Loading...
HomeMy WebLinkAbout2012, 09-18 Permit: SW-12002232 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12002232 Permit Issued Date: 09/18/2012 Expiration Date: Project Description: Project Name Permit Type: SEWER CONNECTION - CONNECTED TO DRYLINE CARNAHAN SEWER Primary Contact: JONES, CURTIS L & CATHERINE A Applicant Address: Phone: Email: JONES, CURTIS L & CATHERINE A 4518 E 7TH AVE SPOKANE, WA 99212-0319 SITE INFORMATION: Site Address: Parcel Number: Subdivision: Assessors Description: Inspection Area: Zoning: 4518 E 7TH AVE 35232.4411 CARNHOPE ADDITION CARNHOPE ADD LT 2 BLK 15 Owner: Address: Phone: EmaIl: JONES, CURTIS L & CATHERINE A 4518 E 7TH AVE SPOKANE, WA 99212-0319 Water District: Camhope Fire District Spokane Valley Fire Irrigation District#7 Land Area: 6750 Square Feet CONTRACTOR INFORMATION• Owner Acting As Builder OWNER OWNER PERFORMING THE WORK SAME AS SITE ADDRESS SAME, WA 00000 DETAILS' Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL: Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS' Inside Public Transit Benefit Area Plan review fee Is required for all site plan reviews conducted by Spokane Valley Fire. Possible FEMA Flood Zone Date Printed: 09118/2012 15:37:24 Printed by: 118 APPPOOLWSP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12002232 09/18/2012 Expiration Date: CALL 1-800.424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. J INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 09/18/2012 15:37:24 Printed by: IIS APPPOOLNSP.NET v4.0