Loading...
2006, 06-19 Permit: 06004045 SewerSPOKANE COUNTY DEPARTMENT OF BUILDING cit PLANNING SPDKWCOU' lY 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 6523 E STH AVE Project Number: 06004045 Inv: 1 Issue Date: 6/192006 Permit Use: SEWER CONNECTION Parcel Number: 35242.2610 Payment Summary Subdivision: RANGE AmountPaid $100.00 Applicant: Al DRAIN & SEWER SERVICE INC Tran Date 6/19/2006 Block: 2 Lot: 4&5 PO BOX 1586 VERADALE, WA 99206 Phone: (509) 891-2280 Zoning: UNK Unknown Contact: AlDRAIN & SEWER SERVICE INC Owner: RICHESON, DANIEL 1 & LAUREN A PO BOX 1586 Address: 6523 E STH AVE VERADALE, WA 99206 Phone: (509) 891-2280 SPOKANE, WA 99212-0527 Setbacks- Front Left: Right. Rear: Building Inspector: water Dist: Group Name: Project Name: Permits Sewer Connection Permit Contractor. A -I DRAIN AND SEWERSERVICE License#: AIDRASS976DU SEWER CONNECTION 1 $85.00 PROCLSSINGPFF I 515.00 Total Permit Fee: $100.00 FOR SEWER I NSPECTIONS CALL THE UTI LITIES DEPT AT (509) 477-3604 FROM 8.30-5:00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED. PERMIT ALLOWS FOR A 30 -MINUTE INSPECTION. ADDITIONAL INSPECTION FEES APPLY AFTER 30 MINUTES - THE INSTALLER IS RESPONSIBLE TO INSURE ALL WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS TO FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. SEWER STUBS ARE TO BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT THE JOB SITE AT THE SCHEDULED INSPECTION TIME. BOTH STATE LAW RCW 19.122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. CALL I-800-424-5555 BEFORE YOU DIG --AT LEAST WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH ALL REQUIREMENTS OF THE WA STATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCH SAFETY. Processed By: CUMMINGS, KATHY PERMIT Printed By: HINTZ, FAITH Page I of I Payment Summary Total Fees 5100.00 AmountPaid $100.00 AmountOwine $0.00 Tran Date 6/19/2006 Reeei t N 3242 Payment And $100.00 Processed By: CUMMINGS, KATHY PERMIT Printed By: HINTZ, FAITH Page I of I NOTICE It is the responsibility ofthe app Iicratpermittee to see met the use described on the front vital permit ccrop Itca with applicable codes and requirements and that required inspections are requested. Failure to request inspection, as listed below and obtain the necessary approval, before progressing beyond the paint where inspections are squired may aeccssimte removal efceeain pans of the construction at the appricant's/permitrro'.s or property owner's expense. At a minimum, the Ibllowing inspections ARE REQUIRED by County Code: I. FOOTING - when forms and runlorcement are in place and prior to placement of concrete all structures, including manufactured homes. NOTE: This inspection includes review ofthc strucmre'a sdback, Gom property lines. Minimum setbacks are established by County zoning regulations_ typically, side and rear yard setbacks are mrnxured from property lines, while setbacks for yards sharing streets are measured from the progeny line or center line of the madway right-ofway, whichever provides the greater setback tiom the center line mf the roadway right-of-way_ Curb lines and novo lines are not necessanly indieo- tive of progeny lines. In some residential areas, the County can own as much as 20 feet ofedo of ., between your property and the actual impmved zrecreant, The responsibility to comply with applicable setback provisions lies solely with the evocittce- neither Spokane County nor its authorized representatives assume any responsibility for the verification or location ofyour property lines. Please verify their location prior it) locating your structure Failure to properly locate the structure may require its relocation at the owner's/permittees expense. 2. FOUNDATION - when firms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place, and prior to concealing. 4. INSULATION -prior it) the installation ofdrywall_ 5. PLU NOTING -alter tough on, before ces ca g, and final. 6. MECHANICAL - rough -in of piping, before covering, metal chimneys belbre concealment, and final. 7. FINAL - when complete and prior to occupancy end/or use Please provide 24 hours notice- An permits require final inspection. ea la NOTE: In addition to inspection of the srs,this inspection includes review of o c improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of hydrants, her departermti ce......site drainage ("208 swales'), road improvements, parking, and landscaping are common requirements of a permit/site plan which must he completed prior to final approval of building or issuance of a Certificate ifOceupancy. 8. MANUFACTURED HOMES- Final inspection required when complete, stairs, handrails, skiling, em. Installed, and prior to occupancy, completed inspection retard cad must be available on site, Manufactured home installations must comply with the manufaaares installation instructions. 9. SEWERS - tracer cover 10. RIGII'r-OF-WAY/APPROACH -poor to placement of concrete, or, if gravel approach, alter completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, eta., must be inspected prior to cover. Check with the department lot' special inspections' In conjunction with commercial projects. FOR INSPECTIONS TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE. PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building plumbing, mechanical nnJ fire inspections.Department Road cuts for rarities or driveways, Division offeginearing& olBuilding and Code Enforcement Roads -48-HOUR NOTICE REQUIRED 477-3675 477-3600 or Stare Department.f Transportation Construction in afto.dpinin, Division of Engnewing&Roads 4563000 477-3600 • Saver connection, Division of Utilities • Electrical wiring, Slate Department of Labor and Industries 4793604 324-2640 or City Public Works Depanmem 625-6300 On-site waste disposal syrtem, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless narrow I,. noted, lits pcnnitis II be considered mull and void by limitation if the work authorized be the permit is not commonest or is stopped for a period of 180 days, unless a kronen request for an extension off, permit is received and approved by the Building Official prior to expiration. At a minimum an inspection should be requested at (cast once every 180 days to assure the validity of the permit A permit maybe renewed within one peat ofthe dale ofexpimtion for one-balfthe original fee, subject o certain lirommons— leaaecall us it on have any questions_ Any refund requests in oat be made in writing by the appbwnVpermittee (shown on the reverse) no later than Igo days after the date of fee payment. ReI-&, of more than 80% of the permit fee paid maybe amborized when no work has been done under the permit No refunds may be auditioned more than 180 days after ice payment. MISTAKE? Ifyou mink we've made an error in processing this permit or in conducting inspections penaining to it, or find crroncous information in the permit, please bring it to our attention immediately by filing a written request for correction within 10 working days of discos cry. All such requests should be directed to the Division of Building and Code Entbmement a, me below address. Spokane County Department of Building and Planning 1016 West Broadway Avenue, Spokane, WA 99260 Phone: (509) 477-3675 Fax: (509) 477 4703 TDD: (509) 477-7133 www.spokanecountyorg/bp bp@spokanecounty.mfg """