2008, 01-18 Permit App: 08000156 Fire Damage RepairPrcjeci Number: 08000156 Inv: I
Application Date: 1/IW008 Pagel of
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Proiect Information:
Permit Use: REPAIR FIRE DAMAGE TO EXISTING Contact BELFOR CONSTRUCTION
STRUCTURE
Address: 10020 E. KNOX, SUITE 100
C - S - Z: SPOKANE, WA 99206
Setbacks: Front Left: Right Rear:
Phone: (509) 893-0001
Group Name:
Site Information:
Project Name:
Plat Key: Name: Range
District: Sout
Parcel Number: 35242.2610 Block:
Lot
SiteAddress: 6523E 8TH AVE
Owner: Name: RICHESON, DANIEL & LAUREN
Address: 6523 E 8TH AVE
Location:: CSV
SPOKANE VALLEY, WA 99212-05
Zoning: MF-1 MF MDR District
Water District 020 EASTSPOKANE
Hold:
Area: 13,500 Sq Ft Width:
0 Depth: 0 Right Of Way (ft): 0
Nbr of Bldgs: 0 Nbrof Dwellings:
0
Review Information:
Review._
Building Plan Review
! Released By _
Originally Released:
1/18/2008 By: TMELBOU
Permits:
Building Permit
Contractor: BELFOR CONSTRUCTION
Firrn: BELFOR CONSTRUCTION
Address: 10020 E. KNOX SUITE 100
Phone: (509) 893-0001
SPOKANE, WA 99206
This Application: Total Project:
Description GM TyDc Notes
Sq Ft Valuation So Ft Valuation
1&2 FAMILY R-3 VB FIRE
0 $37,000.00 0 $37,000.00
DAMAGE
Totals:
0 $37,000.00 0 $37,000.00
Item Description Units
Unit Desc Fee Amount
RESIDENTIAL PERMIT FEE I
SELECT $512.45
WSBCSURCHARGE 1
SELECT $4.50
SF PLNS RV W < 7999 SO FT I
SELECT $204.98
HOURLY REVIEW FEE 1
NOF HOURS $58.00
Permit Total Fees: $779.93
Operator: jmm Printed By: JD
Print Date: 1/18/2008
Project Number: 08000156 Inv: l Application Date: 111812008 Page 2 of 2
THIS IS NOT A PERMIT
Penalties will be assessed for commencing work without a permit
Notes:
....
_.
Payment Sfrmmarv:
Permit Twe
Fee Amount
Invoice Amount
Amount Paid
Amount Owine
Building Permit
$779.93
$779.93
$0.00
$779.93
$779.93
$779.93
$0.00
$779.93
Declaimer:
Submittal of this application certifies the owner (or person(s) authorised by the owner) has both examined and finds the information
contained within to be true and correct, and agrees that all provisions of laws and/or regulations governing this type of work will be
complied with. Subsequent issuance of a permit shall not be construed to be a permit for, or an approval of, any violation of any of
the provisions of the code or of any other state or local laws or ordinances.
Signature:
Operator: junta Printed By: JD Print Date: 1/18/2008
mra7�0004,� � 11703 E Sprague Ave, Suite B-3 PERMIT NUMBER:
Spokane Spokane Valley, WA 99206 PERMIT FEE:
X77 y. (509)688-0036 FAX: (509).68$-019{
VQllei n k or
lisLti`-. ,, ,j r,��4E VALLEY
Community Development[M1
Residential Construction r Ail- � LJ clew Construction El Accessory Bldg
Permit Application vL..MII CtN' /Remodel [:]Deck
SITE ADDRESS: • 3 F s3 , �✓'�/ .mac- I✓ « `.' �i`- " - Z 1
ASSESSORS PARCEL NO: LEGAL DESCRIPTION:
Building Owner:
DIMENSIONS:
Contractor:
TOTAL HABITABLE SPACE:
Name: ���.� C/-fir/2 EP✓
/L/ciY=' /-)
Name:
90J �G2F7—
Address: / S Z S -
VG—
ktiOX"l2—
Address:�Oc7 ZO11
/00
�C/
City: SPU,e.v.��,� VAr
state: WA Ztp:'j' -?'
/c
CrtyS�ar o.�„5 V/ " :•
State:.. ZtP )`77r t
Phone: 9 2S' i fj it C3
Fax:
Phone: �C7 _el0
Fax:
FINISHED BASEME
GARAGESQ. FTG:
Contractor LieNo:
Exp Date:
SQ. FTG:
c.Fau6'
C
Contact Person
CONSTRUCTION TYPE:
City Business Lia No:
SEWER OR SEPTIC?
Name:
Phone:
Dscribe the scope of work in detail: Cost of Project: $
3 7CJ0 U OF
i 5��.,./gu.�.v:..JG i'i7 , GTUr p. TO
-C
Proposed
zW n. ��� `T I;/C T T � IN MR��/' ''-Vj �'JO/s� w�TH f� i•/o2
Proposed Use:
**************The following MUST be complete: (write N/A if not applicable)**********************
HEIGHT TO PEAK:
DIMENSIONS:
# OF STORIES:
TOTAL HABITABLE SPACE:
T3s
}!'
90J �G2F7—
MAIN FLOOR TO SQ.
2 FLOOR SQ. FTG:
UNFIN BASEMENT SQ. FTG:
IMPERVIOUS SURFACE
FTG:
AREA:
FINISHED BASEME
GARAGESQ. FTG:
DECK/COV. PATIO SQ. FTG:
30% SLOPES ON
SQ. FTG:
PROPERTY:
# OF BEDROOMS:
CONSTRUCTION TYPE:
HEAT SOURCE:
SEWER OR SEPTIC?
The pernilee verges, acknowledges and agrees by their signature that: 1) If this permit is for construction of or on a dwelling, the
dwelling is/will be served by potable water. 2) Ownership of this City of Spokane Valley Permit more to the property owner. 3) The
signatory is the property owner or has permission to represent the property owner in this transaction. 4) All construction is to be done
in full compliance with the City of Spokane Valley Development Code. Referenced codes are available for review at the City of
Spokane Valley Permit Center. 5) This City of Spokane Valley Permit is not a permit or approval for any violation of federal, state or
local laws, codes or ordinances. 6) Plans or additional information may be required to be submitted, and subsequently approved before
this application can be processed.
SIGNATURE: DATE: /—/ 7,0
Method of Payment
❑ Cash '91 Check ❑ Mastercard ❑ VISA
BankcardM Expires: VINM
Authorized Signature:
R�saov+sror
SCMOF
rane
jVa11eyQ
11703 E Sprague Ave Suite 8-3 # Spokane Valley WA 99206
509.688.0036 ♦ Fax: 509.688.0037 ♦ cityhatt@spokanevalley.org
Residential Plan Submittal Minimums
❑ Completed Building & Mechanical application with: Accurate address, Parcel
Number and/or Legal Description, description of work, owner and contractor
information, signature, and date.
❑ Two sets of plans including Site Plan, elevations, floor plans, foundation plans
With details, roof plan, framing plans & details.
Cl Show the height of any proposed buildings or accessory structures.
❑ Floor plan for each floor: Dimension to scale (minimum 1/8") and label each
Room (including sq. footage of house and garage on plans) Show each
level of existing house and square footage of any additions.
❑ All braced wall panel types: show locations and details of installation, including
engineered design.
❑ Egress windows: Provide at least one window or exterior door approved for
Emergency escape or rescue from a basement and in every room for sleeping.
❑ Smoke detector locations
❑ 22" X 30" attic access location
❑ 18" X 24" crawl space access:
o One-hour separation detail: between house and garage
❑ Floor framing details: Joist type, size, spacing and installation details
❑ Roof framing plan and details
❑ Furnace and hot water heater location.
❑ All header locations: type, size, and connections
❑ Foundation plan
❑ Insulation information
Spokane
40;00va
Site Address: 6523 E 8TH AVE
Parcel Number: 35242.2610
Zoning: MF -1
Fire District: FD 01
Project
Transmittal
Q, of Spokane Valley
C'mMu�.q Development
Dcp..m .t
11703 E. Sprague Ave, Suitc B3
Spokane Valley, WA 99206
Phone: 509.688.0036
Previous prnapp mewing
Plaurevisiovs
Transmilta/Date:
Thursday, J uary 17, 2008
Project Number: 08000156
Water District EASTSPOKANE
Applicant: BELFOR CONSTRUCTION
10020 E. KNOX, SUITE 100
SPOKANE, WA 99206
(509)893-0001
e-mail:
Contact: BELFOR CONSTRUCTION
10020 E. KNOX, SUITE 100
SPOKANE. WA 99206
(509)893-0001
Owner. RICHESON, DANIEL J & LAUREN A
6523 E 8TH AVE
SPOKANE VALLEY, WA 99212-052
e-mail:
Occupant:
e-mail:
e-mail:
Contractor: BELFOR CONSTRUCTION Arch /Engineer:
10020 E. KNOX SUITE 100
SPOKANE. WA 99206
(509)893-0001 1
e-mail:
Project REPAIR FIRE DAMAGE TO EXISTING STRUCTURE
Description:
Please send all plan review and project comments via e-mail to the
highlighted individuals.
For City Use Only
SFY OF PLUS Project Number .v
pOkalle Project Address
jValley°
11703 E Sprague Ave Suite B-3 ♦ Spokane Valley WA 99206
509.688.0036 * Fax: 509.688.0037 * permitcenter@spokanevalley.org
As part of our on-going commitment to customer service during the review process of your project
application, we are providing you with a TARGET DATE for the initial technical application review. If for
any reason we cannot meet this date, we will contact you with a revised target date.
Your application review TARGET DATE is s\ i; -_ � \ ", ,k
The TARGET DATE is the date we estimate your project application will have had its initial technical
review. It is not the date for approval or permit issuance.
Tips for a Smoother Project Application Review
7 Submit complete, accurate plans and documents.
Extra time may be required for re -submittals as project application reviewers work on multiple applications and it
may be several days before they can look at your new or revised information.
Designate a specific contact person to communicate with the City.
While the person designated as the applicant's contact person with the City can be changed, one individual with the
expertise for dealing with reviewer comments would be the best choieefor the entire review process.
Call staff regarding the status of your project only after the target date shown at the top of the page.
Although van should be contacted on or by the target date, please feel free to contact us Jyou haven't heard from us
by your target date. Stall may contact you before the target date if the initial review is complete. By following this
procedure, you will save time and allow the reviewers to complete the work more expeditiously.
Steps in the Permit Process
1. Counter Complete. Your application has been accepted as counter complete. This means all of the required
documents, as indicated on your Pre -Application Checklist have been submitted or have been approved for deferred
submittal. This does not prevent technical staff from requesting additional information as a result of their technical review.
2. Quality Check. The next step in the process is a quality check to make sure that the application is reviewable and free
from substantive flaws that would prevent technical staff from completing the technical review once it is started. When
this step is complete, your application will be routed to the appropriate staff and remain in their review queue until it
comes up for review.
3. Technical Compliance. Once an application is administratively complete, it is routed to technical staff for compliance
review. Depending on the type of project, technical staff may include multiple reviewers. You should be contacted by
phone, fax, email, or mail by your TARGET DATE once the initial technical compliance review is complete.
4. Permit Issuance. When the technical compliance review of the application is complete, including any subsequent re -
submittals, each reviewer will approve their section of the application and route it to the Permit Center. When all sections
of the application are received, a Permit Specialist will process the application and contact the person specified on your
application for permit pick-up. Information regarding fees and pre -construction meetings (if required) will be provided by
the Permit Specialist at that time.
WHITE -APPLICANT PINK -BUILDING FILE REV 9107