Loading...
2011, 01-05 Permit: 11000020 PipingSrPOkan' PERMIT CENTER Walley 1703E Sprague Avenue, Suite B-3 Spokane Valley, WA 99206 Site Information Project Information Site Address: 6520 E STH AVE Project Number: 11000020 Inv: I Issue Date: 01/05/2011 Perni t Use: I GAS PIPING Parcel Number: 35243.0104 Subdivision: Applicant: KELLER HEATING INC Block: Loh PO BOX 6595 Zoning: R-3 SF Res District SPOKANE WA 99217 Phone: (509) 926-3551 Contact: KELLER HEATING INC Owner: MERENZ, JAMES D TO BOX 6595 Address: 6520 E 8TH AVE SPOKANE WA 99217 Phone: (509) 926-3551 SPOKANE VALLEY, WA 99212 Setbacks -Front Left: Right Rear: Building Inspector: SOUTH Water Dist: EAST SPOKANE Group Name: Project Name: Permits Mechanical Permit Contractor KELLER HEATING _ License N: KELLEHI01016 GAS PIPING 1 $1,00 PROCESSING FEE $37.00 Total Pernut Fee: S38 00 FOR MECHANICAL INSPECTIONS CALL (509) 688-0054. Payment Summary Total Fees AmountPaid AmountOwin¢ Tran Date RecR� Payment Amt $38.00 $38.00 $0.00 01/05/2011 25521 $3800 Processed By: Main, Jodi L PERMIT Printed By: MORRIS, HEATHER Page I of 1 NOTICE The ownership of a Spokane Valley Development Permit will inure to the property owner. The permit applicant, by definition, is the property owner or an authorized agent of the property owner. It is the responsibility of the applicantlpermiflee that the use described on the front of this permit complies with applicable codes and that required inspections are requested. Failure to request inspections as listed below and obtain the necessary approvals before progressing beyond the point where inspections are required may necessitate removal of certain parts of the construction at the applicant's/permittee's or property owner's expense. At a minimum, the following inspections ARE REQUIRED by City Code: FOOTING - when forms and reinforcement are in place and prior to placement of concrete -all structures, including manufactured homes. NOTE: This inspection Includes review of the structures setback from property lines. Minimum setbacks are established by City of Spokane Valley Ordinance. Curb lines and fence lines are not necessarily Indicative of property lines. The responsibility to comply with applicable setback provisions lies solely with the permittee -neither the City of Spokane Valley nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verity their location prior to locating your structure. Failure to properly locate the structure may require its relocation at the owner's/permibee's expense. FOUNDATION -when forms and reinforcement are In place and prior to placement of concrete. PLUMBING - after rough -in, before covering, and final. MECHANICAL - rough -in of piping, before covering, metal chimneys before concealment, and final. FRAMING -after all framing, braung and blocking is In place, rough electrical, plumbing and mechanical systems are complete, and prior to concealing. FINAL -when complete and prior to occupancy and/or use. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ('2D l'swalesl, road improvements, parking and landscaping are Common requirements of a permiVsite plan which must be completed prior to final approval of a building or issuance of a Certificate of Occupancy. MANUFACTURED HOMES — Final inspection required when complete, stairs, handrails, skirling, etc. installed. and prior to occupancy: completed inspection record Card must be available on site. PLUMBING REVERSALS FOR SEWER CONNECTIONS — prior to cover. RIGHT-OF-WAY/APPROACH — prior to placement of concrete/asphalt or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, Concrete, etcmost be inspected prior to cover. Check with the Building department for -special inspections' in Conjunction with Commercial projects. FOR INSPECTIONS Please give one working day/24 hour notice. Different parts of your project may require permits and inspections from more than one agency. Building, plumbing (includes Interior reversals for sewer) and Road cuts for utilities or driveways. City of Spokane Valley mechanical, City of Spokane Valley Building Division 688-0054 Public Works 688-0195 or State Dept of Transportation 324-6000 fem0: andn5peaonz for kni wmnp, stale oepanmem of abo,anis emne forewer sConneaon Spokane county unx4es Dodd and nepd oll..I And and rdere IIIc rd 1—II and nsce=uon:for m -are seoo=syslem5. Spokane arsenal Fre sonnkler and alarm syalelrs and gtwle access road mscenlms, Spokane coa, lteallllr inn III le. 1-0epanmenl $92.4122 eal, law ll 19121 rtamm Ileal Ono, to any en—drion he CALL BEFORE do. do center must de Ict led. Cell bMwe you beg at oral I—I n9 dep �n advance, 4569000. PERMIT EXPIRATION AND REFUNDS All permits shall expire by limitation and be declared void If a) work is not started within 180 days of obtaining a permit, or b) work's abandoned for 180 days or more after beginning work, or c) after two years from the date of permit issuance, regardless of whether the work Is finished. If a permit is expired for time, a new permit may be obtained for half the permit fee based on the value of the remainder of the work t0 finish the original permit. All refund requests must be made In writing by the original permittee to the Building Official no later than 180 days after the data of fee payment. 100% refunds will be granted for any fee erroneously paid or collected. Refunds of not more than 80% of a permit fee may be authorized when no work has been done under the permit issued. Refunds of not more than 80% of a plan review fee paid may be authorized when an application is withdrawri cancelled prior to the plan review being completed. Owner/Agent��✓� '�n� Date Staff Approval Date