Loading...
2009, 05-28 Permit: 09002327 SewerSite Address: 6524 E 81H AVE SPOKANE COUNTY DEPARTMENT OF BUILDING & PLANNING 1026 WEST BROADWAY AVENUE e SPOKANE, WA 99260-0050 Parcel Number: 35243.0103 Subdivision: APPLE WAY HEIGHTS Block: Lot: Zoning: MFS Owner: TROYER, MICHAEL Address: PO BOX 293 $100.00 CHATTAROY, WA 99003 - Building Inspector: MARK WALKER Water Dist: LAS'FSPOK.ANE Information Project Number: 09002327 Inv: 1 IssueDate 5128,2009 Permit Use: SEWER CONNECTION Applicant: ACME EXVACA TING 6806 S LINKERD GREENACRES, WA 99016 Contact ACME EXVACATING 6806 S LINKE RD GREENACRES, WA 99016 Setbacks- Front: Left Right: Permits Group Name: Project Name: Seer Connection Permit Contractor: ACME EXCVT&SEWER BORING CO License#: ACMEEES963LD SEWERCONNECDON 1 $8500 PROCBSSINGFEE Phone: (509) 228-0691 Phone: (509)228-0691 Rear: 1 $15.00 Total Permit Fee: $100.00 -FOR SEWER INSPECTIONS CALL TI IE UTILITIES DEPT AT (509) 477-3604 FROM 8:30-5 00 MONDAY -FRIDAY PRIOR TO COVER. ONE WORKING DAY NOTICE REQUIRED, PERMIT ALLOWS FOR A 30 MINUTF INSPECTION. ADDITIONAL INSPECTION PEES APPLY AFTER 30 MINUTES. —INSTALLER IS RESPONSIBLE TO INSURE At 1. WASTEWATER DRAINS ARE CONNECTED TO THE SEWER AND MAY BE REQUIRED TO PERFORM TESTS FOR VERIFICATION. INSTALLER IS 10 FIELD LOCATE AND CONFIRM THE ELEVATION AND POSITION OF SEWER STUB PRIOR TO ANY OTHER EXCAVATION. '-SEWER STUBS ARE 10 BE CHECKED PRIOR TO CONNECTION TO ENSURE THAT THEY HAVE ACCEPTABLE GRADE AND ARE CLEAR AND UNOBSTRUCTED TO THE MAIN. SEWER LINES SHOULD BE CONSTRUCTED TO ALLOW FOR GRAVITY FLOW FROM THE LOWEST LEVEL OF THE STRUCTURE. "THE INSTALLER AND THIS PERMIT MUST BE PRESENT AT TI IE JOB SITE AT THE SCHEDULED INSPECTION TIME BOTH STATE LAW RCW 19122 AND COUNTY CODE REQUIRES THE INSTALLER TO GIVE NOTICE OF EXCAVATION TO OWNERS OF UNDERGROUND FACILITIES. %'CALL I-8001124-5555 BEFORE YOU DIG --AI' LEAST2 WORKING DAYS IN ADVANCE. SPOKANE COUNTY CODE REQUIRES THE INSTALLER COMPLY WITH AI. I. RE.QUIREMFNTS OF THE WAS PATE DEPT OF LABOR & INDUSTRIES, INCLUDING THOSE RELATED TO TRENCI I SAFETY. Processed By: DOMPIER, DAWN PERMIT Printed By: HINTZ, FAITH Page I of I Payment Summary Total Fees Am mdPaid AmountOW in¢ Tran Date Recce Pavment Amt $100.00 $100.00 $0.00 5/282009 2027 $100.00 Processed By: DOMPIER, DAWN PERMIT Printed By: HINTZ, FAITH Page I of I NOTICE It is the responsibility of the applicanteperminee to see to It that the use described on the front of this permit complies with applicable codes and requirements and that required Inspections are requested. Failure to request Inspections as listed below and obtain the necessary approvals before progressing beyond the point where Inspections are required may necessitate removal of certain pans of the construction at theapplicant's/pormi tee's or property owners expense. At a minimum, the following Inspections ARE REQUIRED by County Code: 1. FOOTING - all structures. Including manufactured homes when forms and reinforcement are in place and prior to placement of concrete. NOTE'. This Inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations. Front, flanking, side and rear yard setbacks are measured from property Ilnss. Curb lines and fence lines are not necessarily indicative of property linos. In some residential areas, the County can awn as much as 20 feet of right-of-way between your property and the actual Improved stryi Curb - The responsibility to comply with applicable setback provisions Iles solely with the permittee—neither Spokane County nor its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prior to locating your structure- Failure to properly locate the structure may require Its relocation at the owner 's/permlttee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking is in place plumbing, mechanical rough in Inspections have been approved and prior to ng- 4- INSULATION - prior to the Installation of drywall. 5. PLUMBING- after rough In, before coveringand final. 6. MECHANICAL - rough,ln of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - all permits - when complete when complete and prior to occupancy and/or use. Please provide 24 hours notice. NOTE: In addition to Inspection ed the structure. this Inspection includes review of site improvements (typically depicted on the approved site plan) required by ordinance or as a condition of approval of this permit Items such as the installation of fire hydrants, fire department access, on-site drainage ("208 swales"), road improvements, parking, and landscaping are common requirements of a permlbslte plan which must be completed prior to final approval of a building or Issuance of a Certificate of Occupancy 8. MANUFACTURED HOMES - foundation Inspections prior to pouring pacts, Inspection of Blocking/Tie-dawns. when completed per manufacturers installation instructions. Final Inspection approval prier to occupancystairs, handrails. skining, etc ., Installations completed WAINSTagls)must be affixed to the home, completed inspection record card and manufacturers Installation Instructions must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAVIAPPROACH - prior to placement of concrete, or, if gravel approachafter completion. In addition to the aboveany plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, eta.. nwst be inspected prior to cover- Check with the department for "special inspections" in conjunction with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAV/24 HOUR NOTICE PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building plumbing mechanical and fire inspections, Department Road cuts for utilities or driveways, Division of Engineering& of Building & Planning 477-3675 Roads - 48-HOUR NOTICE REQUIRED 477-3600 or • Construction In a flood plain. Division of Engineering & Roads 477-3600 State Department of Transportation 456-3000 • Electrical wiring, State Department of Labor and Industries 324-2640 Sewer connection. Division of Utilities 477-3604 or City Public • On-site waste disposal system Spokane Regional Health District Works Department 625-6300 3241560 PERMIT EXPIRATION Unless otherwise noted, building, plumbing, fire and mechanical permits will be considered null and void by limitation If the work authorized by the permit is not commenced within 180 days or is stopped fora period of 180 days, unless n written request for an extension of the permit is received and approved by the Building Department prior to expiration- At a minimum an Inspection should be requested at least once every 180 days to assure the validity of the permit. Please call if you have any questions. REFUNDS All requests for building permit refunds must be made In writing by the applicant permitter, (shown on the reverse) no later than 180 days after the date of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized more than 180 days after fee payment. Please contact the other agencies with respect m their refund policy on all other permit types MISTAKE? Ifyou think we've made an error in processing this permit or find erroneous information on the permlf, please bring itto our attention immediately by filing e written request for correction within 10 working tlays of discovery- All such requests should be directed terns Department of Building and Planning at .Spokane L'ounty Deportation of Building & Planning 1016 11'e,et Brouda'ar Arent.. Spokane, HT! 99_'6/1 Phone: (509) 477-3675 Far: (509) 477-4703 TDD: (509) 477-7[33