16-092.03 Cameron Reilly: Pines & Mirabeau Pkwy IntersectionSpokane Valley D PARTMENT OF PUBLIC WORKS 14-092-.o CHANGE ORDER NO: 3 CONSTRUCTION CONTRACT NO: 16-092 PROJECT: Pines Road (SR 27) & Mirabeau Parkway Intersection Project CONTRACT DATE: 7/22/2016 PRIME CONTRACTOR. Cameron -Reilly. LLC CIP NO' 238 DESCRIPTION ,OF>>CHANGES This Change Order pertains to Bid Schedule A and pays for removal and replacement the Type B Parallel Curb Ramp on the north west corner of the Pines & Mirabeau intersection due to cracking from diffential settling. The CO pays for installing sawcut joints at other pedestrian ramps. It also pays for ew-mobilization and additional traffic control necessary for safe working area. See revised 10/20/16 Plan Sheet 4 . Item No. Description Unit Quantity Unit Price Total CO -3 1 CHANGE ORDER 3 MOBILIZATION LS 1 $ 750.00 $ 750.00 CO -3.2 REMOVE CEMENT CONCRETE SIDEWALK / SY 11 $ 20.00 $ 220.00 DRIVEWAY APPROACH CO -3.3 SAWCUT CEMENT CONCRETE SIDEWALK LFI 130 $ 2,00 $ 260.00 CO -3 4 CEMENT CONCRETE CURB RAMP TYPE EA 1 $ 2200.00 $ 2200.00 PARALLEL B CO -3.5 TEMPORARY TRAFFIC CONTROL DAY 2 $ 1105.00 $ 8,7% Sales Tax $ Total Amount of this Change Order (incl. Tax): $ 2210.00 490.68 6,130.68 PHYSICAL COMPLETION 1 Original Contract Working Days: 15 Revisions by Prior Change Orders: 1.5 Revision By This Change Order: 2 Total Revised Contract Working Days. 18.5 CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT (Incl tax) $ 204,158 17 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT (through CO # 2) $ 5,819.99 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 209,978.16 NET THIS CHANGE ORDER $ 6,130.68 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER$ 216,108.84 CONTRACTOR ACCEPTANCE: The contractor hereby accepts this ad RECOMMENDED BY: APPROVED BY: APPROVED BY DATE: /%9 — ."/b us ent under the terms of Section 1-04.4 of the original contract. Project Manager Public Works Director City Manager DATE: /(,) . &' • l � DATE: / 6 DATE* Z ATTACHMENTS: Plan Sheet 3, revised 10/20/16 Distribution • ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor, PW Project File, Project Inspector, Finance Department C': S\ Fc -r 9 Spokane jUalley Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 • cityhall@spokanevalley.org Change Order Memo Date: October 20, 2016 By: Craig Aldworth Re: Change Order 3 Pines Rd (SR27) & Mirabeau Parkway Project, CIP 0238 1. Describe the Change This Change Order pays for removal and replacement of a cracked pedestrian ramp at the northwest corner of Pines Rd and Mirabeau Parkway and for sawcutting in joints at the other ramps to prevent future uncontrolled cracking. 2. Evolution of the Change The pedestrian ramp at the northwest corner of Pines Rd and Mirabeau Parkway intersection has cracked along the approximate edge of the signal pole foundation below. The plans call for installing sidewalk pedestrian ramps over the signal pole foundations per WSDOT Standard Plan J-26.15-01 Case E. The resulting sidewalk is subject to differential settlement and cracking because one portion overlays the non -yielding signal pole foundation and the other portions are built on compacted soil and crushed surfacing. The WSDOT plan does not explicitly call out that a joint be constructed in the sidewalk above the edge of the signal pole foundations. The project plans did not explicitly show a joint at the edge of signal pole foundations. 3. Payment The rainy fall has limited the days that the Contractor's crews have been able to work and so they are scheduled into mid-November so the Change Order pays for an additional mobilization. Payment for the sidewalk removal and curb ramp removal will be made under contract unit bid prices. Payment for saw cutting cement concrete uses the existing unit bid price for saw cutting asphalt concrete pavement. Payment for temporary traffic control is based on the Project Temporary Traffic Control lump sum bid price divided by the 15 day working day contract and multiplied by the Change Order time extension of 2 days The total cost including sales tax is $6,130.68. 4. Time An additional 2 days of time is granted to allow for remobilization, removing and reinstalling the pedestrian ramp, and sawcutting at other pedestrian ramp locations. 5. Prior Approval The Change Order was approved by the acting Public Works Director before work began. 6. Attachments CO 3, 10/20/16 Revised Plan Sheet 3 Si'okane j�uey Public Works Department Capital Improvement Program 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 • Fax: 509.688-0261 ♦ cityhall@spokanevalley.org Change Order Memoraidum Date: October 20, 2016 To: Eric Guth From: Craig Aldworth .. Through: Steve Worley Re: Change Order 3 — Pines Rd (SR 27) & Mirabeau Parkway Intersection Project, CIP 0238 Budget Account No. 311.000.238.595.30.63.00 Cameron -Reilly Contract 16-092.03 This Change Order pays for removal and replacement of a cracked pedestrian ramp at the northwest corner of Pines Rd and Mirabeau Parkway and for saw cutting in joints at the other ramps to prevent future uncontrolled cracking. The total Change order cost is $6,130.68. An additional 2 days are granted for remobilization, removing and reinstalling the pedestrian ramp, and saw cutting at other pedestrian ramp locations. This project is 80% funded by Transportation Improvement Board with a 20% match is funded by Spokane Valley Street Preservation Fund 303. There are sufficient funds in the project budget to cover these costs. Original Contract amount = Previous Change Order Cost (incl. tax) = Change Order #3 Cost (incl. tax) = Project Cost including Change Order #3 = 15% of Original Contract amount = Max Public Works Director Contract authority = Change Order Cost to date = Remaining P.W. Director Contract Authority after CO #3 Cc: Finance Department, Clerk's Office $ 204,158.17 $ 5,819.99 $ 6,130.68 $ 216,108.84 $30,623.73 $30,623.73 $11,950.67 $18,673.06 0238 - Pines RD Mirabeau Parkway Intersection All Activity as of Oct 20 2016 REVENUES Original Budget Project Prior Life Adjusted Years 2015 2016 To Date Available Budget Actual Actual Actual Actual Encumbered Funds TIB 302 357,069.00 89, 269.00 357,069.00 89,269.00 0.00 0.00 28,048.62 28,048.62 0.00 329,020.38 0.00 0.00 7,636.00 7,636.00 0.00 81,633.00 Total Revenue 446,338.00 446,338.00 0.00 0.00 35,684.62 35,684.62 0.00 410,653.38 EXPENDITURES Original Budget Adjusted Prior 2015 2016 Life Available Budget Years Actual Actual To Date Encumbered Funds Preliminary Engineering Salaries & Wages 5,000.00 Overtime 0.00 Employee Benefits 1,750.00 Employee Benefits 0.00 Engineering & Architectural 35,337.00 Prof. Svcs - Survey 0.00 Prof. Svcs. - Geotech 0.00 Advertising 1,000.00 Printing & Binding 500.00 Miscellaneous Services 0.00 PE Contingency 0.00 Total Prelim. Engineering 43,587.00 Right of Way ROW Acquisition Total Right of Way 0.00 5,000.00 0.00 1,750.00 0.00 35,337.00 0.00 0.00 1,000.00 500.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10,534.63 0.00 3,850.96 0.00 35,883.98 9,557.45 2,512.72 822.64 848.60 165.00 0.00 10,534.63 0.00 3,850.96 0.00 35,883.98 9,557.45 2,512.72 822.64 848.60 165.00 0.00 0.00 0.00 0.00 0.00 673.02 3,542.55 487.28 0.00 0.00 0.00 0.00 - 5,534.63 0.00 -2,100.96 0.00 - 1,220.00 -13,100.00 -3,000.00 177.36 -348.60 -165.00 0.00 43,587.00 0.00 0.00 64,175.98 64,175.98 4,702.85 -25,291.83 0.00 0.00 0.00 594.00 594.00 0.00 -594.00 0.00 0.00 0.00 594.00 594.00 0.00 -594.00 Construction Salaries & Wages 3,000.00 3,000.00 0.00 0.00 8,796.40 8,796.40 0.00 -5,796.40 Overtime 0.00 0.00 0.00 0.00 744.15 744.15 0.00 -744.15 Employee Benefits 1,050.00 1,050.00 0.00 0.00 3,196.91 3,196.91 0.00 -2,146.91 Employee Benefits 0.00 0.00 0.00 0.00 27.07 27.07 0.00 -27.07 Prof. Svcs. Mat. Testing 2,000.00 2,000.00 0.00 0.00 2,328.90 2,328.90 775.70 -1,104.60 Prof. Svcs. - Consulting 37,537.00 37,537.00 0.00 0.00 2,063.80 2,063.80 0.00 35,473.20 Advertising 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Printing & Binding 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Construction 359,164.00 359,164.00 0.00 0.00 145,348.48 145,348.48 107,424.43 106,391.09 Traffic Control Devices 0.00 0.00 0.00 71,976.59 71,976.59 0.00 -71,976.59 Contingency 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Construction 402,751.00 402,751.00 0.00 0.00 234,482.30 234,482.30 108,200.13 60,068.57 Other Construction Construction - Drainage 0.00 0.00 0.00 6,848.10 6,848.10 0.00 -6,848.10 Professional Services 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Total Other Construction 0.00 0.00 0.00 0.00 6,848.10 6,848.10 0.00 -6,848.10 Total Expenditures 446,338.00 446,338.00 0.00 0.00 306,100.38 306,100.38 112,902.98 27,334.64 NOTES 1. ALL WORK AND MATERIALS SHALL BE IN CONFORMANCE WITH THE CITY OF SPOKANE VALLEY STREET STANDARDS, MARCH 2016 AND WSDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, 2016. 2. PRIOR TO SITE CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR LOCATING UNDERGROUND UTILITIES. CALL THE UNDERGROUND UTILLITY LOCATION SERVICE AT 811 BEFORE YOU OIG. 3. LOCATIONS OF EXISTING UTILITIES SHOWN IN THE PLANS ARE APPROXIMATE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES. ANY CONFLICTING UTILITIES SHALL BE RELOCATED PRIOR TO CONSTRUCTION OF ROAD AND DRAINAGE FACILITIES. 4. THE CONTRACTOR IS REQUIRED TO HAVE A COMPLETE SET OF THE ACCEPTED ROAD AND DRAINAGE PLANS ON THE JOB SITE WHENEVER CONSTRUCTION 15 IN PROGRESS. 5. IF THE CONTRACTOR DISCOVERS ANY DISCREPANCIES BETWEEN THE PLANS AND EXISTING CONDITIONS ENCOUNTERED, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE DESIGN ENGINEER. TAI SEA6. BOXWOOD SIGNAL ROLLER FOUNDATION CENTER OF FOUNDATION AT TA 100.55.11, 52.12. LT CONSTRUCTION NOTES 92 SY BARXMULCH—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r PEDESTRIAN CMS (SEE WSDOT STD PIAN 610.115 BLOCK OUT PEDESTRIAN CURB AT EXISTING POWER POLE WRAP PEDESTRIAN CURB BOIND SIGNAL BASE INSTALL RBRRAMP.T PEA 2 GAL. BOXWOOD STP 20116.115.21]1 LT TACTILE WARNING SURER MIN. Ir mM INN. DIRECTION OF T ADJUST EXISTING VAULT TO CONFORM TO SLOPE CP J SIGNAL EASEMENT — {I0-'--"- *ILW1 44 20 ar.lm�slsiXL+nOD • • NEW . CU TYPEINSTALL PARALL 1., CV 0 SAWCUT STA 100.28,63.00.E>'LT ILmilioosOk GWENT CONC. [URBAN°EIMER REPLACE PER COSY STANDARD PLAN 8.102 PC. FACE OF CURB STA 106.1103, 2121E LT PROTECT EXISTING UNCTION BOX TACTILE M WAENG SURFACE IN THE DIRECTION OF TRAVEL NORTHWEST CORNER SAWCUT STA 101•05.51, 26.261 LT LHA 4E 3 .9V 00DIHSTALLATION aaw SAwcfN sows DTA DDANnTFDR°MNER, R pLAcEtti \ LESEND: POSCI PO E SANTAAY Y.VOIOF TRAFFIC DOA WATER SINEWY USIN POST 100/1016 BOM 21RGTMN WOE TILUTO 901 DWI% WOOL f MAME SOUL PFO OAS MOR WATER PN/IT UNE 11199019 PANT WIE OS PAM UWE Nem PARR LINE PROTECT EXISTING JUNCTION BOX INSTALL CURB RAMP. TACTILE WARNENG MIN. N' IN TME DIRECTION OF TMVEL (1211 GAL. BLUE RVG JUNIPER AS TAKEG BY ME ENGINEER CEMENT CONC. CURB AND OWNER REPLACE PER COSY STANDARD PIAN WIN EL �ROnroFwaT a gr -j40,1 •000; •;11:,EMIIOBFOCTIND RADIUS 0PEe\'� B ENNO PEDESTRIAN B ONAL BASE CE SOUTHWEST CORNER (NORTH RAMP) RIONX0WWAY IN3' • Morrison BI67a: A °9B}01A,60 Maierle FNan0• 509.3155303 Far 505.2235303 engineers • surveyors •planners ss,emNl• a...P.ne.O..nP„WwLe•K. >a. SAWCUT STA 10606.67, 22221 REF CEMENT CLIC. CURB AND GUTTER REPLACE PER W6DOT STANDARD PLAN 610.1103 STA za•NT CENTER OF RAMP LANDING STA 2e•LT CENTER OF RAMP LANDING STA IC1•13 0333P.10' LT [ENTER°] A IAxo1xG ., TACTILENMNINGBMFACE em Call bsbre yOu if 1 MIx.1rl xE DIREtnox of TRAVEL Call before lywxdig. ® � PROTECT EXISTING \ JUNCTION BOX PLABfBACN OFPicUR WSX WITH BA<KO�NueABEIPIS7 IE�NU BMARML�C RBPAMP. ttPEA O*16\ PoGHTOP-WAT ViTO FOG O EXITING MONS NORTHEAST CORNER SAINCUT i•5 STA 106.11.22, 50A3'117 MIRABEAU PARKWAY STA 1051300.1102• Ll CENTER OF RAMP LANDING SIDEWALK IMPROVEMENTS SIGNAL EASEMENT CEMENT CONC. °URBANE GUTTER REPLACE PER COSV STANDARD PIAN 9102 WRAP PEDESTRIANGCURB BADE CURB RAMP. TY TACTILE WARNING SURFACE MIN 11'IN THE DIRECTION OF TRAVEL SOUTHWEST CORNER (SOUTH RAMP) SAMAR BTA IMO NZ LT EXISIINORA01U5 TO POC SAWCUT STA 1054229 OMIT "RIONT-0FWRY SOUTHEAST CORNER DEMENT CONCOURS AND GUTTER REPLACE PER WSDOT STANDARD PLAN 5.10.1203 SAWCuT STA 105•69.05, WOW RT 061 BARK MULCH NEW TYPE 2 ON BOX SET AND ADJUST TO MATCH XIDA GRADE AIM SLOPE OF RAMP INSTALL P PARALLEL MAP. TYPE IlaiT MIN&'!UTNE oM!c}Ox OF TRAVEL ELTACLILE WMNI0EURFACE BORDER WRAPOMB NNO SIGNAL 0028 7. HORIZ, SCALE o 0 20 40 _ 1 J 1N FEET CALLSEFOREVOUDIG 14004245558 10 OA P:IO,Y Cas CBI al 291ane 2911M )Cane InmtIR,'"uVata..T0,00 In,)pE1. S4WAJIL 'ADLY_'A� 910 PINES ROAD (SR 27) & MIRABEAU PARKWAY INTERSECTION PROJECT SIDEWALK IMPROVEMENTS OP /02m OR I• • I0 106/12/2016 111[ ;DRAW 1,1110/0 OMNB 111 °16/6232 O 1 0R OR 3/8":PREMOLDED.: JOINT FILLER SEE TYPICAL SECTION FOR REINFORCEMENT'; SIGNAL: STANDARD FOUNDATION SEE STANDARD. PLAN J-26.10 LL (SHOWN REDUCED).: PLAN PLAN TOP OF FOUNDATION LEVEL WITH GRADE SIDEWALK SIGNAL STANDARD FOUNDATION -SEE STANDARD PLAN J-26.10 NOT STEEPER `. THAN 1.5H : 1V NOTE * = 2' - 0" FOR 3' - 0" DIAM. FOUNDATION 2' 6" FOR 4' 0 DIAM. FOUNDATION 2' - 6"I FOR 3' - 0 SQUARE FOUNDATION SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% FOUNDATION IN OR NEAR SIDEWALK CASE A SIGNAL STANDARD FOUNDATION -.SEE STANDARD PLAN J-26.10 0" FINSHED GRADE SLOPE = RAT TO 2H : 11/ (4H: IV SLOPE SHOWN) SECTION U 6. NOT STEEPER THAN 2H.:. 1V FINISHED GRADE SLOPE - 311 : 1V OR FLATTER BUT NOT FLATTER THAN 10H: 1V SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5%. SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26:10 ELEVATION XISTING GRADE OR FILL SLOPE = 1011 : 1V TO 5 3H : 1V CASE C PLAN 0 LL PLAN SIGNAL STANDARD. FOUNDATION - SEE STANDARD PLAN J-26.10 1'-D" SIGNAL STANDARD FOUNDATION -:SEE STANDARD PLAN J-26.10' SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% ELEVATION EXISTING GRADE OR FILL SLOPE = FLAT TO 10H i V CASE B NOT STEEPER THAN 1.511: IV SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% ELEVATION.. EXISTING GRADE OR FILL SLOPE _ > 3H : IV TD 2H : iv CASE D FINISHED GRADE SLOPE = STEEPER THAN :3H : 1V BUT NOT STEEPER THAN 2H : IV SIGNAL STANDARD FOUNDATION SEE STANDARD PLAN J-26.10 NOT STEEPER THAN 2H: 1V FINISHED GRADE SLOPE - FLAT: TO 10H : 1V (10H : IV SLOPE SHOWN) SIGNAL STANDARD FOUNDATION SEE STANDARD PLAN J-26.10 JOSEA WAsyo D 7-4 egg SIGNAL STANDARD FOUNDATION PLACEMENTS STANDARD PLAN J-26.15-01 SHEET 1 OF 3 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich III 05/17/12 STATE DESIGN ENGINEER:' DATE Washington Slat. Department of TronsRorta5on 3!6" PREMOLDED JOINT FILLER SEE TYPICAL SECTION FOR REINFORC EMENT DRAWN BY: LISA CYFORD SIGNAL STANDARD FOUNDATION SEE STANDARD PLAN J-26.10 )c} EXISTING GRADE OR CUT SLOPE SLOPE = FLAT TO 2H : 1V (MAX. SLOPE SHOWN) TOP OF FOUNDATION LEVEL WITH GRADE SIDEWALK SLOPE TO MEET FINISHED GRADE - SEE SECTIONS FOR SLOPE 3'-0" NOTE * = 2' - 0" FOR 3' - 0" DIAM. FOUNDATION 2' - 6" FOR 4' - 0" DIAM. FOUNDATION 2' - 6" FOR 3' - 0° SQUARE FOUNDATION Q SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% (SHOWN REDUCED) PLAN PLAN SECTION OB FOUNDATION IN OR NEAR SIDEWALK CASE E EXISTING GRADE OR CUT SLOPE EXISTING SLOPE STEEPER THAN 10H : 1V TO S 3H : 1V (MAX. SLOPE SHOWN) TOP OF FOUNDATION SIGNAL STANDARD LEVEL WITH GRADE FOUNDATION - SEE STANDARD PLAN J.26.10 NOT STEEPER THAN 2H 1V 1-9" 0 SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 O SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% ELEVATION EXISTING GRADE OR CUT SLOPE 10H : 1V TO < 3H : 1V CASE G BACK SLOPE SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 0 SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 PLAN NOT STEEPER THAN 2H: 1V TOP OF FOUNDATION LEVEL WITH GRADE BACK SLOPE 3'-0" 3'-0" EXISTING GRADE OR CUT SLOPE FLAT TO10H:1V (MAX. SLOPE SHOWN) Q SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% ELEVATION EXISTING GRADE OR CUT SLOPE FLAT TO 10H : 1V CASE F SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 NOT STEEPER THAN 1.51 1V EXISTING GRADE OR CUT SLOPE SLOPE STEEPER THAN 3H : 1V (2H : 1V MAX.) (MAX. SLOPE SHOWN) TOP OF FOUNDATION LEVEL WITH GRADE 0 PLAN ELEVATION 0 SLOPE TO DRAIN AWAY FROM THE FOUNDATION SLOPE NOT STEEPER THAN 5% EXISTING GRADE OR CUT SLOPE STEEPER THAN 3H : 1V (2H : 1V MAX.) CASE H 1'-0" 0 SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 SLOPE TO MEET FINISHED GRADE - SEE SECTIONS FOR SLOPE SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 SIGNAL STANDARD FOUNDATION PLACEMENTS STANDARD PLAN J-26.15-01 SHEET 2 OF 3 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich Ill 05/17/12 STATE DESIGN ENGINEER DATE T Washington State Department of Transportation CEMENT CONCRETE SIDEWALK SEE STANDARD PLAN F-30.10 OR ASPHALT CONCRETE PAVEMENT 318" PREMOLDED JOINT FILLER' SEE TYPICAL SECTION FOR REINFORCEMENT SIGNAL STANDARD FOUNDATION -SEE;': STANDARD PLAN J-26,10 LL DUAL PEDESTRIAN PUSH BUTTON NOTE * =2 0 FOR 3'-0" DIAM. FOUNDATION 2' 6 FOR 4' -. 0" DIAM. FOUNDATION 2' - 6" FOR 3' - 0" SQUARE FOUNDATION.. SEE TYPICAL SECTION FOR REINFORCEMENT SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 4'-6"MIN. ** w z 4' - 6" MIN. FROM THE FACE OF THE POO EK OF THE CURB OR EDLEGETOTHF SHOULBACDER Z VARIES 6" MIN. (TYP.) SIGNAL STANDARD FOUNDATION SEE STANDARD PLAN J-26.10 3/8" PREMOLDED JOINT FILLER 318" PREMOLDED JOINT FILLER) V CEMENT CONCRETE SIDEWALK SEE STANDARD PLAN F-30.10 OR ASPHALT CONCRETE PAVEMENT NOTE * * = APPLIES TO THE SIDE OF THE FOUNDATION WHEN PEDESTRIAN PUSHBUTTON IS TO BE INSTALLED. FOUNDATION PARTIALLY WITHIN SIGNAL STANDARD SIDEWALK SECTION FOUNDATION -SEE STANDARD PLAN J-26.10':: CEMENT CONCRETE SIDEWALK - SEE STANDARD PLAN F-30.10 CEMENT CONCRETE S DEWALK SEE STANDARD PLAN F-30.10 OR ASPHALT CONCRETE PAVEMENT SINGLE PEDESTRIAN PUSH BUTTON FOUNDATION OUTSIDE THE SIDEWALK SECTION SIGNAL FOUNDATION IDENTIFICATION TAG 0 GAGE STAINLESS STEEL TAG - RECESS FLUSH WITH TOP OF FINISHED FOUNDATION SIGNAL STANDARD HAND HOLE FOUNDATION OBLIQUE VIEW REINFORCING AND ANCHOR BOLTS NOT SHOWN FOR CLARITY (GROUT PAD OPTION SHOWN) 31/4 APPLY GROUT EVEN WITH THE BOTTOM OF THE ANCHOR PLATE AFTER PLUMBING THE STANDARD PROVIDE 3/8" DIAMETER DRAIN TUBE IN THE GROUT PAD WWF 4 4-W 2.9 2.9 AT CENTER OF EXTENDED 5 DE WALK AT: = SIGNAL STANDARD FOUNDATION 12 - 28 (NF) " 2" LONG STAINLESS STEEL SCREW DRILL AND TAP FROM BOTTOM, LEAVE SCREW FLUSH WITH TOP. APPLY LOCKTITE TO SCREW THREADS TO BIND SCREWS AND I.D. TAG TOGETHER 3/8" MIN. (TYP.) 0;05'. MIN. (TYP) a; FOUNDATION DEPTH 1'1' SHAPE RD. DIMENSION 36" ALT. # 1, SIGNAL FOUNDATION IDENTIFICATION TAG DETAIL TEXT SHALL BE ENGRAVED 0.014" DEEP SEE CONTRACT PLANS FOR. - FOR ORFOR. EXTENDED SIDEWALK LAYOUT ". 1/2" (TYP. SEE TYPICAL SECTION FOR REINFORCEMENT 3/8" PREMOLDED JOINT FILLER SIGNAL STANDARD FOUNDATION - SEE STANDARD PLAN J-26.10 :.� 4 -6 MIN. TO FACE OF STANDARD CEMENT CONCRETE SIDEWALK - SEE STANDARD PLAN F-30.10 TRAFFIC ISLAND - SEE CONTRACT PLAN SHEETS OR ILS SEE TYPICAL SECTION FOR REINFORCEMENT 3/8" PREMOLDED JOINT FILLER 4 - 6 MIN. TO FACE OF STANDARD FOUNDATION WITHIN SIDEWALK OR TRAFFIC ISLAND. SECTION NOTE REFER TO CONTRACT DOCUMENTS FOR PROJECT SPECIFIC INTERSECTION LAYOUTS &TRAFFIC ISLAND MATERIAL TYPE FOUNDATION PARTIALLY W THIN SIDEWALK SECTION GROUNDING CONDUCTOR NON -INSULATED #4 AWG STRANDED COPPER -PROVIDE 3' MIN. SLACK (ROUTE CONDUCTOR TO GROUNDING STUD) FORM TO FINISH GRADE WHEN INSTALLING SIDEWALK OR TRAFFIC ISLAND 318" PREMOLDED JOINT: FILLER SIDEWALK OR j" TRAFFIC ISLAND CLAMP CONDUCTOR TO STEEL REINFORCING WITH LISTED CONNECTOR SUITABLE FOR USE EMBEDDED IN CONCRETE SQUARE OR ROUND DIAMETER OR WIDTH ALTERNATE 10R2 -SEE STANDARD PLAN J-26.10 ROUGHENED CONCRETE SURFACE NOTE FOUNDATION REINFORCING ONLY PARTIALLY SHOWN FOR CLARITY. - SEE STANDARD PLAN J-26.10 FOR DETAILS NOT SHOWN.: TYPICAL SECTION SIGNAL STANDARD FOUNDATION PLACEMENTS STANDARD PLAN J-26.15-01 SHEET 3 OF 3 SHEETS APPROVED FOR PUBLICATION Pasco Bakotich ii 05/17112" S1ATE DESIGN ENGINEER DATE Washington State Department of Transportation