375, DATE;: 08/05/94 : - APPLICANT: ,WELSH-CARTER,PARTNER PHONE= ADDRESS: .3801 S 'SKYVIEW DR- SPOKANE- WA 99203-2738 CONTACT IJAME : :WEI;SH-CARTER PARTNER PHONEa TRANSACTION: PRELIMINARY-SHORT"PLAT DOCUMENT I D : 1~)- - - - - - - 2 ) ' 3) 4) 5) 6) COMMENTS: PARCEL N0,.35123,.1613. FLL & PAYMENT SUMMARY- ITEM DESCRIPTION QUANTITY, FEE AMOUNT - PRELIMINARY PLATS - SHORT 1 .-100.00 TOTAL ' D.tJE. = 100.00 TOTAL-PAID= 100':00 BAI:ANCE.OWING= .00 ,PAYMENT DATE' RECEIPT# CHECK# PAYMENT AMOUNT ,08105/94 00008953. 1078 100.00 PROCESSED; BY: WENDEL, GLORIX PRINTED BY:- .WEPIDEL, GLORIA ********.*************.rr********** THANK YQU ******~rr***a**************,r***,****** SPOKANE COUNTY PLANNING PRELIMINARY SHORT PLAT APPLICATIaN PART I A. CENERAL INFnRMATIQN: NAME OF APPLICANT/REPRESENTATIVE: )Po BE RT eA RTE P- 3AOKA-e5 'r wEt.S q MAILING ADDRESS: 3so r s sK YvtE w oR-. CITY: SpbtcANE STATE: WA ZIP: 99Z03 PHONE: (work) 536 -44 88 (home) 624'- 74lv(-p IF APPIIICANT IS NOT OWNER, INCLUDE WRITTEiV C)WNER AUTHORIZ4TTON RQR APPLICANT TO SERVE AS REPRESENTATZYE. LEGAL OWNER'S NAME: ')Au4f.s 'f. \hlq"-sk+ Pl-IQNE: hIAILiNG ADDRESS : G. 4114 SR o~ w a~ ss,p%"~ W&, mom FROJECT/PROPOSAL SITE AREA (acres or sq. f~) 3• Z'F AcRES t ASSESSOR PARCEL #S OF PROJECT/PROPOSAL 3S 123. Ieoa 3 ADJACENT AREA QWNED OR CONTROI.Y.ED (acres or sq. fL.) ' ASSESSOR PARCEL YS OF ADJACENT AREA OWNED OR rONTROLLED - STREET ADDRESS OF PRO.oOSAL E66 Pt0 n')tSSra~ Ill/tnJ ULC EXIST1NG ZONE CLASSIFICATION(S) (DATE ESTABLISNED) - Z EXISTIT'G USE UF PROPERTY G0N-r1t17C'TV4S' O?= -F/CE' ~ y.4 ta COMPREHENSIVE PLr1N CATEGQRY ~i✓~ l,~STi12~4 L SCHOOL DIS'TRICT e,v L s,- t/~7 L[ E(,/ 3 b 3 ~ I $~K4NE $"gvk6r~ FIRE D1ST~tICT WATER PURVEY'OR -4)A'rE1i Dis T0 3 PROPOSEU USE OF PRUPERTY: Single family dwellings Dupl~xcs Multifamily dwcllings Manufactured homes ( ) Busincss Industrial ( ) ?viixecf Usc ( ) Ocher ( ) - Descrabc: LISTPREVIOUS PLANNING DEPARTNIENT ACTJONS I.NVOLVING THIS PROAERTY: 0~6 B . LEGAL INFORMATInN: LOCATION OF PRQPOS AI.: SEC'z7'ON SW I4 I Z TC)WNSHTP Z S RAN .GE Q3 NAME OF PUBLiC ROAD(S) PROvIDING ACCESS: M rss rDn1 411 E,J uj WIDTH OF PROPERTY FRONTIlNG ON PUBLIC .FOAD: 19Co DOES THE PROPOSAL HAVE ACCESS Tfl AAi ARTERIAi. OR PLANIVED ARTERIA.L (✓~YES NO • NAME(S) OF ARTL•R1AL ROnDS mlsS/dnJ /9UEtJ06 ~ S P 94 ~ ~ ~ PRELIlVII.NARY SHORT PL,AT APPLICATION Page 2 of 4 LL-GAL DESCRIPTION OF PROPER'N (Atcach lcgai description stampcd by Land Surveyor). INCLUDE LEGAL DESCRIPTION FOR ENT'IRE AREA TO BE SUBDIV1llED ON PRELIMINARY SHdR"1' PL.4T. SE~ A TT4 c N&D IF YOU DO N4T HOLD 1 ITLE T4 PROPERTY, WHAT IS YOUR. INTEREST IN IT:' Da/NfK c. pRELIMINAR,y SIIORT PLAT rENERAL rNFQRMAT N: NUh'IBER OF LOTS: 3 GROSS ARL=A: 3. 21- AcR-6 t TYPICAL LOT SIZE: I.oo° AueE PROPOSED iNET DENSITY*: I XeR Ae-RF ± SMALLEST LOT SIZE: O, 17 Ae-R£ dvlWlMUM FRONTAGE: 14'~ ± PROPOSED SOURCE OF W"A'TER: tndividual wells ( ) FiIblic systcm (✓S Private Community 5ystcrri Othcr ( ) - Dcscribc: . PROPOSED MEANS OF SEWAGE DrSPOSAL: Public scwer rommLtnity systcm ScpLic twnk acid drainCclc1 Double Plumbing Dry Sewer Ochcr Describc: UTII.M COMPANMS AIv'D/OR DISTRICTS TO PRqV1DE SERVICE TO TkiIS PROPQSAL: , ElecCticity: W tvp SCwcr. O'Al -51?e Gas: W W P ti'~ater S~b e~is 4- lf 3 Phonc: cJ-S I~E S? DO YOU, OR THE OWNCR I1ti' THE EVENT YOU DO NOT OWN 7H1S PROPERTY, HA4'E ANY PLANS FOR FUTURE ADDITIOhS, L•XI'ANSIUNS OR F THER AC'CIVITY Rf:LAT~.ll TC, TI{lS PROPOSAL? Ycs Na IF YES. EXPLAIN: U. PRFI•IMINARY SHQRT PLAT ZtV~PRQ'YEMENT INF4RMATION; LEVEL OF STREET IMPROVEMENTS PROPOSED: Privatc raads Public roads Artcrial roads Tract X roads ~ DESCRIBE ANY COMDINATiON OF nBOvC: tJoNic- ESTIMATED TIME PERIOD EXPECTED FOR COMPLETE pEVELOPMENT OF THE SUBDIVISION: w i -r 14 i.*s' 3•~ as ~ IS PHASIIv TG 4F T'HE F Nr,I7ATIQN OF THE SHO RT PLAT PROE'OSED? Ycs j 1 a IF YES, SHOW PHASING ON THE PREL.IMINARY SHORT PLAT MAP. IS DEDTCATION OF LAND FOR P(JALIC USE C4T3TF-MPLATED (Parks, schoois, ete,)? Ycs NQ IF YES, DESCRIBE: * NE'1' DCNSITY IS UNITS OR L,OTS T'CR ACRE MINUS PRIVAI'E nNu/OIt PUf3LfC ftOAn ATtEA. w O ~ ~ S P 9 7 ~ . PRELIlvfINARY SHQRT PI,AT. APPLICATION Page 3 of 4 PAR'T II THIS SECTTON OF THE APPLICATION V4°ILL PROVIDE THE PLANNING DEPARTMENT STAFF WITH WRI'TT'EN VF.RIFICATION THAT TI-E APPLICANT HAS HAD PRELIviIN,4,RY CONSULTATION WITH THE AGENCIES IDEN=D. RESL'LTS OF THE PRELIMINARY CONSULTATION SHALL BE INCORPORATED IN THE PROPOSAL BEFORE FdNAL SUBMtTTAL TO TH.GE PLANNING DEPEIR`I'MENT. FIRE MARSHALL/FIRE DTS7'RTCT A. THIS PROPOSAL IS WITHIN FIRE PROTECTIOI~I Iti10. ~ B. ADEQUATE ARRANGEMENTS (HAVE) VE. N0 BEEN MADE TO MEET OLJR '1EEDS IN PROVIDING FOR AN ADEQL;ATE WATER SYST'EM AND FACILITIES FOR FIRE PROTECTIQN PURPOSES, C. RECOhU2Eh'DED FIRE FLOW: u hK-. ; OR UTIABLE TO CALCULATE NOW BECAUSE USE IS NOT DEFINITIVE; A1vD WILL BE DETERIviINLII AT BUI,I.,DING PERM1T APPLICATTON TIME. /F~f am- D . REQUIREdvLENTS INCLUDE: G.~-•. ~ ~ _ _ . .r G~v-{ ~ • 9 V r ~ FIRE DIS ICT + SIGNATURE/'['ITLE DATE WATER PURVEYQR A. SATISFACTORY ARRANGEiufENTS F TIC WATER AND FIRE FLOW REQUIREMF.rd'fS (HAVE NOT) BEEN ViADE. B. REQUIREIviENTS/C4MMENTS: G "Tft E2 APkOV~ATAD (Z/~s✓ 4P4 y'-r,&,AG-i X- ~~hIG~~-O ~pA- a P4446444 V4A 7w,c ~4P r.,e --1,7 s~~ V46 _ 14 p,~~~.~iary is A1143o A 4w 46.t ~~pl- ~vt SgP~wrlP?X v,as,Gs t~d s.~ . 4- e~y- % ~s'~/ZFi~t~ 'i 1 r~I ~ G ~ ~i~es WATER DISTRICT SIGN TURF.fI'ITLE ~DA~T~E ~ GnUNTX FNGINEER A PRELIMIIVARY DISCUSSION IiAS TAKEN FLACE r'1ND GENERAL REQUIREMENT'S FOR ROADS + AND DRAINAGE HAYE BEEN DISCUSSED WITH T~TE APPL,ICANT. FCA'j A. C IS O~ . I NATLJRE L DATL- ~ COUNTY UTILITIES A PRELIMINARY DISCUSSIOiv HAS TAKEN PLACE AND GENERAL REQUIREMENTS FOR SUBMITTAI.OF THIS PROPUSAL (HAVE) ( A'vE :r) BEEN SATISFIED. THE pESTCt~r~TEI~ WATER PURVEYpR FOR THIS STTE IS Y.~ A. C0MMENTS: (o r~ol~4~L ~ YNATURE/TITLE DATE NEALT'H UISTRICT A PRELIMINA.RY DISCUSSION tiAS TAKEN PLAC~ ;e' ,RF C~UIRE:MENI'S FOR SUBI~~ITT~1L OF THIS PR4PC)SAL (1~1,1~°~~ IA()T) BEEN SATISFI~FI~. A. COMMEI~iTS: ~ , ` -~11 S IGN ATCJRELE D,4A v SEWER rURVEYOR A PRELIMINARX DXSCUSSION fiAS TAKEN PLACE AND GENERAL REQU1REtitLN'I'S FC?R THE PROVISION OF PUBLIC SEWER .ARE UNDERST00 BY THE .4PPLICANT. Ne ~o~~ a.7` ~ f.~ ~ A. • COIV[MENTS : Ce%'~ ~ T 5l%~~ ~ t S-P_ r ~eA- ~ 7' S1GNATUTtL-I'T'I"f"LC 6A7'C ~ 9 7 94 ~ ~ . • s PRELRYENARY SHORT PLAT-APPL;CA`IION Page 4 of 4 PART III SURVEYOR VER;[FICATION . HE, , ERSIGNED, A LICENSED LAN-D SURVEYOR, HAVE COIviPLETED THE INFOR1r1ATION DESCRIPTI0N AND PRELIMINARY SHORT PLAT HAVE BEEN PREPARED BY ME O~t. ~ S RVISION IN ACCORDANCE WITH THE REQUIREMENTS OF TH£ SPOKANE COUN? S N REGULATIONS AND THE LAWS OF THE STATE OF WASHINGTQN. ~ f.. l:~ S=fo u f DATE: o5r 1071AI i ~ ~ . V s ,~D_.i~ nxor~E: ~ssA , ~'S~•~ .~~y_~2~ ~.C~~ ZIP: OB ~NAL LAO ~ E3~ir,ta ~ ~ ~9 PART x'V (SIGNATURE OF PROPERTY OW'NERS OR LET'I'ER OF AUTHORIZA'TION) I, THE LJNDERSIGNED, SWEAR OR AFFIIZM UN7JER PENALTY OF PERJ'L"RY T1-IAT THE ABOV'E RESPONSES ARE MADE TRLt'I'HFnLY AND TO THE BEST 4F Iv1Y KTv'C7WLLUGE. 1 FURTHER SWEAR OFt AFFIRM THAT I l1lvi TWr OWNER OF f2ECORD OF TI-ir AftF-A f'Rql'OSf:Q FOR THE PREVIOUSLY IDENTIFIED LAND USE ACTION, OR, IF NOT THE OWNER, ATTACHEd HEREWITH TS "ITTEN PERMISSIC7N F20M TiiE (aWNER AUTH4RlZING MY AC'TIC)ti`S ON HISAlER BEHAI.F. ~ slGrED: DATE: 4~ ~f ADDRESS: • 7~`Y".~!?J' PMOLNE: 7~gt6 I ~ / ZIP; STATE OF WASHINGTON ) , SS: COUN7i'Y OF SPOKANE ) SIGNED AND SWORN OR A.FFIRMED BEFORE tviE 0N THTS ~ DAY OF , 1994, B Y ~ ~~z~1/ - - - , ~ NOTARY SEAL ~ y-- ~ _ Notary Public in and for t c SLicc of WOashington ~ Residing at: My appaintment cxpircs: ~ . ~ PART V (TO BE COMPLETk:ll RY TIiL PLANNING DEPARTMEN`I) t ~ DATE ACeEPTED: B1': TOTAL FEES: 7 84.0 D RECEIPT .s~ 2-,3 ' FTLE S P- 9'7S- 9Y ~ M-w S 7 ~ ~