Loading...
2003, 11-04 Permit: 03007963 SewerSPOKANE COUNTY DIVISION OF BUILDING AND CODE ENFORCEMENT 1026 WEST BROADWAY AVENUE • SPOKANE, WA 99260-0050 Site Information Project Information Site Address: 6603 E 8TH AVE SPOKANE, WA 00000 Parcel Number: 35242.2638 Subdivision: AmountPaid Black: Lot: Zoning: UNK Unknown Owner: CARTER, DELBERT E Address: 66031. STH AVE 7050 SPOKANE, WA 99212-0588 Building Inspector: FPALADICHUK Water Dist: Project Number: 03007963 Inv: I Issue Date: 11/4,2003 Permit Use: SEWER CONNECTION - WOODIAWN Applicant: VIS TA CONST RUCTION &DEV 3420 N "I'SCHIRLEY RD SPOKANE, WA 99216 Phone: (509) 926 2243 Contact: VIS "IA CONSTRUCTION &DEV 3420 N TSCLIF LEY RD SPOKANE„ WA 99216 Phone: (509) 926-2243 Setbacks -Front: Left: Right: Rem': Group Name: Project Name: Permits Sewer Connection Permit Contractor: VISTA CONSTRUCTION&DP.VELOPME License#: VISTACD999DF. _. SEWERCONNECTION 1 $5500 PROCESSINGFEE S15 A0 Total Permit Fee: $100.00 FOR SEWER INSPECTIONS CALL (509) 477-3604 UTILITIES 8:305:00 PM MONDAY IHRU FRIDAY Call for inspection prior to cover_ ONE WORKING DAY NOTICE REQUIRED. Contractor or applicant is to field locate and confirm lite elevation and position of sewer stub prior to any other excavation_ Sewer stubs are to be checked prior to connection to ensure that hey have acceptable grade and arc clear and unobstructed W the main sewer_ Sewer lines should be constructed to allow for gravity flow from the lowest level of the structure. This permit must be presented to the job site inspector for verification. 'Io locate buried cables, gas piping, water lines, em. CALL BEFORE YOU DIG, (509)456-8000. STATE LAW KEW 19.122 REQUIRES IT IAT PRIOR TO ANY EXCAVATION THE "CALL BEFORE YOU DIG" CENTER BE NOTIFIED. CALL BEFORE YOU DIG AT LEAST 2 WORKING DAYS IN ADVANCE, (509)456-8000. Spokane County Cade requires the installer comply with all requirements of the Washington State Dept of Labor and Industries, including those related to trach eaters. Processed By: BURRIS, ROBIN PERMIT FILE Printed By: WENDEL, GLORIA Page I cf I Payment Summary Total Fees AmountPaid Amount0wine Tran Date Receipt Pavment Amt S100-00 $100.00 $0.00 I V4/2003 7050 $10000 Processed By: BURRIS, ROBIN PERMIT FILE Printed By: WENDEL, GLORIA Page I cf I NOTICE It Is the responsibility of the appllcaut/permltlee, not Spokane County, to see to II that the use described on the front of this permit complies with applicable cedes and requirements and that required Inspections are requested Failure to request required inspections and obtain the necessary approvals prier to progressing beyond the point where inspections are re pec lowing may necessitate removal of certain parts of the construction at the applicanfsrpermlltee s or property owners expense. Al a minimum, the following inspections ARE REQUIRED by County Cotle. I - FOOTING - when forms and reinforcement are In place and prior to placement of concrete—all structures, Including manufactured homes. NOTE: This inspection includes review of the structure's setbacks from property lines. Minimum setbacks are established by County zoning regulations Typically side and rear yard setbacks are measured from property Imes, while setbacks for yards abutting streets are measured from the property line or the center line of the roadway right-of-way, whichever provides the greater setback from the center line of the roadway right-of- way. Curb lines and fence lines are not necessarily indicative of properly lines. In some residential areas, the County can own as much as 20 feet of right-of-way between your property and the actual improved street/curb. The responsibility to comply with applicable setback provisions lies solely with the permittee—neither Spokane County nor Its authorized representatives assume any responsibility for the verification or location of your property lines. Please verify their location prier to locating your structure. Failure to properly locate the structure may require Its relocation at the ownera/permibee's expense. 2. FOUNDATION - when forms and reinforcement are in place and prior to placement of concrete. 3. FRAMING - after all framing, bracing and blocking Is In place, and prior to concealing. 4. INSULATION - prier to the installation of drywall. 6. PLUMBINGafterrough-In, before covering, and final. 6- MECHANICAL - rough -In of piping, before covering, metal chimneys before concealment, and final. 7. FINAL - when complete and prier to occupancy and/or use. Please provide 24 hours notice. All permits require final inspection. NOTE: In addition to inspection of the structure, this inspection includes review of site Improvements (typically depicted on the approved site plan) required by Ordinance or as a condition of approval of this permit. Items such as the installation of fire hydrants, fire department access, on-alte drainage ("208 awales"), road improvements, parking, and landscaping are common requirements of a permiUsile plan which must be core plated prior to final approval of a building or Issuance of a Certificate of Occupancy. 8. MANUFACTURED HOMES - Final inspection required when complete, stairs, handrails, skirting, etcinstalled, and prior to occupancy, completed inspection record card must be available on site. 9. SEWERS - prior to cover 10. RIGHT-OF-WAV/APPROACH - prior to placement of concrete, or, if gravel approach, after completion. In addition to the above, any plumbing or mechanical systems or material which would be concealed by framing, drywall, concrete, etc., must be Inspected prior to cover. Check with the department for "special inspections" in cenjuncOOn with commercial projects. FOR INSPECTIONS: TO INSURE PROMPT SERVICE, PLEASE GIVE ONE WORKING DAY/24 HOUR NOTICE . PARTS OF YOUR PROJECT MAY REQUIRE PERMITS AND INSPECTIONS FROM MORE THAN ONE AGENCY. • Building, plumbing, mechanical and fire Inspections, Division • Road cuts for utilities or driveways, Division of Engineering & of Building and Code Enforcement Roads - 48-HOUR NOTICE REQUIRED 477-3676 4773600 or State Department of Transportation • Construction in a flood plain, Division of Engineering & Roads 456-3000 477-3600 • Sewer connection, Division of Utilities • Electrical wiring, Stale Department of Labor and Industries 4773604 324-2640 or City Public Works Department 625-6300 • On-site waste disposal system, Spokane Regional Health District 324-1560 PERMIT EXPIRATION AND REFUNDS Unless ethembre noted, this permit will be considered null and void by limitation if the work authorized by the permit is not commenced or Is stopped for a period of 180 days, unless a written request for an extension of the permit Is received and approved by the Building Official prior to expiration- At a minimum an inspection should be requested at least once every 180 days to assure the validity of the permit. A permit may be renewed within one year of the date of expiration for one-half the original lee, subject to certain limitations—please call us If you have any questions. All refund requests must be made in writing by the applicanrypermieee (shown on the reverse) no later Nan 180 days after the data of fee payment. Refunds of not more than 80% of the permit fee paid may be authorized when no work has been done under the permit No refunds may be authorized more than 180 days after fee payment MISTAKE? Ifyou think we've made an error in processingthis permit or in conducting inspections pertaining to It or find erroneous information in the permit, please bring it to our attention Immediately bfiling a written request forcorrection within 10 working days of discovery, All such requests should be directed to the Division of Building and Code Enforcement at the below address. Spokane County Division nfBuilding& Code Enforcement 1026 West Broadway Avenue Spokmre, WA 99260 Phiri (509) 477-3675 Fax.(509) 477-4703 TDD: (509) 477-7133