Loading...
2009, 09-03 Permit App: 09002672 Residence Project Number: 09002672 Inv: 1 Application Date: 9/3/2009 Page 1 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Project Information: Permit Use: SFR W/ATT GAR Contact: CREACH,ERNEST B&MARY L Address: 14208 E 4TH AVE C-S-Z: SPOKANE,WA 99216-2105 Setbacks:Front Left: Right: Rear: Phone: (509)892-7365 Group Name: Project Name: Site Information Plat Key: Name: Range District: East Parcel Number: 45232.9155 Block: Lot: SiteAddress: 14217 E 8TH AVE Owner:Name: CREACH,ERNEST B&MARY L Address: 14208 E 4TH AVE Location::CSV SPOKANE,WA 99216-2105 Zoning: R-3 SF Res District Water District: 010 VERA Hold: ❑ Area: .67 Acres Width: 0 Depth: 0 Right Of Way(ft): 0 Nbr of Bldgs: 0 Nbr of Dwellings: 0 Review Information: w.,wmgEw.m.singw - :‘, - ,A,VNMAWsA-rABMERWACCo.124EN Review Building Plan Review Released By Originally Released: 8/31/2009 By: tmelbourn Driveway/Approach Released By: Originally Released: 9/1/2009 By: WMCGAV Potable Water Review Released By: Originally Released: 9/1/2009 By: jdavis Landuse/Zoning/HE Conditions Released By: Originally Released: 8/25/2009 By: CJJANSSE Operator: JD Printed By: JD Print Date: 9/3/2009 Project Number: 09002672 Inv: 1 Application Date: 9/3/2009 Page 2 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit Sewer Review Released By: Originally Released: 9/1/2009 By: jdavis Approach Contractor: OWNER Firm: OWNER Phone: (000)000-0000 Item Description Units Unit Desc Fee Amount APPROACH-CONST IN ROW 1 NUMBER OF $50.00 Permit Total Fees: $50.00 Building Permit Contractor: OWNER Firm: OWNER Phone: (000)000-0000 This Application: Total Project: Description Grp Type Notes Sq Ft Valuation Sq Ft Valuation 1&2 FAMILY R-3 VB 1,831 $177,295.73 1,831 $177,295.73 2ND FLOOR R-3 VB 798 $59,594.64 798 $59,594.64 BASEMENT U R-3 VB 1,831 $27,465.00 1,831 $27,465.00 COV DECK R-3 VB 295 $4,425.00 295 $4,425.00 GARAGE U-1 VB 496 $9,424.00 496 $9,424.00 Totals: 5,251 $278,204.37 5,251 $278,204.37 Item Description Units Unit Desc Fee Amount RESIDENTIAL PERMIT FEE 1 SELECT $1,996.15 WSBCC SURCHARGE 1 SELECT $4.50 SF PLNS RVW<7999 SQ FT 1 SELECT $798.46 Permit Total Fees: $2,799.11 Operator: JD Printed By: JD Print Date: 9/3/2009 Project Number: 09002672 Inv: 1 Application Date: 9/3/2009 Page 3 of 3 THIS IS NOT A PERMIT Penalties will be assessed for commencing work without a permit SAW CUTTING OF EXISTING CURB IS NOT ALLOWED WITHIN THE CITY'S JURISDICTION.DRIVEWAY IS TO BE INSPECTED BY THE CITY'S ROW INSPECTOR PRIOR TO CONCRETE PLACEMENT. Payment Summary: ,. _ Permit Type Fee Amount Invoice Amount Amount Paid Amount Owing Approach $50.00 $50.00 $0.00 $50.00 Building Permit $2,799.11 $2,799.11 $787.26 $2,011.85 $2,849.11 $2,849.11 $787.26 $2,061.85 Disclaimer: Submittal of this application certifies the owner(or person(s)authorized by the owner)has both examined and finds the information contained within to be true and correct,and agrees that all provisions of laws and/or regulations governing this type of work will be complied with. Subsequent issuance of a permit shall not be construed to be a permit for,or an approval of,any violation of any of the provisions of the code or of any other state or local laws or ordinances. Signature: Operator: JD Printed By: JD Print Date: 9/3/2009 ' Permit Center cm ow 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER: 9.2 ' 7 Spokane Spokane Valley,WA 99206 PERMIT FEE: 4iValleyA (509)688-0036 FAX:(509)68&-0037 www.spokaneval ley.org Community Development Residential Construction L t New Construction Accessory Bldg Permit Application Addition/Remodel Deck Other: SITE ADDRESS: i Aifu•��ev.t ASSESSORS PARCEL NO: 44S Dia .Qi I S r1 LEGAL DESCRIPTION: Building Owner: Contractor: Name: \ Name: �4`‘nt2 C`CMCV. Address: \q\c\- F L\4 Address: City: sl j ,,,.,e\I `�\\�\ State: K Zip:c\ga`k< City: State: Zip: Phone: S oy F w\ a •) ,S) Fax: Phone: Fax: Contractor Lic No: Exp Date: Contact Person City Business Lic.No: Name: Er.,r.,.e cs:c-eC!.c\ Phone: cel c\G A kt,a. iiik Describe the scope of work in detail: Cost of Project: $ �0o, 00 o tie • n'le Fcaw„ly RCA1 t UN( k WAV. ikticAtc\ G-Y.cty�. Proposed Use: Kt, G e v`c e_ **************The following MUST be complete: (write N/A if not applicable)********************** HEIG y T �o PEAK: DIMENSIONS: #OF STORIES: TQIAL HABITABLE SPACE: 3xo 1 MAIN FLOOR TO SQ. 2Nu FLOOR SQ. FTG: UNFIN BASEMENT SQ. FTG: IMPERVIOUS SURFACE v FTG: 1431 DK_ �ciO otL f AREA: FINISHED BASEMENT G ^GF SQ,FTG: V. PA 1O .0. FTG: 30% SLOPES ON SQ. FTG: �O DEC,.) 79S PROPERTY:N o #OF BEDROOMS: CONSTRUCTION TYPE: H T S` = . SEWER OR SEPTIC? - (A,S S-t.,a e.4- The The permitee verifies,acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling,the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. SIGNATURE: DATE: _ _v Method of Payment: Aiii-' - ' 1009 ❑ Cash 0 Check 0 Mastercard 0 VISA Bankcard#: Expires: VIN#: Authorized Signature: II� QI2V1s 4 RESIDENTIAL CHECK LIST DIRECTIONS: ' Place a check mark in box next to each document required for complete submittal. ❑ SITE PLAN o Property lines and dimensions ❑ Setbacks to property lines o Direction arrow pointing North and orientation to streets o Distance between buildings ❑ Proposed/existing buildings (footprint and dimensions) o Right of way/easement location &sizes o Utilities, septic tank/drain field locations and distances o Driveway approach size and location BUILDING PLANS (3 SETS) (minimum 1/8 inch scale or completely dimensioned) ❑ Elevations (Front/Rear/Sides)with roof peak and wall height including basement: ❑ Foundation Plan (crawlspace, basement or slab on grade): o Footing sizes and locations ❑ Supporting wood cripple walls or beams o Perimeter concrete foundation wall sizes o Thickened concrete pads supporting o Crawlspace ventilation beams or girder trusses ❑ Floor Plan of each level (finished or unfinished)with dimensions: o Floor Joist direction, size and spacing ❑Window and door location and sizes o Header, beam or concrete lintel sizes ❑Window well locations if applicable ❑ Brace wall panel locations o Room usage labels o Water heater and furnace locations o Smoke detector locations o Exhaust fan locations ❑Attic and crawl space access locations ❑ Deck or concrete patio sizes and locations ❑ Fire Wall construction ❑ Roof Plan: o Engineered truss direction and spacing o Ridge, eave and valley lines o Rafter and over frame direction, size and spacing o Beam and girder size and location ❑ Wall Section Detail including: Roof o Slope/roofing material/ underlayment/ice dam protection o Truss or rafter size, spacing &connection o Sheathing size and type o Attic insulation/air space baffle/ventilation Ceiling o Joist size and spacing o Size of ceiling gypsum wall board Wall o Height/top plate/stud size and spacing/sole plate o Siding/exterior house wrap/anchor bolts o Exterior sheathing size and type ❑ Insulation, vapor barrier, gypsum wall board Floor o Joist size and spacing ❑ Sheathing or concrete floor size/insulation Foundation Wall o Concrete or Masonry unit width ❑ Footing bottom to finished ground level depth o Earth to wood separation distance o Horizontal &vertical reinforcement if any Footing o Size o Reinforcement if any Radon o Passive system with 6mi1 vapor barrier o Active system with 6 mil vapor barrier Miscellaneous Construction Details ❑ Deck: o Floor plan/side view/dimensions o Footings/post/and beam size and locations o Floor Joist/decking direction, size and spacing O Stairway tread rise & run and nosing 0 Handrail/Guard height & spacing Sc,r;�r +r" ��wn, Permit Center PERMIT NiJMBER: / Arc. pokane 11703 E Sprague Ave, Suite B-3 ° 4p - 'Milley Spokane Valley,WA 1206 ,: •,r:�L L PERMIT FEE: (509)688-0036 FAX: (509)688-0037 Community Development www.spokanevalley.org AUG 2 "! 2009 Approach Permit Application 8Y, PROJECT ADDRESS l y 5 a -k I S 5 START DA 1'E ANTICIPA IED COMPLETION DA 1'E Building Owner. Contractor. Name: C r(( L, Name: Address: %/4 (03 E t.({(,‘ Address: City: r It�h4 \k,te`1 State: \ak Zip:Ti a(L City: State: Zip: Phone: SQc _ c _7 3(0/5 Fax: sock ct db' 4L, 14 Phone: Fax: Contact Person C r C Cr e t. Contractor Lic No: Exp Date: Name: F,r v\%e C re c At. City Business Lic.No: Phone: ,\C.k _ PROJECT DESCRIPTION (Provide site sketch) )( Residential Driveway Commercial/Industrial Driveway Existing Curb&Gutter Rural Road Section Culvert Installation Sidewalk Repair/Construction Other Conditions Bond/Insurance certification must be on file with the city. DISCLAIMER The permittee verifies, acknowledges and agrees by their signatures that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction.4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws, codes or ordinances. 6) Plans r I'tional information may be required to be submitted, and subsequently approved before this application can be processed. Signature < �/ Date O ).1/01 Method of Payment ❑ Cash ❑ Check ❑ Mastercard ❑ VISA ❑ Other Bankcard#: Expires: VIN#: Authorized Signature: Effective October 28,2007 P:\Community Development\Forms\Building forms\Approach Permit eff 10-28-07.doc CISOnokandlilliiillee\11111111111 Development Engineering Mtlley 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 ♦ Fax: 509.921.1008 • cityhall®spokanevalley.org Approach Permit Application Review TO: Building Department Site Address: Parcel #45232.9155 Project No: 9-2672 Accepted Not Accepted Approach X Building Location Paved Access Notes: Saw cutting of existing curb is not allowed within the City's jurisdiction. Driveway is to be inspected by the City's ROW Inspector prior to concrete placement. Reviewed By: ,7/ 1e-e �/r i L Date: 7/4_7(/,' Exhibit A Title Order No. 160411 That portion of Tract A and Tract B, SHORT PLAT NO. 84-302, as per plat recorded in Volume 3 of Short Plats, page 97, records of Spokane County, lying Easterly of the following described line; BEGINNING at a point on the South line of said Tract B, 15 feet East of the Southwest corner thereof; Thence North 00°02'08" East parallel with the West line of said Tract B to the North line of said Tract A and the terminus of said line description; Situate in the County of Spokane, State of Washington. CERTIFICATE OF WATER AVAILABILITY • APPLICANT'S NAME LOCATION (ADDRESS) I \ ( PROPOSEDUSE PHONE NUMBER Water requested: Number of residential taps or commercial flow of GPM. (Attach map or legal description,if necessary) Building Permit Short Subdivision - Rezone or other Preliminary Plat or PUD i• DEPAR V I NT REVIEW a Water,O.r will be available at the rate of flow and duration indicated below at no less than 20 psi measured at the • near . e hydrant which is 2 OD feet from the building/property above(Or as marked 0 on the map attached). • Rate of flow Duration • _ Less than 500 gpm(approx. gpm) Less than one hour 500 to 999 gpm 1 hour to 2 hour • ,;k:2 1000 gpm or more • 2 hours or more Calculation of gpm(Commercial building permits require a flow test or calculation) Flow test of gpm j�`� Water system is NOT capable of providing fire flow. • ) Fire flow is satisfactory Fire flow is NOT satisfactory• Fire District Signatory name - 70 Date of Signature PURVEYOR ---P-----�- NAME I ei-• W Purveyor's Address 9" d , 'Q 3 e W Telephone Number ��-"2l) —WATER PURVEYOR INFORMATION 1. a. Water will be provided by service connection only to the existing inch water main feet from the site. OR b. _ Water service will require an improvement to the water system by the contractor of: (1) feet of water main to reach the site;and/or (2)the construction of a distribution system on the site:and/or (3)other(describe)elimination of temporary water services through District participation,which will require a public hearing. 2. a. • The proposed project is consistent with the water purveyor's DOH approved water • system plan. b. The water system has a current Washington Department of Health Operating permit,allowing the number of new taps or water requested. • COMMENTS/CONDITIONS • I hereby certify that the above water purveyor information is true.This c €te 'on shall be valid for one year from the date of signature. • A ncy(District)name •ignatory Imre ? i 9 • 1 Title Signatory date Parcel 45232.9155 175' • A A 25' V 10' Proposed N: Residence 76' 4 50' 115' 20' • 4 • 95' PLANNING DEPT. APPROVED BY:CJOULL 96' DATE: FA clYS I O.) c\I V V 80' E. 8th St. . For City Use Only CITY OF PLUS Project Number oc( 7(0 1 rf_ pokane Project Address 4000 a TVy° 11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206 509.688.0036 ♦ Fax: 509.688.0037♦ permitcenter®spokanevalley.org As part of our on-going commitment to customer service during the review process of your project application, we are providing you with a TARGET DATE for the initial technical application review. If for any reason we cannot meet this date, we will contact you with a revised target date. Your application review TARGET DATE is Z 5j C 7 The TARGET DATE is the date we estimate your project application will have had its initial technical review. It is not the date for approval or permit issuance. Tips for a Smoother Project Application Review ➢ Submit complete, accurate plans and documents. Extra time may be required for re-submittals as project application reviewers work on multiple applications and it may be several days before they can look at your new or revised information. ➢ Designate a specific contact person to communicate with the City. While the person designated as the applicant's contact person with the City can be changed, one individual with the expertise for dealing with reviewer comments would be the best choice for the entire review process. ➢ Call staff regarding the status of your project only after the target date shown at the top of the page. Although you should be contacted on or by the target date,please feel free to contact us if you haven't heard from us by your target date. Staff may contact you before the target date if the initial review is complete. By following this procedure,you will save time and allow the reviewers to complete the work more expeditiously. Steps in the Permit Process 1. Counter Complete. Your application has been accepted as counter complete. This means all of the required documents, as indicated on your Pre-Application Checklist have been submitted or have been approved for deferred submittal. This does not prevent technical staff from requesting additional information as a result of their technical review. 2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free from substantive flaws that would prevent technical staff from completing the technical review once it is started. When this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it comes up for review. 3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by phone,fax,email,or mail by your TARGET DATE once the initial technical compliance review is complete. 4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re- submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections of the application are received, a Permit Specialist will process the application and contact the person specified on your application for permit pick-up. Information regarding fees and pre-construction meetings (if required) will be provided by the Permit Specialist at that time. WHITE-APPLICANT PINK-BUILDING FILE REV 9/07