Loading...
2012, 06-11 Permit: SW-12001521 SewerSPOKANE COLjNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001521 Permit Issued Date: 06/11/2012 Expiration Date: Project Description: SEWER CONNECTION Project Name: CARNAHAN Permit Type: SEWER Primary Contact: CUNNINGHAM, DANIEL Applicant: CUNNINGHAM, DANIEL Address: 4403 E 7TH AVE SPOKANE, WA 99212-0389 Phone: Email: SITF INFORMATION• Site Address: Parcel Number: Subdivision: Assessors Description: Inspection Area: Zoning: 4403 E 7TH AVE 35232.4005 CARNHOPE ADDITION CARNHOPE ADD L7 EXC S72FT OF W4FT;W1/2 L8 B11 Owner: Address: Phone: Email: CUNNINGHAM, DANIEL 4403 E 7TH AVE SPOKANE, WA 99212-0389 Water District: Camhope Fire District: Spokane Valley Fire Irrigation District#7 Land Area: 0.2258 acres / 9837 sqft CONTRACTOR INFORMATION' Owner Acting As Builder OWNER OWNER NOT KNOWN AT TIME OF ENTRY UNKNOWN, UK 00000 nFTAILS• Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAII • Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS. CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. Date Printed: 08/11/2012 13:45:59 Printed by: IIS APPPOOL ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001521 06/11/2012 Expiration Date: INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 06/11/2012 13:45:59 Printed by:115 APPPOOLIASP.NET v4.0