Loading...
2012, 08-28 Permit: SW-12002088 SewerSPOKANE COUNTY BUILDING AND PLANNING PERMIT Application Number. SW -12002088 Permit Issued Date: 08/28/2012 Expiration Date: Project Description: SEWER CONNECTION Primary Contact: POUL CONSTRUCTION Project Name: SUTTERS Applicant: POUL CONSTRUCTION Permit Type: SEWER Address: 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 Phone: 509-979-5872 Email: SITE INFORMATION' Site Address: Parcel Number: Subdivision: Assessor's Description: Inspection Area: Zoning: 14016 E BTH AVE 45233.0807 VERA W88.5FT OF THE E177FT OF THE N1/2 TR 149 Owner: Address: Phone: Email: GRAFF, R W 14016 E 8TH AVE VERADALE, WA 99037-9657 Water District: Vera Fire District: Spokane Valley Fire Irrigation District #15 Land Area: 28512 Square Feet CONTRACTOR INFORMATION' General Contractor POULCC'932B0 POUL CONSTRUCTION 18902 E 2ND AVE SPOKANE VALLEY, WA 99027 509-9795872 DETAILS: Class Type Quantity Dolt Charge Value SEWER SEWER CONNECTION 1 $125.00 $125.00 FEE DETAIL' Processing - Utilities Utilities Permit Total Fee: $125.00 $25.94 $125.00 $150.94 CONDITIONS' Plan review fee Is required for all site plan reviews conducted by Spokane Valley Fire. Inside Public Transit Benefit Area CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES. INCLUDING THOSE RELATED TO TRENCH SAFETY. Date Printed: 08/28/2012 12:33:56 Pdnted by. IIS APPPOOL\ASP.NET v4.0 SPOKANE COUNTY BUILDING AND PLANNING PERMIT Permit Issued Date: Application Number. SW -12002088 08/28/2012 Expiration Date: FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES. INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. Data Printed: 08/28/2012 12:33:56 Printed by. IIS APPPOOLASP.NET v4.0