Loading...
2010, 06-17 Permit App: 10001788 Grading T T Permit Cel ^- l SSOor11703 E pue Ave,Suite B-3 PERMIT NUMBER —�, pokane Spokane Valley,WA 99206 j Valley (509)688-0036 FAX: (509)688-0037 PERMIT FEE: permitcenter@spokanevalley.org Community Development Grading n Rough/Clearing ❑ Full Grading Permit Application ❑ Underground ❑ Site Improvements SITE ADDRESS /q/9Z. E g*4,4v, S Pai .-'C 1/44.41; wif 7,7. 4' ASSESSORS PARCEL NO: 5'5'2,32 yp 99 LEGAL DESCRIPTION: Property Owner Excavation Contractor B Q�/���,, ;V� Name: G 4204/VC /J i, / /=4 v Name: Manager: Address: Address/yyz 3 L SA"'X AL./E City: State: Zip: City: SPo/cA)/E t/44.4_6 i State: Lv4 Zip:9 9p3t Phone: Fax: Phone:so? 9 Z C g g 3 y Fax: Lic No. Exp Date: Contact Person City Business Lic No: Name: /,iezrz-✓ SAi!>H Engineer Phone: SR9 3 9s s- 70 Company Name: 12A..&i2 KWaALL Address:/2.0/ A/ Laeicid/?V Iq Identify and describe the work and indicate the use: City: SPAled/A/(., 1/4L1/' State:L,/4 Zip: j- U36 7"-ie-7"-- /AA Pen vC•u C.4v1 Phone:50 9 ' q y /5-8 4/ Fax:50 qz q 3 c Lic No: 39 ? E iZ J v Gip"6 Or✓ .3-'4 A/C iC/?0A4 Soil Testing Firm: it///4 /a ,c64--7- '7O ZQ FGA!; Company Name: Address: City: State: Zip: Estimated Excavation/Cut(Cu Yd): 413,5- cw Yo Phone: Fax: Estimated Embankment/Fill (Cu Yd):4'3. s c v Destination of Excavated Materials: Start Date: //Tu^iE 2-4/0 Estimated Completion Date: 1 S Aub 10/0 The permitee verifies, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit inure to the property owner. 3) The signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or local laws,codes or ordinances.6) Plans or additional information may be required to be submitted, and subsequently approved before this application can be processed. Signature: Date: / TvNG /0 Method of Payment: (Faxed permit applications will only be accepted with major bankcard) ❑Cash n Check ❑ Mastercard n VISA Bankcard#: Expires: ECFJVE Authorized Signature: CS}q PERMIT CEN t }re 1 JUN 172T - Project#__t_CO - Nkyne _ . Submitta' " --- _ Effective Effective 10-28-07 Page 1 of 1 P:\Community Development\Building DivisionVodi-comm'l\PCF\Grading Permit App.doc r r 6 RECEIVED JUN 22 2010 SCITYof Devel pment Engineering pokane Spokane Valley Permit Center 40,00Va"eT 11707 E Sprague Ave Suite 106 ♦ Spokane Valley WA 99206 509.921.1000 • Fax: 509.921.1008 ♦ cityhall@spokanevalley.org June 21, 2010 Randall Kendall 1204 N. Woodruff Spokane Valley, WA 99206 Re: SHP-05-10 (Ray's Short Subdivision) City Project(i.e. PLUS) No.: 10001788 Street and Drainage Plan Conditional Acceptance The Civil Plans for the above-mentioned project, which Development Engineering received on June 18, 2010 have been reviewed and found to be consistent with pertinent development regulations and thus have been accepted provided the minor corrections described below are done. Prior to Development Engineering signoff on the grading permit, the following items shall be addressed: 1. Prior to submitting the mylars,please email to me pdf s of the plans showing the following minor corrections for review: a. Label Centerline of 8th Avenue on Roadway Section A-A. b. Show Centerline of Right-of-Way on Roadway Section A-A c. Show Right-of-Way and Border Easement on Roadway Section A-A and on plan view. d. Add the following notes to "General Notes", "*A heavy application of tack coat or other approved material shall be applied to the full length of the saw cut to ensure that the joint is properly sealed" and"*All boulders and large rocks to be moved beyond Border Easement, or removed completely". e. Show a 1:10 taper, on west end of widening to tie into existing widened pavement. 2. The project engineer must submit Mylars with the corrections for signature. 3. The City has a plan acceptance construction stamp in AutoCAD. This stamp may be placed on the Mylars. If you would like this stamp,please contact Development Engineering via email. 4. The process to start construction, in summary, is: I. 1 Dev.Enz:SHP-05-10 Civil Plan Submittal#1 Conditional Plan Acceptance.docx Engineer provides: Dev. Eng At Pre-Construction 1) five paper signs mylars Contractor meeting (see copies of the then signs off calls below): signed mylar plus EngineerPermit • Contractor on the the original mylar SubmitsCenter to shows proof of grading to the Permit for mylars to permit and confirm paying --► Center to then be Permit holds onto ---► permit ---► grading permit. forwarded to Center forsigned off. • Certification Development mylars until Dev. Eng. the Pre- Contractor requirements Engineering. Construction picks up discussed. 2) Copies of meeting. permit. • Signed mylars accepted plans to distributed. contractor as needed. 5. A pre-construction conference is required. Please contact Rod Pegram,the Development Engineering Construction Inspector, at 720-5324 to schedule this meeting. Attendees shall include the Project Engineer,the Applicant/Developer,the Contractor,the Onsite Inspector who will be certifying the project and, if known,the subcontractors for concrete and asphalt. Meeting will not be held if these people are not able to be present. Prior to the meeting, it should be determined who will supply the weekly reports,the certification package and who will perform the testing. 6. Revisions shall be noted on a copy of the approved final civil plans and shall be labeled Record Drawings. Next steps: 7. Contact the Planning Department(Martin Palaniuk/720-5031) for additional conditions that may exist. 8. Contact the Permit Center(720-5240) for other requirements and needed permits (e.g. right-of- way obstruction permit). 9. Final Plat— a. Prior to final plat submittal,please contact Wayne McGavran at wmcgavran@spokanevalley.ora or 509-720-5323 to obtain plat language from Development Engineering. b. Prior to acceptance,the applicant or successors in interest shall submit: i. Improvements are to be constructed and accepted(by the Development Engineering Construction Inspector. For sureties,the City only accepts Letters of Credit or Cash Savings Assignments. If you have any questions, please email me at wmcgavran@spokanevalley.org or call me at(509) 720- 5323. Sincerely, Dev. Enc:SHP-05-10 Civil Plan Submittal#1 Conditional Plan Acceptance.docx Wayne McGavran Development Engineering Technician Copies: Helen& Gerald Smith, 6008 E. 6th Avenue#U-2, Spokane Valley, WA 99212 Spokane Valley Planning Department—Project Planner Spokane Valley Building Department-Permit Center Spokane Valley Development Engineering: • Development Engineer Inspector • Development Engineering—Wayne McGavran • Project File