2007, 08-14 Permit: 07003099 Pole Bldg1
S46k''
j�alley
BUILDING DIVISION
Site Information
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Project Information
Site Address: 13914 E 8TH AVE
Parcel Number: 45233.3905
Subdivision:
Block: Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: THOMAS, GEORGE
Address: 1237 145TH AVE
SAN LEANDRO, CA 94578
Building Inspector: JAY GRISSOM
Water Dist: VERA
Project Number: 07003099 Inv: 1 Issue Date: 08/14/2007
Permit Use: 40 X 50 POLE BLDG
Applicant:
Contact:
STEEL STRUCTURES OF AMERICA
PO BOX 895
POST FALLS ID 83877 Phone: (208) 777-8597
STEEL STRUCTURES OF AMERICA
PO 130X 895
POST FALLS ID 83877 Phone: (208) 777-8597
Setbacks - Front: Left: Right:
1 Permits
Group Name:
Project Name:
Rear:
Building Permit Contractor: STEEL STRUCTURES AMERICA INC
POLE BDLG U-1 VB 2,000
Building Height 14
Total Value: $38,000.00
FOR BUILDING INSPECTIONS CALL (509) 688-0054.
License #: STEELSA044BD
RESIDENTIAL PERMIT FEE
ACCESSORY PLANS REVIEW
WSBC SURCHARGE
$522.55
$130.64
$4.50
Total Permit Fee: $657.69
Payment Summary
Total Fees AmountPaid AmountOwing
$657.69 $657.69 $0.00
Tran Date
08/14/2007
Receipt # Payment Amt
10823 $657.69
Notes / Conditions of Approval
DEMOLITION PERMIT FOR EXISTING BUILDING TO BE ISSUED WITHIN 30 DAYS OF ISSUANCE OF TFIIS
PERMIT. DEMOLITION MUST BE COMPLETE WITHIN 60 DAYS.
PERMIT #07003099 -DEMOLITION PERMIT MUST BE ISSUED WITHIN 30 DAYS OF PERMIT ISSUANCE.
DEMOLITION MUST BE COMPLETED WITHIN 60 DAYS.
Processed By: DAVIS, JENNA
Printed By: TURBAK, MIKE Page 1 of I
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicant's/permittee's or property owners expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This Inspection includes review of the structures setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner'slpermittee's expense.
FOUNDATION -when forms and reinforcement are in place and prior to placement of concrete.
PLUMBING - atter rough -in, before covering. and final.
MECHANICAL- rough -in of piping, before covering, metal chimneys before concealment. and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to Inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access.
onsite drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permwsite plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy. -
MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails. skirting, etc. installed, and prior to occupancy,
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-0F-WAV/APPROACH - prior to placement of concrete/asphalt or, If gravel approach, after completion.
In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc. must
be inspected prior to cover. Check with the Building department for"specialinspections' in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency.
Building, plumbing (Includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 688-0195 or State Dept of Transportation
324-6000
Knit and inspecnom for &«hied %Sins Slate Depatnent of labor Pemits and inspections for Sewer Connetlion. Spokane County Utilities Division
Md Iodinates a24.26ao 477.3604
Penns and inspections for on-site septa systems. Spokane Regional Fire sprinkler and alarm systems and private access road inspections. Spokane valley
Health District 324.1560 Fire Department 892-4122
Stale law RCW 19.122 requires that prcr to any excavation the 'CALL BEFORE YOU OIG' center crust be notified. can bete you dig at least 2 working days In advance, 4512000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by Ilmltation and be declared void if a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is
finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit
All refund requests must be made in writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or coliected. Refunds of not more than 80% of a permit fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date
%6077
Staff Approval Date