Loading...
2014, 04-02 Permit App: BLD-2014-0608 DuplexSpokane Valleyxi Community Development Department Permit Center 11703 East Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Tel: (509) 688-0036 Fax: (509) 688-0037 permitcenter spokanevallev.orq RESIDENTIAL CONSTRUCTION PERMIT XNEW CONSTRUCTION NI ADDITION/REMODEL DECK Q OTHER SITE ADDRESS: "7.3 /0 E 7on/v& (Staff Use Only) PERMIT NUMBER: PERMIT FEE: APO CATION ACESSORY BUILDI14') APR 0 2 2014 Pik" ASSESSORS PARCEL NO.: J 2'f('. y0/O LEGAL DESCRIP BUILDING OWNER NAME: /,1' FD M ON: CSV PERMIT CFNTFR SUR 4L NAME: de;ek k ADDRESS: '7J © LC � awe._ CITY: .5/7.0 l` 0i to UQf4' STATE: b/i" f ZIP: 9492 2 , z_ PHONE: L! oq. 362 lg g2-- CONTACT NAME: FAX: CELL: 3 Z /S9 PHONE: FAX: CELL: CONTRACTOR NAME: �� MAILING ADDRESS: ,ante,..... Crrv:. STATE: ZIP:• PHONE: FAX: CELL: CONTRACTOR LICENSE No.: ed /OIN 9 DESCRIBE THE SCOPE OF WORK Rene EXP Y' ES: FA -0/f5'. CITY BUSINESS LICENSE NO.: I. //O 7!'97281s DETAIL AND INDICATE USE & PROPOSED USE: MUST COMPLETE THE FOLLOWING**** OT APPLICABLE Height to Peak:t -3z/i Dime ions: o /�'� No. of Stories: Total Habitable Space: /4 Main Floor SQ FT:M O �O Upp r Floor SQ FT:02 Unfinished Basem nt SQ FT: Finished Basement SQ FT: Garage SQ FT• ���� De lc/Cover d Patio SQ FT. "4., Impervious urface Area: 30% Slopes on ~� Property: / No. of Bedrooms: 4 onstruction Type: Frame Heat Source: �Gi s Sewer or Septic:..01,/ext TOTAL COST OF PROJE DISCLAIMER The permitted verifies, acknowled be served by potable water. 2) owner or has permission to repr Spokane Valley Development Spokane Valley permit is not information may be required t Signature T: $ Oa!,Oft es and agrees by their signature that: 1) if this permit is for construction or on a dwelling, the dwelling is/will wnership of this City of Spokane Valley permit inure to the property owner. 3) The signatory Is the property sent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of de. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) The City of permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans or additional be submitted and subsequently approved before this application can be processed. Com. Date: Updated 1-11-11 ° Page 1 of 1 http://www.spokanevalley.org/filestorage/124/938/210/948/ 1496/Building_Permit_-_Residential_11-11-11.doc RESIDENTIAL CHECK LIST DIRECTIONS: Place a check mark in box next to each document required for complete submittal. /SITE PLAN /Property lines and dimensions /ID rection arrow pointing North and orientation to streets ger Proposed/existing buildings (footprint and dimensions) /Utilities, septic tank/drain field locations and distances /Setbacks to property lines gl Distance between buildings ,e Right of way/easement location & sizes /Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 Inch scale or completely dimensioned) .Elevations (Front/Rear/Sides) with roof peak and wall height including basement: /Foundation Plan (crawlspace, basement or slab on grade): /Footing sizes and locations .../Supporting wood cripple walls or beams /Perimeter concrete foundation wall sizes /Thickened concrete pads supporting beams or girder trusses Floor Plan of each level (finished or unfinished) with dimensions: /Floor Joist direction, size and spacing /Window and door location and sizes /Header, beam or concrete lintel sizes o Brace wall panel locations /Water heater and fumace locations %Exhaust fan locations /Deck or concrete patio sizes and locations /Roof Plan: /Engineered truss direction and spacing /Ridge, eave and valley lines /Rafter and over frame direction, size and spacing /Beam and girder size and location tIWall Section Detail including: Roof /Slope/ roofing material/ underlaymentl ice dam protection /Trigs or rafter size, spacing & connection /Attic insulation/ air space baffle/ ventilation /Room usage labels /Smoke detector locations /Attic and crawl space access locations /Fire Wall construction /Sheathing size and type Ceiling /Joist size and spacing Wall 'Height/ top plate/ stud size and spacing/ sole plate xterior sheathing size and type loor "Joist size and spacing Foundation Wall ya.b,«+retw, mmU, uy,. Yr Earth to wood separation distance noting Size Radon 'Passive system with 6mll vapor bander Miscellaneous Construction Details —B-9aek" lo-Floos— �,racid-syacing— taStairway tread rise & run and nosing /Size of ceiling gypsum wall board /Siding/ exterior house wrap/ anchor bolts /Insulation, vapor barrier, gypsum wall board /Sheathing or concrete floor size/ insulation /Footing bottom to finished ground level depth yi Horizontal & vertical reinforcement if any /Reinforcement if any 43-AetWeersterrnettFO:ralkaaparzt /Footings/ post/ and beam size and locations /Handrail / Guard height & spacing 54,00.6 ,5S4L/- Fg3,er75 04. UM/1410-t 3uLi 3x3 2 l$ �1a6 3 2k3 3 M Deg 3 !3s Lia 5 3 3k6 313 59 5 si P7It 1/0 11 it 7-- 5, ‘907 e-7-ey4e s k.ce 03 r 5/et/ fix. CV( tt 3 LTs 6 Siiokan�e j Target Date sheet For City Use Only PLUS Project Project Address 11703 E Sprague Ave Suite B-3 • Spokane Valley WA 99206 509.720-5240 ♦ Fax: 509.688.0037 ♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review > Submit complete, accurate plans and documents. Extra time may be required for re -submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. > Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date, please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure, you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re - submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by the Permit Specialist at that time. CD -003 V-7/ 06-21-11 Page 1 of 1