Loading...
2012, 07-12 Permit: SW-12001741 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number: SW -12001741 Permit Issued Date: 07/12/2012 Expiration Date: Project Description: Project Name: Permit Type: SEWER CONNECTION CARNHOPE SEWER Primary Contact: TONER'S EXCAVATING TONERS EXCAVATING 4321 E ELOIKA CHATTAROY, WA 99003 509-292-2360 Applicant: Address: Phone: Email: SITE INFORMATION• Site Address: Parcel Number: Subdivision: Assessor's Description Inspection Area: Zoning: 4523 E 7TH AVE 35232.3910 CARNHOPE ADDITION CARNHOPE ADD L12B10 Owner. Address: Phone: Email: BARRY, BARBARA JO/PETTY, TIMOTHY S 2662 E 33RD AVE SPOKANE, WA 99223-4603 Water District: Camhope Fire DIstdct: Spokane Valley Fire Irrigation District #7 Land Area: 6750 Square Feet CONTRACTOR INFORMATION' Genera! Contractor TONERE*025NP TONER'S EXCAVATING 4321 E ELOIKA CHATTAROY, WA 99003 509-292-2360 DFTAILS. Class Type Quantity Unit Charge Value SEWER SEWER CONNECTION FEE DETAIL. Processing - Utilities Utilities Permit 1 $125.00 $125.00 Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS' Possible Floodzone On Site Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 07/12/2012 13:07:08 Printed by:115 APPPOOLV SP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number: SW -12001741 07/12/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED, PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Date Printed: 07/12/2012 13:07:08 Printed by: IIS APPPOOLtkSP.NET v4.0