2012, 07-12 Permit: SW-12001741 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001741
Permit Issued Date:
07/12/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
CARNHOPE
SEWER
Primary Contact: TONER'S EXCAVATING
TONERS EXCAVATING
4321 E ELOIKA
CHATTAROY, WA 99003
509-292-2360
Applicant:
Address:
Phone:
Email:
SITE INFORMATION•
Site Address:
Parcel Number:
Subdivision:
Assessor's Description
Inspection Area:
Zoning:
4523 E 7TH AVE
35232.3910
CARNHOPE ADDITION
CARNHOPE ADD L12B10
Owner.
Address:
Phone:
Email:
BARRY, BARBARA JO/PETTY, TIMOTHY
S
2662 E 33RD AVE
SPOKANE, WA 99223-4603
Water District: Camhope Fire DIstdct: Spokane Valley Fire
Irrigation District #7
Land Area: 6750 Square Feet
CONTRACTOR INFORMATION'
Genera! Contractor
TONERE*025NP
TONER'S EXCAVATING
4321 E ELOIKA
CHATTAROY, WA 99003
509-292-2360
DFTAILS.
Class
Type
Quantity Unit Charge Value
SEWER
SEWER CONNECTION
FEE DETAIL.
Processing - Utilities
Utilities Permit
1
$125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS'
Possible Floodzone On Site
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 07/12/2012 13:07:08
Printed by:115 APPPOOLV SP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001741 07/12/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED, PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 07/12/2012 13:07:08
Printed by: IIS APPPOOLtkSP.NET v4.0