Loading...
2003, 02-27 Permit App: 03001191 Demolitioncif,J.7 — V t—i '-J WN - Agency Case No. /� 03 —0CLJ Agency Use Only SPOKANE COUNTY AIR POLLUTION CONTROL AUTHORITY 1101 West College Suite 403. Spokane, WA 99201 NOTICE OF INTENT TO PERFORM: "D3teR- .i FES 2 7 Agency Use Only eT 2003 UN(pYmAyI A. Project Type: 1. ❑ Asbestos Removal 2. U Asbestos Removal & Demolition 13.�DemolitiO tl-Np As��,elsf nU l U B. Property p Owner: C. 'i . Cetioie Phone: �) t'9,3 22-113 Property Owner's C �y,''' Mailing Address: 1108 6, 3/' /9t)t ` City -lo ne U0..l1. II' State: 1J & Zip9.92 ttY C. Asbestos nMnEea.NTCLntnr. nlnala ae mm.BTn.N,NINNQ,.REL Contractor: Contractor Owner/CEO: Mailing Address: Phone: ( ) Contract Job No.: City: State: Zip: _ Fax: ( ) D. Site Address: 7°207 e 7 `-(/ City k2.nC f2il4„ state:WA__ Zp:992c Project Manager or p \ Contact Person: C -!K , kedOlc (-caj ) - r 3`� `� J hone: (83 )Z2-54 3 \ E. '� ❑ Asbestos Survey or Mat'I Presumed: No. of Structures: / Date Survey was / / Conducted: Z ZO 03 rr, Was Asbestos Found? hA Y ❑ If No, Attach Survey AHERA Building leslSURVEY"EQUIRD)JUOa"LC Daly '1la. eROJerIsawl. AS Inspector Name: E G r, 00 [is rRonoev"CI 32/Jrsaa Certification No.: 02-V Z9S Expiration Date: l2/'f/0: F. Demolition No. of Structures: / Start Date: 3/8 I0 3 U Training Fire (List Fire Dept. as demolition contractor beimInfonnatioa: 0 Ordered Demolition (attach copy of Order) Demolition PRINTNM@ HERE INTER *WLJNGG ACOR<MIN BOY J ON BACK IF TRAINING BURN ENTER ARE DEPT. HERE Contractor: /'Jy` y' Phone: ( ) % C. Asbestos Project No. of Structures Start., In / Completion Wk. Days: 4 T -��,% b;e.: .1 Information: (see back if> 1) / Date: 016 O 3 Date: 3//i�o 3 Hours: - p.,,. ra,... �oo�% Total Quantity to be Removed: �inear Ft. 3 & 6 quare Ft. Will all asbestos material be � Yr removed by project completion? 0 N Thenal System Insulation: I U BoilWFurnace Ins. U Duct Ins. LI Pipe Ins. Other. Surfacing Mat'l: 0 Fireproofing 0 Paints 0 Plaster 0 Textured Coatings Other: Misc. Mani: I U Cement Bd. ❑ Cement Pipe 0 Flooring Mat'I ,"Roofing MaVI Other: n1e4.-, +t-4g.4D ate, EL Asbestos/Demolition Project Categories: u 1. ACI Owner -Occupied Residential Asbestos Removal & Demolition Project 0 Owner -Occupied Residential Demolition Project, No Asbestos Removal Notification Project Fee Waiting Period NON-REFUNDABLE 525 `iriolblotice 2. 0 All Other Demolitions With No Asbestos Removal Project 10 Days $150 3. U 10 - 259 linear feet or 48 - 159 square feet (see back of form for options) 3 Days $150 4. U 260 - 999 linear feet or -I60 - 4,999 square feet 10 Days 5300 5. ❑ 1,000 - 9,999 linear feet or 5,000 - 49,999 square feet 10 Days 5750 6. ❑ > 10,000 linear feet or> 50,000 square feet 10 Days 51,500 7. 0 Emergency Asbestos Project or ❑ Emergency Demolition Project Prior Notice Twice Project Fee 8. ❑ Altemate Means of Compliance for friable materials or ❑ Demolitions 10 -Day Review Period Twice Project Fee 9. U Altemate Means of Compliance for nonfriable asbestos materials Concurrent with Project Twice Project Fee r Id o hcmby unify that Ne mformatlon contained in this notification, and supplemental data described herein, is to the best of my knowledge accurate and complete. 1 shall not cause or allow any asbestos project or demolition activities to begin until the appropriate waiting period has elapsed. C t4 thea khd 7 '7-mar/ago Signature prerentin Date Completeness Review Performed By: Notice of Intent (66-160B8)1/98, 11/99 Agency ,