Loading...
2009, 12-22 Permit: 09004067 Demolition Warehouse, Residence1 s�� PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information 1 Site Address: 13914 E 8TH AVE Parcel Number: 45233.3905 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: THOMAS, GEORGE Address: 1237 145TH AVE SAN LEANDRO, CA 94578 Building Inspector: EAST Water Dist: VERA Project Number: 09004067 Inv: 1 Issue Date: 12/22/2009 Permit Use: DEMO WAREHOUSE AND HOUSE Applicant: ROBS Demolition 8420 E WOODLAND PARK DR SPOKANE WA 99217 Phone: (509) 534-2970 Contact: ROBS Demolition 8420 E WOODLAND PARK DR SPOKANE WA 99217 Phone: (509) 534-2970 Setbacks - Front: Left: Right: Rear: Group Name: Project Name: 1 Permits 1 Demolition Permit Contractor: ROB'S DEMOLITION License #: ROBSDDI97ORR DEMOLITION - RESIDENTIAL 1 546.00 DEMOLITION - COMMERICAL 1 $131.00 Total Permit Fee: $177.00 Payment Summary Total Fees AmountPaid AmountOwing $177.00 $177.00 $0.00 Tran Date Receipt # Payment Amt 12/22/2009 21234 $177.00 Notes / Conditions of Approval PERMIT #07003099 -DEMOLITION PERMIT MUST BE ISSUED WITHIN 30 DAYS OF PERMIT ISSUANCE. DEMOLITION MUST BE COMPLETED WITHIN 60 DAYS. Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and pdor to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Vatley nor its authorized representatives assume any responsibility for the vedficatlon or location of your property lines. Please verify their location prior to locating your structure. Failure tD properly locate the structure may require its relocation at the owner's/perittee's expense. FOUNDATION - when fors and reinforcement are in place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL- rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking Is In place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final Inspection. NOTE: In addition to inspection of the structure, this inspection Includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage 6208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skINng, eta installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by Framing, drywall, concrete, etc. must be inspected prior to cover. Check with the Building department for "special Inspections" in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes Interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Pemlts and Inspections Iva stomal Mring. State Department Of Labor Remits and inspections for sewer Connection. Spokane County Utilities Division And 1ndushes 324.2640 477-3504 Permits and inspections for on-site septic systems, Spokane Regional Fire spdnktr and slam system and private access road inspeclions. Spokane valley Health District 324-1560 Fire Depanrrent 8924122 Stale law RCW 19.122 rewires teat odor to any excavation Ihe'GALL BEFORE YOU DIG' center must be notified. Cal before you dig anent 2 working days In advance, 4564000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared vold if a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made in writing by the original permittee to the Building Official no later than 18D days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner/Agent 2P -A -t --T— Date Z` 2-t)o7 Staff Approval Date