Loading...
2010, 08-30 Permit App: 10002650 FoundationProject Number: 10002650 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Date: 8/30/2010 Page 1 of 2 Protect Information: Permit Use: FOUNDATION FOR RELOCATED HOME Contact: WOOD, SAM Address: 1520 S DAVID RD C - S - Z: SPOKANE, WA 99212 Setbacks: Front Left: Right: Rear: Phone: (509) 534-2000 Group Name: Project Name: Site Information: Plat Key: 000323 Name: CARNHOPE ADD District: Sout Parcel Number: 35232.4509 Block: Lot: SiteAddress: 4602 E 7TH AVE Owner: Name: WOOD, SAM Address: 1520 S DAVID RD SPOKANE, WA 99212 Location:: CSV Zoning: R-3 SF Res District Water District: 003 CARNHOPE Hold: ❑ Area: 1,750.00 Acres Width: 50 Depth: 135 Right Of Way (ft): 60 Nbr of Bldgs: 1 Nbr of Dwellings: 1 Review Information: Review Building Plan Review Relea Originally Released: 8/30/2010 By: Bdbebout Landuse/Zoning/HE Conditions ReleA3dd;Bj Sewer Review Permits: Originally Released: 8/26/2010 By: KKENDAL leased By: Originally Released: 8/26/2010 By: jdavis Operator: JD Printed By: jmm Print Date: 8/30/2010 Project Number: 10002650 Inv: 1 Application THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Building Permit Firm: OWNER Date: 8/30/2010 Contractor: OWNER Group: R-3 Type: VB Total Area 968 Phone: Building Characteristics Description j n TVPe 1&2 FAMILY 14-3 VB BASEMENT U R-3 VB Item Description RESIDENTIAL PERMIT FEE WSBCC SURCHARGE SF PLNS RVW < 7999 SQ FT Notes Contractor: OWNER Item Description WATER HEATER - ELECTRIC FLOOR DRAINS WATER PIPING - DWV Notes: Page 2 of 2 (000) 000-0000 This Application: Sq Ft Valuation 968 $95,783.60 968 $14,520.00 Total Project: Sa Ft Valuation 968 $95,783.60 968 $14,520.00 Totals: 1,936 $110,303.60 Units Unit Desc 1 SELECT 1 SFI FCT 1 SELECT Permit Total Fees: Plumbing Permit 1,936 $110,303.60 Fee Amount $1,055.35 $4.50 $422.14 $1,481.99 Firm: OWNER Phone: (000) 000-0000 Units Unit Dose 1 NUMBER OF 1 NUMBER OF 1 NUMBER OF Permit Total Fees: Fee Amount $6.00 $6.00 $6.00 $18.00 Payment Summary: Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Building Permit $1,481.99 $1,481.99 $422.14 $1,059.85 Plumbing Permit $18.00 $18.00 $0.00 $18.00 $1,499.99 $1,499.99 $422.14 $1,077.85 Disclaimer: Submittal of this application certifies the owner (or person(s) authorized by the owner) has both examined and finds the information contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: jmm Print Date: 8/30/2010 jam. Comnriity Development ,Mechanical Permit Application Permit Center 11703 B Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX (509)688-0037 permitccnter(alsppkanevallev ore PERMIT NUMBER:2Q'() PERMIT FEE: 33- ❑ Commercial n Residential SITE ADDRESS: Building Owner Name: .5f1'IY) P also o Address: Centraetor /,C'20 r. Oi9T/in St— Phone: 5' 9_fl V-- 2 ) Far SolS3f<`z3�i ty' Zip: 4.. .a. 7 Ci kan (J State: /R.Ii-� Name: Phone: Fax Address: City. Stale: Zip: License No: City Business Lie: Contact/Project Manager: Name: Phone: OCASH D CHECK D VISA DMC CARD R EXPIRES: SIGNATURE VIN: hitpl/www.spokanevalley.ory/uploeds/Community-Development/Documents/Forts/Building/MecbanicalPetmitApplication040309.dos &UNITS FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Up to & including 100 000 BTU FURNACES & SUSPENDED HEATERS -INSTALLATION OR RELOCATION Over 100,000 BTU DUCT WORK SYSTEM ' HEAT PUMP/AIR CONDITIONER 0-3 TON AIR CONDITIONER Over3-15TON AIR CONDITIONER Over 15-30 TON MR CONDITIONER Over 30-50 TON AIR CONDITIONER Over 50 TON GAS WATER HEATER GAS PIPING SYSTEM (each outlet) GAS LOG, FIREPLACE, & GAS INSERT APPLIANCE VENTS INSTALATION, RELOCATION, REPLACEMENT REPAIRS OR ADDITIONS BOILER, COMPRESSORS, ABSORPTIONS SYSTEM 0 to 3 hp -100,000 BTU or less BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 3- 15 hp — 100 001 to 500000 BTU BOILER, COMPRESSORS, ABSORPTIONS SYSTEM Over 15— 30 hp - 500,001 to 1000,000 BTU BOILER, COMPRESSORS ABSORPTIONS SYSTEM Over 30 hp — 1,000,001 to 1,750,000 BTU BOILER COMPRESSORS, ABSORPTIONS SYSTEM Over 50 hp — over 1,750,000 BTU AIR HANDLER (DOES NOT Include ducting) Each unit up to 10,000 efm, including ducts AIR HANDLER (DOES NOT include ducting) Each unit aver 10,000 cfm EVAPORATIVE COOLERS(other than portables) VENTILATION AND EXHAUST Each fan connected to a singe duct • VENTILATION AND EXHAUST Each ventilation system VENTILATION AND EXHAUST Each hood served by mechanical exhaust INCINERATORS installation or relocation of residential INCINERATORS Installation or relocation of commercial APPLIANCES Range, Clothes Washer UNLISTED APPLWNCES Under 400,000 BTU UNLISTED APPLIANCES over400,000 BTU HOOD Type I H000 Type II L P STORAGE TANK WOOD OR PELLET STOVE INSERT WOOD STOVE SYSTEM — FREE STANDING OCASH D CHECK D VISA DMC CARD R EXPIRES: SIGNATURE VIN: hitpl/www.spokanevalley.ory/uploeds/Community-Development/Documents/Forts/Building/MecbanicalPetmitApplication040309.dos Spokane jValley° Community Development Residential Construction Permit Application ermit enter 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 www.spokarievalley.org PERMIT NUMBER: PERMIT FEE: ?M New Construction n Addition/Remodel n Other: Accessory Bldg Deck SITE ADDRESS: ASSESSORS PARCEL NO: 3 , 23 2 Lt_0 F LEGAL DESCRIPTION: 0-kMA0r) /b — ,DkI Building Owner: DIMENSIONS' Name: tlrYz�% /J Name: Address: ls-26 ciav_r_ji iSf 2""FLOO SQ. FTG: City: !A= 4i/' ' / l r State: Zip: p Phone: i-- n��� Fax: City: Contact CPPerson Name: J/9-21/ l,()d/V Phone: ,O ? — ,r3 -- 2 ) Describe the scope of work in de a1: Cost of Project: $ Contractor: DIMENSIONS' # OF STORIES:/ Name: MAIN FLOOR T/OS5,S FTG: 2""FLOO SQ. FTG: Address: IMPERVI�US SURFACE AREA: i �M FINISHED BASEM NT SQ. FTG: / City: State: Zip: Phone: Fax: MSUCTJPE: Contractor Lic No: Exp Date: City Business Lic. No: Proposed Use: house an6 **************The following MUST be complete: (write N/A if not applicable)********************** HEIGHT TO PEA}<: l DIMENSIONS' # OF STORIES:/ TOTAL HAB E SPACE: MAIN FLOOR T/OS5,S FTG: 2""FLOO SQ. FTG: UNFIN BASEMENT SQ. FTG; // �y 62 IMPERVI�US SURFACE AREA: i �M FINISHED BASEM NT SQ. FTG: / GARAGTG: DECK/, PATIO SQ. FTG: 2 7 -CJ 30% SLOPES ON PROPERTY: /)a w OF BEDROOMS: MSUCTJPE: HEAT % SEWERJJRaJ?e# The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the frSpokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit nter. 5) This City of Spey ne Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordina ces. 6) Plans or addition information may be required to be submitted, and subsequently approved before this application can be proce sed. ^ ,_ SIGNATURE: Method of Payment: ❑ Cash Bankcard #: Authorized Signature: REVISED 2/15107 Check ❑ Mastercard Expires: DATE: • ❑ VISA CSV PERM T CENTER VIN#: AUG 2 22. _010 Project #__ (2-� N<me.__--- - �LS!abmittal.__- RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. o SITE PLAN o Property lines and dimensions o Direction arrow pointing North and orientation to streets o Proposed/existing buildings (footprint and dimensions) o Utilities, septic tank/drain field locations and dist r cis o Setbacks to property lines o Distance between buildings o Right of way/easement location & sizes 3Drivgyyay agproach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) o Elevations (Front/Rear/Sides) with roof peak and wall height including basement: o Foundation Plan (crawlspace, basement or slab on o Footing sizes and locations o Perimeter concrete foundation wall sizes o Crawlspace ventilation grade): o Supporting wood cripple walls or beams o Thickened concrete pads supporting beams or girder trusses O Floor Plan of each level (finished or unfinished) with dimensions: o Floor Joist direction size and spacing o Header, beam or concrete lintel sizes o Brace wall panel locations o Water heater and furnace locations o Exhaust fan locations o Deck or concrete patio sizes and locations 0 Roof Plan: o Engineered truss direction and spacing o Rafter and over frame direction, size and spacing ❑ Wall Section Detail Including: Roof o Slope/ roofing material/ underlayment/ ice dam protection o Sheathing size and type Ceiling o Joist size and spacing Wall o Height/ top plate/ stud size and spacing/ sole plate o Exterior sheathing size and type Floor o Joist size and spacing Foundation Wall o Concrete or Masonry unit width o Earth to wood separation distance Footing o Size Radon o Passive system with Emil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/ side view/ dimensions o Floor Joist/ decking direction, size and spacing O Stairway tread rise & run and nosing o Window and door location and sizes o Window well locations if applicable o Room usage labels o Smoke detector locations o Attic and crawl space access locations o Fire Wall construction o Ridge, eave and valley lines o Beam and girder size and location o Truss or rafter size, spacing & connection o Attic insulation/ air space baffle/ ventilation o Size of ceiling gypsum wall board o Siding/ exterior house wrap/ anchor bolts o Insulation, vapor barrier, gypsum wall board o Sheathing or concrete floor size/ insulation o Footing bottom to finished ground level depth o Horizontal & vertical reinforcement if any o Reinforcement if any o Active system with 6 mil vapor barrier o Footings/ post/ and beam size and locations o Handrail / Guard height & spacing Permit Center 11703 E Sprague Ave, Suite B-3 Spokane Valley, WA 99206 (509)688-0036 FAX: (509)688-0037 permitcenter(a?spokanevallev.orF Community Development Plumbing Permit Application SITE ADDRESS: PERMIT NUMBER: PERMIT FEE: ❑ Commercial ❑ Residential Chimer Name. 61-14, Phone di Pax: e.-- P- — J Gci rrj S O eQ/y�,// L Ci y 19/ State: C Zip: Address: S S e //7//40 S/ 9I/: / % .allisi� Contractor Name: Phone: Fax: Address: City: State: Zip: License City Business Lic: Covtact/Projec[Mevag /Pr Name: Phone: # OF UNITS PLUMBING FIXTURE ON ATRAP TOILETS URINALS TUBS SHOWERS (per trap) SINKS Lav/Basins, Bar, Floor, Kitchen. Laundry. Utility, Janitor, Photo, X-ray, Food, Prep/Culinary Meat DISHWASHER CLOTHES WASHER GARBAGE DISPOSAL WATER SOFTNER FLOOR DRAIN Area, Case, Coil, Trench, Condensate / ROOF DRAIN/OVERFLOW DRAINS FOUNTAIN, DRINKING WATER PIPING/DRAIN-IN WASTE Installation, Alterations, Repair, Reversals 1 WATER USING DEVICE Ice andlor Coffee maker, hose bib, steamer erecter, carbonator, swamp cooler PRIVATE SEWAGE DISPOSAL SYSTEM u , WATER HEATER It Gas, See Mechanical / INDUSTRIAL WASTE PRETREATEMENT INCEPTORS Including traps, vents except kitchen type grease Interceptors functioning as fixture traps REPAIR OR ALTERATION Water piping, drainage or vent piping ATMOSPHERIC TYPE VACUUM BREAKER BACKFLOW PROTECTIVE DEVICE Other than atmospheric type vacuum breakers MEDICAL GAS INCEPTORS OCASH CHECK O VISA 0 MC EXPIRES: Card# '^ VIN: SIGNATURE: �t . CURRENT FEES AVAILABLE AT: http://wmw.spokanevalley.orq/ under the quick links for Forms, Master Fee Schedule. httpl/wwwspokanevalley.org/uploads/CommuNty_Development/DocumenLUPonns/Building/PlumbingPermitApplication040309.riot Borrower Sam P Wood Property Address 4602 E 7th Ave SKETCH ADDENDUM Site N. Al File No 40282nd City Spokane Valley County Spokane Lender/Client Bank of America/Eappraiseit State Wa Zip Code 99212-0378 Address 5 Cherry Hill Dr Danvers, MA 01923 135.0' --I m 50.0' POWER LINE 28.0' 18.0' 30')13� woe DRIVEWAY 1 7th Ave 50.0' -, 35.0' RECEIVED CS'! PERMIT CENTER 0 ; AUG 2 ►; 2019 Project #_____X.C)OCktrott. ffubmitt_f # - Site Information SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Project Information Site Address: 4602 E 7TH AVE Parcel fs'umber: 35232.4509 Subdivision: CITY OF SPOKANE VALLEY Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: WOOD, SAM ddress: 1520 S DAVID RD SPOKANE, WA 99212 Building Inspector: MARK WALKER Wa er Dist: Project Number: 10004470 Inv: 1 Issue Date: 8/25/2010 Permit Use: SEWER CONNECTION Applicant: WOOD, SAM 1520 S DAVID RD SPOKANE, WA 99212 Phone: (509) 534-2000 Contact: WOOD, SAM 1520 S DAVID RD SPOKANE, WA 99212 Phone: (509)534-2000 Setbacks - Front: Left: . Right: Rear: Group Name: Project Name: Permits Sewer Co ecion Permit Contractor: OWNER License#: OWNER PROCESSING FEE 1 $15.00 SI SEWER CONNECTION 1 $125.00 Total Permit Fee: $140.00 **F R SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO CO ER ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INS ECTION FEES APPLY AFTER 30 MINUTES. **C L 1-800-424-5555 BEFORE YOU DIG --AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQ RES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INC UDING THOSE RELATED TO TRENCH SAFETY. **IN TALLER I5 RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE QUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. **SEWER STUBS' AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. **THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOT 3 STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION. TO OWE ERS OF UNDERGROUND FACILITIES. Payment Summary To al Fees AmountPaid AmountOwinv Tran Date Receipt # Payment Amt 140.00 $140.00 $0.00 8/25/2010 3658 $140.00 Processed By: SHATTO, JULIE Printed By: Force, Faith Page I of 1 RECEIVED CSV PERMIT CENTER dF_l AgUG 2020110� Project vy�r[.tg-�° PERMIT" N2 RW BLL.3n I, V _ Spoka � jUalley For City Use Only PLUS Project Number t O X5?- --;o Project Address `f L-Voge- 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.688.0036 • Fax: 509.688.0037 • permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. \(\ Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review D Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. i Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments Would be the best choice for the entire review process. D Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE -APPLICANT PINK - BUILDING FILE REV 9107