Loading...
16-109.01 AM Landshaper: Bates/Rego Stormwater Improvements Il,-icy/. e ( Spoke %1leJ CHANGE ORDER NO: 1 DEPARTMENT OF PUBLIC WORKS CONSTRUCTION CONTRACT NO: 16-109 PROJECT:Bates/Rego Stormwater Improvements 2016 Small Works-Package 1 CONTRACT DATE: 9/13/2016 PRIME CONTRACTOR:AM Landshaper, Inc. CIP NO: N/A DESCRIPTION OF CHANGES Added miscellanious roadway patching adjacent to Type C curbing-8.6 SY Field adjustment of driveway at 1010 N Bates Rd to improve stormwater conveyance-17.8 SY Replacement of grassed spill way with aspalt spillway per resident request at 908 N. Bates Rd.-8.4 SY Additional Type C curbing to improve project conveyance-126.3 LF Item No. Description Unit Quantity Unit Price Total 102 REMOVE ASPHALT CONCRETE PAVEMENT " SY 34.8 $ 33.38 $ 1,161.62 113 CRUSHED SURFACING TOP COURSE.6 IN. SY 34.8 $ 70.00 $2,436.00 115 HMA CL.1/2 IN.PG 64-28,0.17 DEPTH.MISC HMA SY 34.8 $ 53.50 $ 1,861.80 122 ASPHALT CONCRETE CURB,TYPE C LF 123.7 $ 15.10 $ 1,868.55 Total Amount of this Change Order(incl.Tax): $7,327.97 PHYSICAL COMPLETION Original Contract Working Days: .....15-- -. Revision By This Change Order:-------0 _ Revisions by Prior Change Orders: 0 Total Revised Contract Working Days:_ _._.15 ._. . CONTRACT AMOUNT THESE CHANGES RESULT IN THE FOLLOWING ADJUSTMENTS OF TOTAL CONTRACT AMOUNT: ORIGINAL TOTAL CONTRACT AMOUNT $ 75,031.97 TOTAL PRIOR CONTRACT CHANGE ORDER AMOUNT(through CO# ) $ 0.00 TOTAL CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER $ 75,031.97 NET THIS CHANGE ORDER $ 7,327.97 TOTAL CONTRACT AMOUNT INCLUDING THIS CHANGE ORDER $ 82,359.94 CONTRACTOR ACCEPTANCE: Ast— 6• c-c DATE: /t'-/F— Z '/4, The contractor hereby accepts this adjustment under the terms of Section 1:04.4 of the original contract. RECOMMENDED BY: DATE: 401/2/16 Project Manager APPROVED BY: � n ! DATE: /Op'7// Public Works Director APPROVED BY: N/4 jDATE: City Manager ATTACHMENTS: Distribution: ORIGINAL TO: City of Spokane Valley Clerk's Office COPIES TO: Contractor,PW Project File,Project Inspector,Finance Department CUSV f'cim Lf:)/2O 4 t C I1%° Public Works Department poke Stormwater Utility Valley 11707 E Sprague Ave Suite 106 • Spokane Valley WA 99206 509.921.1000• Fax: 509.688-0261 •cityhall®spokanevalley.org Change Order Memorandum Date: October 19`",2016 To: Eric Guth, P.E. Through: Art Jenkins, P.E.,C.S.M. From: Chad Phillips, P.E. Re: Change Order#1 for Bates/Rego 2016 Stormwater Small Works Budget Account No. 402.000.000.595.40.63.00 AM Landshaper, Inc. Bid No. 16-109 The scope of this project is to reduce erosion along Bates and Wilbur Rd. and minimize ponding/flooding in the vicinity of the Bates Rd./Rego Ct. intersection. Change order No. 1 for$ 7,327.97 to AM Landshaper captures increased quantities to listed work items on the Bates/Rego 2016 Stormwater Small Works project. This change order adds 34.8 SY of Remove Asphalt Concrete Pavement, Crushed Surfacing Top Course, 6 In. Depth, and HMA CL. % In. PG 64-28, 0.17'Depth, Misc HMA. Also added is 123.7 LF of Asphalt Concrete Curb, Type C. The project was bid off of the Small Works Roster, with AM Landshaper being the lowest bidder. Total contract amount is $75,031.97. There are sufficient funds in the project budget to cover change order No. 1 costs. Original Contract Amount: $75,031.97 Previous Change Order Cost: $00.00 Change Order#1 Cost: $7,327.97 Project Cost including Change Order#1: $82,359.94 15% of Original Contract amount: $11,254.80 Max Public Works Director Contract authority: $11,254.80 ($75,000 or 15% of original contract amount, whichever is less) Change Order Cost to date: $7,327.97 Remaining P.W. Director Contract Authority after CO #1: $3,926.83 cc: Finance Department Clerk's office