Loading...
2010, 05-14 Permit: 10001389 Plumbing Fixtures1 Contractor: COURCHAINE CONSTRUCTION License #: COURCC* 181 R7 WATER PIPING - DWV t $6.00 PROCESSING FEE Total Permit Fee: FOR PLUMBING INSPECTIONS CALL (509) 688-0054. $37.00 $43.00 1 1 1 s�� PERMIT CENTER 11703 E. Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 14022 E 8TH AVE Parcel Number: 45233.0805 Subdivision: Block: Lot: Zoning: R-3 SF Res District Owner: FLYNN-HIGLEY LIVING TRUST, J W Address: 14022 E 8TH AVE VERADALE, WA 99037 Building Inspector: EAST Water Dist: VERA Project Number: 10001389 Inv: 1 I.ssue Date: 05/14/2010 Permit Use: 1 DWV Applicant: COURCHAINE Construction 19818 E SPRAGUE GREENACRES, WA 99016 Contact: COURCHAINE Construction 19818 E SPRAGUE GREENACRES, WA 99016 Setbacks - Front: Left: Right: Group Name: Project Name: Phone: (509) 924-5485 Phone: (509) 924-5485 Rear: Permits Plumbing Permit 1 Payment Summary Total Fees AmountPaid AmountOwing $43.00 $43.00 $0.00 Tran Date Receipt # Payment Amt 05/14/2010 22773 $43.00 Processed By: DAVIS, JENNA Printed By: MORRIS, HEATHER Page 1 of 1 PERMIT NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicant/permittee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are In place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection includes review of the structure's setback from properly lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily indicative of property lines. The responsibltity to comply with applicable setback provisions Iles solely with the permittee-nelther the City of Spokane Valley nor its authorized representatives assume any responsibility for the verification or location of your properly lines. Please verify their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owners/permittee's expense. FOUNDATION - when forms and reinforcement are in place and poor to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL. - rough -in of piping, before covering. metal chimneys before concealment. and final. FRAMING - after all framing, bradng and blocking is in place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL - when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection Includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-site drainage ('208' swales), road improvements, parking and landscaping are common requirements of a permit/site plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES- Final inspection required when complete, stairs, handrails. skirting, etc. installed, and prior to occupancy: completed inspection record card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS - prior to cover. RIGHT-OF-WAY/APPROACH - prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall. concrete, etc. must be Inspected prior to cover. Check with the Building department for 'spedat inspections' in conjunction with commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes interior reversals for sewer) and mechanical, City of Spokane Valley Building Division 688-0054 Road cuts for utilities or driveways, City of Spokane Valley Public Works 688-0195 or State Dept of Transportation 324-6000 Remits and inspections for electrical wing, Stale Department of Labor Permits and Inspections fa -Sewer Connection. Spokane County Utilities CiV&cn And Industries 324-2640 477-3604 permits and tnspetllms for on -see septic system. Spokane Re91onS Fre sprinkler and dart systems and private access road inspections, Spokanevaney Heana DisWel 324.1560 Fee Department 992-4122 Slab law RCW 19.122 regures that Ow to any excavation the 'CALL BEFORE YOU 0161centermust be notified, cal before you dig al least 2 working days in advance. 4569000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void H a) work is not started within 1130 days of obtaining a permit, or b) work Is abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work to finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the date of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a penult fee may be authorized when no work has been done under the permit Issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawn or cancelled price to the plan review being completed. Owner Agent Date •/0n Staff Approval Date