2007, 12-04 Permit: 07004748 Plumbing Fixtures sof e BUILDING DIVISION
4•00,Valle3' 11707 E. Sprague Avenue, Suite 106
C41 l+ Spokane Valley, WA 99206
Site Information Project Information
Site Address: 6414 E 8111 AVE Project Number: 07004748 Inv: I Issue Date: 12/04/2007
Permit Use: 1 TLT/I SHWR/ I SNK
Parcel Number: 35243.0447
Subdivision: Applicant: RICK'S PLUMBING
Block: Lot: PO BOX 3874
Zoning: R-3 SF Res District SPOKANE WA 99220 Phone: (509)926-2437
Contact: RICK'S PLUMBING
Owner: ROBERSON,JOAN L
PO BOX 3874
Address: 6414 E 8T11 AVE SPOKANE WA 99220 Phone: (509)926-2437
SPOKANE,WA 99212-0587
Setbacks-Front: Left: Right: Rear:
Building Inspector: SOUTH
Water Dist: EAST SPOKANE
Group Name:
Project Name:
Permits
P/umbine Permit Contractor: RICK'S PLUMBING&HEATING License k: RICKSPHI63DT
'FORDS/BIDETS I $6.00 SINKS I $6.00
SHOWERS 1 $6.00 PROCESSING FEE $35.00
Total Permit Fee: $53.00
FOR PLUMBING INSPECTIONS CALL(509)688-0054.
Payment Summary
Total Fees AmountPaid AmountOwinp Tran Date Receipt# Payment Amt
$53.00 $53.00 $0.00 12/04/2007 12313 553.00
Processed By: DAVIS,JENNA PERMIT
Printed By: PATRICIA PRINCE Page 1 of 1
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner.The permit applicant,by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the paint where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owner's expense.At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING—when forms and reinforcement are in place and prior to placement of concrete-all structures,including manufactured homes.
NOTE This inspection includes review of the structure's setback from property lines.Minimum setbacks are established by City of Spokane
Valley Ordinance.Curb lines and fence lines are not necessarily indicative of properly lines.The responsibility to comply with applicable
setback provisions lies solely with the permittee-neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines.Please verify their location prior to locating your structure.Failure to
properly locate the structure may require its relocation at the owner s/permittees expense.
FOUNDATION—when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING—after rough-in,before covering,and final.
MECHANICAL—rough-in of piping,before covering, metal chimneys before concealment,and final.
FRAMING—after all framing,bracing and blocking is in place, rough electrical,plumbing and mechanical systems are complete,and prior to
concealing.
FINAL—when complete and prior to occupancy and/or use.All permits require final inspection.
NOTE In addition to inspection of the structure,this inspection includes review of site improvements(typically depicted on the approved site
plan)required by ordinance or as a condition of approval of this permit.Items such as the installation of fire hydrants,fire department access,
on-site drainage('2D8'swales),road improvements,parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES—Final inspection required when complete,stairs,handrails,skirting,etc.installed,and prior to occupancy,
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS—prior to cover.
RIGHT-OF-WAY/APPROACH—pnor to placement of concrete/asphalt or,if gravel approach,after completion.
In addition to the above,any plumbing or mechanical systems or material which would be concealed by framing,drywall,concrete,etc.must
be inspected prior to cover.Check with the Building department for"special Inspections"in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice.Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing(includes interior reversals for sewer)and Road cuts for utilities or driveways,City of Spokane Valley
mechanical,City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation
324-6000
Penmts and inspections for electnal wi nng.State Depadnenl of Labor Pem6 and mspecirons for Sewer Connection,Spokane County iitiblies Divslm
And lnduslnes 324.7640 477-3604
Penros and inspections for on-ale septic systems. Spokane Regmral Fire sprinkler and alarm syslend and private access road inspections.Spokane valley
Health Distnct 324-1560 Fre Deradmenl 8904122
State aw ROW 19.122 requires that pnor to any excavation 0e'CALL BEFORE You DIG center must be notl0edcat before you dig at least 2 working days in advance,456-000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void if a)work Is not started within 180 days of obtaining a permit,or b)work is
abandoned for 180 days or more after beginning work.or c)after two years from the date of permit issuance,regardless of whether the work is
finished. If a permit is expired for time,a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100%refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80%of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80%of a plan review fee paid may be authorized
when an application is withdraI
wwnnor c/aannjcelled pri to the plan revie eing completed. / 7
Owner/Agent z./,C. /j7 - Date (2/1/
Staff Approval Date