Loading...
2007, 12-05 Permit: 07004771 Plumbing FixturesTotal Fees AmountPaid AmountOwing $47.00 $47.00 $0.00 Tran Date 12/05/2007 Receipt # 12323 Payment Amt $47.00 Contractor: STEEL STRUCTURES AMERICA INC License #: STEELSA044BD TOILETS/BIDETS 1 $6.00 SINKS PROCESSING FEE $35.00 FOR PLUMBING INSPECTIONS CALL (509) 688-0054. Total Permit Fee: I $6.00 $47.00 BUILDING DIVISION Site Information 11707 E. Sprague Avenue, Suite 106 Spokane Valley, WA 99206 Project Information 1 Site Address: 13914 E 8TH AVE Parcel Number: 45233.3905 Subdivision: Block: Lot: Zoning: UR -3 Urban Residential 3.5 Owner: THOMAS, GEORGE Address: 1237 145TH AVE SAN LEANDRO, CA 94578 Building Inspector: EAST Water Dist: VERA Project Number: 07004771 Inv: 1 Issue Date: 12/05/2007 Permit Use: 1 TOILET, 1 SINK Applicant: STEEL STRUCTURES OF AMERICA PO BOX 895 POST FALLS ID 83877 Phone: (208) 777-8597 Contact: STEEL STRUCTURES OF AMERICA PO BOX 895 POST FALLS ID 83877 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (208) 777-8597 Rear: Permits Plumbing Permit 1 Payment Summary 1 Notes / Conditions of Approval PERMIT #07003099 -DEMOLITION PERMIT MUST BE ISSUED WITHIN 30 DAYS OF PERMIT ISSUANCE. DEMOLITION MUST BE COMPLETED WITHIN 60 DAYS. Processed By: Main, Jodi L Printed By: PATRICIA PRINCE Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicanl's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This Inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner'slpermittee's expense. FOUNDATION -when forms and reinforcement are In place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping. before covering, metal chimneys before concealment, and final. FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire depariment access, on-site drainage (208' swales). road Improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES - Final inspection required when complete. stairs. handrails, skirting, etc. installed, and prior to occupancy; completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF.WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach. after completion. In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing. drywall. concrete. etc. must be Inspected prior to cover. Check with the Building department for `special inspections in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Permits and Inspections for Secelnl tonna Slate Department of Labor And Industries 324-2940 Peril and inspections rw on•sile septic systems. Spokane Regmnal Health ['PPP 324-15O Road cuts for utilities or driveways, City of Spokane Valley Public Works 6B8-0195 or State Dept of Transportation 324-6000 Female and inspections for Serer Connection. Spokane Coumy Utilities of Nam 477.3604 Fire sprinkler and alarm ayslems and p vale access road Inspections. Spokane Valley Fire Department 592-4122 Slate law RCW 19.132 requires teal prior to any excavation dm 'CALL BEFORE YOU 01G' center must be notified. Call before you dig al leas) 2 wor tng days in advance. 4558000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void If a) work is not started within 180 days of obtaining a permit, or b) work is abandoned for 180 days or more after beginning work. or c) after two years from the date of permit Issuance, regardless of whether the work is finished. If a permit i5 expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a penult fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled prior to the plan review being completed. Owner / Agent Date Staff Approval Date 016 )01