2012, 08-02 Permit: SW-12001900 SewerSPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Application Number: SW -12001900
4
Permit Issued Date:
08/02/2012
Expiration Date:
Project Description:
Project Name:
Permit Type:
SEWER CONNECTION
SUTTERS PH 3
SEWER
Primary Contact:
Applicant:
Address:
Phone:
Email:
SAXBY, HAILEY / SANDENO, ROBERT
SAXBY, HAILEY/SANDENO, ROBERT
14108 E 18TH AVE
SPOKANE VALLEY, WA 99037
SITE INFORMATION
Site Address:
Parcel Number:
Subdivision:
Assessor's Description:
Inspection Area:
Zoning:
14108 E 8TH AVE
46233.0725
TALLY 110 SUBDIVISION
VERA TALLY HO B148 L1 B3
Water District: Vera
Irrigation District #15
Owner:
Address:
Phone:
Email:
SAXBY, HAILEY / SANDENO, ROBERT
14108 E 18TH AVE
SPOKANE VALLEY, WA 99037
Fire District: Spokane Valley Fire
Land Area: 10780 Square Feet
CONTRACTOR INFORMATION'
Owner Acting As Builder
OWNER
OWNER
NOT KNOWN AT TIME OF ENTRY
UNKNOWN, UK 00000
DETAILS -
Class Type
Quantity Unit Charge Value
SEWER SEWER CONNECTION
FEE DETAIL•
Processing - Utilities
Utilities Permit
1 $125.00 $125.00
Total Fee:
$125.00
$25.94
$125.00
$150.94
CONDITIONS.
Inside Public Transit Benefit Area
CALL 1-800-424-5555 BEFORE YOU DIG—AT LEAST 2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE
INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE
RELATED TO TRENCH SAFETY.
FOR SEWER INSPECTIONS CALL THE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5:00 MONDAY -FRIDAY PRIOR TO COVER.
ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES
APPLY AFTER 30 MINUTES.
1 Date Printed: 08/02/2012 14:30:21
Printed by: IIs APPPOOLV SP.NET v4.0
SPOKANE COUNTY BUILDING AND PLANNING
PERMIT
Permit Issued Date:
Application Number: SW -12001900 - 08/02/2012
Expiration Date:
INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED
TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF
SEWER STUB PRIOR TO ANY OTHER EXCAVATION.
SEWER STUBS AND DRY SIDE SEWERS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE
ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR
GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE.
THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE
LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF
UNDERGROUND FACILITIES.
Date Printed: 08/02/2012 14:30:21
Printed by: IIS APPPOOLWSP.NET v4.0