2007, 12-05 Permit: 07004771 Plumbing FixturesTotal Fees AmountPaid AmountOwing
$47.00 $47.00 $0.00
Tran Date
12/05/2007
Receipt #
12323
Payment Amt
$47.00
Contractor: STEEL STRUCTURES AMERICA INC License #: STEELSA044BD
TOILETS/BIDETS 1 $6.00 SINKS
PROCESSING FEE $35.00
FOR PLUMBING INSPECTIONS CALL (509) 688-0054.
Total Permit Fee:
I $6.00
$47.00
BUILDING DIVISION
Site Information
11707 E. Sprague Avenue, Suite 106
Spokane Valley, WA 99206
Project Information
1
Site Address: 13914 E 8TH AVE
Parcel Number: 45233.3905
Subdivision:
Block: Lot:
Zoning: UR -3 Urban Residential 3.5
Owner: THOMAS, GEORGE
Address: 1237 145TH AVE
SAN LEANDRO, CA 94578
Building Inspector: EAST
Water Dist: VERA
Project Number: 07004771 Inv: 1 Issue Date: 12/05/2007
Permit Use: 1 TOILET, 1 SINK
Applicant: STEEL STRUCTURES OF AMERICA
PO BOX 895
POST FALLS ID 83877 Phone: (208) 777-8597
Contact: STEEL STRUCTURES OF AMERICA
PO BOX 895
POST FALLS ID 83877
Setbacks - Front: Left: Right:
Group Name:
Project Name:
Phone: (208) 777-8597
Rear:
Permits
Plumbing Permit
1
Payment Summary
1
Notes / Conditions of Approval
PERMIT #07003099 -DEMOLITION PERMIT MUST BE ISSUED WITHIN 30 DAYS OF PERMIT ISSUANCE.
DEMOLITION MUST BE COMPLETED WITHIN 60 DAYS.
Processed By: Main, Jodi L
Printed By: PATRICIA PRINCE Page 1 of 1
PERMIT
NOTICE
The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by
definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the
applicant/permittee that the use described on the front of this permit complies with applicable codes and that required
inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before
progressing beyond the point where inspections are required may necessitate removal of certain parts of the
construction at the applicanl's/permittee's or property owner's expense. At a minimum, the following inspections ARE
REQUIRED by City Code:
FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes.
NOTE: This Inspection includes review of the structure's setback from property lines. Minimum setbacks are established by City of Spokane
Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable
setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any
responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure. Failure to
properly locate the structure may require its relocation at the owner'slpermittee's expense.
FOUNDATION -when forms and reinforcement are In place and prior to placement of concrete.
PLUMBING - after rough -in, before covering, and final.
MECHANICAL - rough -in of piping. before covering, metal chimneys before concealment, and final.
FRAMING - after all framing, bracing and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to
concealing.
FINAL - when complete and prior to occupancy and/or use. All permits require final inspection.
NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site
plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire depariment access,
on-site drainage (208' swales). road Improvements, parking and landscaping are common requirements of a permit/site plan which must be
completed prior to final approval of a building or issuance of a Certificate of Occupancy.
MANUFACTURED HOMES - Final inspection required when complete. stairs. handrails, skirting, etc. installed, and prior to occupancy;
completed inspection record card must be available on site.
PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover.
RIGHT-OF.WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach. after completion.
In addition to the above. any plumbing or mechanical systems or material which would be concealed by framing. drywall. concrete. etc. must
be Inspected prior to cover. Check with the Building department for `special inspections in conjunction with commercial projects.
FOR INSPECTIONS
Please give one working day/24 hour notice. Different parts of your project may require permits and Inspections from more than one agency.
Building, plumbing (includes interior reversals for sewer) and
mechanical, City of Spokane Valley Building Division 688-0054
Permits and Inspections for Secelnl tonna Slate Department of Labor
And Industries 324-2940
Peril and inspections rw on•sile septic systems. Spokane Regmnal
Health ['PPP 324-15O
Road cuts for utilities or driveways, City of Spokane Valley
Public Works 6B8-0195 or State Dept of Transportation
324-6000
Female and inspections for Serer Connection. Spokane Coumy Utilities of Nam
477.3604
Fire sprinkler and alarm ayslems and p vale access road Inspections. Spokane Valley
Fire Department 592-4122
Slate law RCW 19.132 requires teal prior to any excavation dm 'CALL BEFORE YOU 01G' center must be notified. Call before you dig al leas) 2 wor tng days in advance. 4558000.
PERMIT EXPIRATION AND REFUNDS
All permits shall expire by limitation and be declared void If a) work is not started within 180 days of obtaining a permit, or b) work is
abandoned for 180 days or more after beginning work. or c) after two years from the date of permit Issuance, regardless of whether the work is
finished. If a permit i5 expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to
finish the original permit.
All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee
payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a penult fee may be
authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized
when an application is withdrawn or cancelled prior to the plan review being completed.
Owner / Agent
Date
Staff Approval Date
016 )01