2014, 08-06 Permit: SW-14001138 SewerSPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001138 Permit Issued Date: 08/06/2014 Expiration Date: 08/06/2015 Project Description: PRIVATE SEWER EXTENSION Primary Contact: MJM GRAND INC Phone: 509-244-4733 Applicant: MJM GRAND INC Address: POB 9277 SPOKANE, WA 99209 Phone: 509-244-4733 Email: mark@mjmgrand.net SITE INFORMATION' Site Address: Parcel Number: Assessor's Description Inspection Area: Zoning: 17810 E 6TH AVE 55192.9020 19 25 45 E1/2 OF SE1/4 OF SE1/4 OF NW1/4 :(509)-477-3675 Owner: MEYER, ARNOLD A Address: 17818 E 6TH AVE GREENACRES, WA 99016-8748 Phone: Email: Water District: Consolidated Inigatlon Fire District: Spokane Valley Fire District #19 Land Area: 4.54 Acre(s) CONTRACTOR INFORMATION• MJMGRI'126BG, Exp. 05/09/2016 MJM GRAND INC POB 9277 SPOKANE, WA 99209 509-244-4733 mark@mjmgrand.net OFTAILS: Class Type Quantity Unit Charge Value SEWER FEE DFTAII • Processing - Utilities Utilities Permit PRIVATE SEWER EXTENSION Total Fee: $26.64 $125.00 $151.64 1 $125.00 $125.00 $125.00 CONDITIONS' Inside Public Transit Benefit Area Possible FEMA Flood Zone Possible Stream On Site Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR B INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. SEWER PERMITS ARE VALID FOR ONE (1) YEAR FROM THE DATE OF ISSUANCE. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/06/2014 09:18:51 Project Coordinator. Dawn Dompier SPOKANE COUNTY UTILITIES PERMIT Application Number: SW -14001138 Permit Issued Date: 08/06/2014 Expiration Date: 08/06/2015 INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 081062014 09:18:51 Project Coordinator: Dawn Dompier