2013, 02-08 Permit: SW-13000062 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -13000062
Permit Issued Date:
02/08/2013
Expiration Date: 02/09/2013
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
CARNAHAN
SEWER
Primary Contact: MCELHANEY, BARRY 8 LORI
Applicant: MCELHANEY, BARRY 8 LORI
Address:
Phone:
Email:
4510 E 7TH AVE
SPOKANE, WA99212
509-535-7668
SITE INFORMATION•
Site Address:
Parcel Number:
Subdivision:
Assessors Description:
Inspection Area:
Zoning:
4510 E 7TH AVE
35232.4413
CARNHOPE ADDITION
CARNHOPE ADD LT 4 BLK 15
Owner:
Address:
Phone:
Email:
MCELHANEY, BARRY 8 LORI
4510 E 7TH AVE
SPOKANE, WA 99212
509-535-7668
Water District: Carnhope Fire District: Spokane Valley Fire
Irrigation District #7
Land Area: 6750 Square Feet
CONTRACTOR INFORMATION'
Owner Acting As Builder
OWNER
OWNER PERFORMING THE WORK
SAME AS SITE ADDRESS
SAME, WA 00000
DETAILS'
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DFTAII •
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$26.32
$125.00
$151.32
CONDITIONS'
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
CALL 1-800424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR 8 INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 02/08/2013 10:05:42
Printed by: IIS APPPOOUSmartGovProdApp
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -13000062 02/08/2013
Expiration Date: 02/09/2013
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Panted: 02/08/2013 10:05:42 Panted by: 115 APPPOOL\SmartGovProdApp