2008, 10-2 Permit App: 08003884 Addtion Garage Project Number: 08003884 Inv: I Application Date: 1022008 Page I oft
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Project Information: ,-:„, rte,
Permit Use: GARAGE ADDITION Contact: JACOBSON,JEFF A
Address: 6411 E 8TH AVE
C-S-Z. SPOKANE,WA 99207
Setbacks: Front Left: Right: Rear: Phone: (509)553-5807
Group Name:
Project Name:
Site Information: r, ... . 4; zatv, _.
Plat Key: Name: Range District: Soul
Parcel Number: 35242.2620 Block: 2 Lot: 9
SiteAddress: 6411 E 8TH AVE Owner:Name: JACOBSON,JEFF A
Address: 6411 E 8TH AVE
Location::CSV SPOKANE,WA 99207
Zoning: MF-1 MF MDR District
Water District: 020 EAST SPOKANE Hold: _
Area: 6,750 Sq Ft Width: 0 Depth: 0 Right Of Way(ft): 0
Nbr of Bldgs: 0 Nbr of Dwellings: 0
Review Information: owe,-, . .H.... ..., ,ss,v. sm .,.:_zaa, .A`v.= :.u+
Review
Building Plan Review Released By: _
Originally Released: 9/30/2008 By: tmeibourn
Landuse/Zaning/HE Conditions rReleased By: _..
See Conditions
Originally Released: 10/1/2008 By: mbasinger
Permits: ..,:. ,.�. ,,.-... .,
Operator: JD Printed By: JD Print Date: 10/2/2008
Project Number: 08003884 Inv: I Application Date: 10/2/2008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Building Permit - — - _--
Contractor OWNER Firm: OWNER
Phone: (000)000-0000
This Application: Total Project:
Description Cru Type Notes So Ft Valuation So Ft Valuation
GARAGE U-I VB 408 $7,752.00 408 $7,752.00
Totals: 408 $7,752.00 408 $7,752.00
Item Description Units Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE I SELECT $153.25
WSBC SURCHARGE 1 SELECT $4.50
SF PLNS RVW<7999 SQ FT 1 SELECT $61.30
Permit Total Fees: $219.05
Notes:
No accessory structure shall be located in the front or flanking street yard,and shall be set back not less
than five feet from any side or rear yard.
This permit is granted based on the structure not being used for storage of on-street vehicles. Should
the use of the structure be used for that purpose,the driveway will need to be paved and approved by
the City of Spokane Valley.
The combined building footprint of all accessory permanent structures in residential zoning districts
shall not exceed 10%of the lot area.
Payment Summary:
Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing
Building Permit $219.05 $219.05 $0.00 $219.05
$219.05 $219.05 $0.00 $219.05
Disclaimer:
Submittal of this application certifies the owner(or persons)authorized by the owner)has both examined and finds the information
contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance ofa permit shall not be construed to be a permit for,or an approval of,any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: JD Printed By: JD Print Date: 10/2/2008
Pemrit Center - i ( tt
vry n 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: i r
c Spokane Valley,WA 99206 PERMIT FEE:
`�llrnr• (509)688-0036 FAX: (509)688-0037
•cllliCG�]' www.spokanevalley.orr
Community Development
Residential Construction n New Construction "Accessory Bldg
Permit Application Addition/Remodel Deck
/ n Other:
`.
SITE ADDRESS: U�'I ' I &\-\
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner: � Contractor:
Name: SC -5-11C. OAO S o r) Name:
Address: (( l '-1q G �-r\-- Address: ` C' !, M�
City: S e JIL a.,x Vc.,\C( i State:c c,. Zip:q�L�City: > !~'State: Zip:
Phone: Z 1 1 _c u \ 3 Fax: 3s 1. 1[-7 Phone: Fax:
- / Contractor Lic No: Exp Date:
Contact Person City Business Lic.No:
Name: 'L \-k
, `c c\L i\ -s''A
Z I p
Phone:
- ) HS $>
o?
Describe the scope of work in detail: Cost of Project: $ I ZC)
Proposed Use: l 12 }\ ( (-4
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK: DIMENSIONS: / #OF STORIES: TOTAL HABITABLE SPACE:
7 � z )C /u- I re)3
MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE
FTG: q N.) V n ( I� AREA: ^ I I �,\
SQ FINISHED FTG: BASEMENT GARAGE /SQ FTG: DECK/COJV..PATIO SQ. FTG: 30%SLOPESSL� ON
`N'
#OF BEDROOMS: I CO STRUCTI`T PE: HEAT SOURCE: ( ^ OR SEPTIC?
The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal,state or
local laws,codes or ordinances.6) Plans o additional information may be required to be submitted,and subsequently approved before
this application can be processed. 1
SIGNATURE: DATE: - _
Method of Payment
0 Cash ❑ Check 0 Mastercard ❑ VISA
Bankcard#: Expires: VIN#:
Authorized Signature: c, U +9ij(,
REVISED 2115/07
C
New project
ciT ar
Project Precious pre-app meeting p
pokane Transmittal Plan retisians
City oValley
CommunityDevelopment Transmittal Dat :
Tuesday, er30,2
008
Department
11703 E.Sprague Ave,Suite B3
Spokane Valley,WA 99206
Phone:509.688.0036
Site Address: 6411 E 8TH AVE Project Number: 08003884
Parcel Number: 35242.2620
Zoning: MF-1 Water District: EAST SPOKANE
Fire District FD 01
Applicant: JACOBSON, JEFF A Owner: JACOBSON. JEFF A
6411E 8TH AVE 6411E 8TH AVE
SPOKANE, WA 99207 SPOKANE, WA 99207
(509) 553-5807
e-mail: e-mail:
Contact: JACOBSON, JEFF A Occupant:
6411 E 8TH AVE
SPOKANE, WA 99207 e-mail:
(509) 553-5807
e-mail:
Contractor OWNER Arch/Engineer:
( ) - 0
e-mail:
Project GARAGE ADDITION
Description:
Building Landuse Engineer Utilities Health Fire Dist Assessor
APPLICATION \ 1
SITE PLAN
PLANS V
Please send all plan review and project comments via e-mail to the
highlighted individuals.
• For City Use Only
Sjôkane
PLUS Project Number
Project Address
\7a1'ey
11703E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is ,
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
> Submit complete,accurate plans and documents.
Extra time may be required for re-submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
➢ Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choice for the entire review process.
➢ Call staff regarding the status of your project only after the target date shown at the top of the page.
Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us
by your target date. Staff may contact you before the target date if the initial review is complete. By following this
procedure,you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents,as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred
submittal.This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone,fax, email,or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re-
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre-construction meetings(if required) will be provided by
the Permit Specialist at that time.
WHITE-APPLICANT PINK-BUILDING FILE REv 9/07
I
_SM
5i,aa_ y,.c. seA ,\C
2 NUt "se' s �S )
^_^.�
1 N 2N-1 APPROVE BY A ....i
_ s- 2H I .-1
1 U
I L\ ' Jam \
ex;-5 C"V S
\z
A X101
-5 .Cx i 'S} 10
a_y)
h
je 1
f SEP 2 5 200
szie .1\' I
.�--¢ 7 �� (`\ \ C ?��