2012, 09-11 Permit: SW-12002176 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12002176
Permit Issued Date:
09/11/2012
Expiration Data:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
CARNAHAN
SEWER
Primary Contact: GOBER'S LLC
Applicant: GOBER'S LLC
Address: 11215 E TRENT AVE ,
SPOKANE, WA 99206
Phone: 509-924-5372
Email:
SITE INFORMATION:
Site Address:
Parcel Number.
Subdivision:
Assessor's Description
Inspection Area:
4615E7TH AVE
35232.3806
CARNHOPE ADDITION
CARNHOPE ADD L9B9
Owner:
Address:
Phone:
Email:
WATSON, JIM & DELLENE
17045 13TH AVE
SHORLINE, WA 98155
Water District: Carnhope Fire District: Spokane Valley Fire
Irrigation District #7
Zoning: Land Area: 6750 Square Feet
CONTRACTOR INFORMATION
General Contractor
GOBERL*899L7
GOBER'S LLC
11215E TRENT AVE
SPOKANE, WA 99206
509-924-5372
DETAILS'
Class
Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DFTAIL;
Processing -Utilities
Utilities Permit
1 $125.00 $125.00
$125.00
Total Fee:
$25.94
$125.00
$150.94
CONDITIONS:
Possible FEMA Flood Zone
Inside Public Transit Benefit Area
Plan review fee is required for all site plan reviews conducted by Spokane Valley Fire.
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
Date Printed: 09/11/2012 12:56:50
Printed by: IIS APPPOOLNSP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12002176 09/11/2012
Expiration Date:
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 09/11/2012 12:56:50
Printed by; IIS APPPOOLMSP.NET v4.0